JOB
Happy Trails Utility Access
BID DATE
07/12/12 - 2:00 LIVE!
AGENCY
City of Surprise
ESTIMATE
n/a
SCOPE
The scope of work will be for the construction and placement of up of to 14 manholes. The existing sewer lines within Happy Trails were built with cleanouts but without manholes. The existing sewer lines do not meet current City specifications; in addition, some of the lines have sagged causing backups and odor issues. In most of the Happy Trails development the cleanouts are too small to allow the Public Works Utilities Operations Division the use of their equipment to clean the sewer lines properly. The placement of the utility access ports is critical to the Collection Crew who has to maintain these lines on a continuous basis. The VAK truck that is used currently can only reach 500’ to clean out the sewer lines, with the addition of the new utility access ports the Operations group will be able to clean the sewer lines and reduce odor issues within the area.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT