Access the Full Project by Clicking here!
Bidjugde
JOB
Bagdad Airport Road Reclamation
BID DATE
01/12/17 - 2:00
AGENCY
Yavapai County
ESTIMATE
$977,100
SCOPE
ud at 2:00 p.m. on Thursday, January 12, 2017. The scope of work for this project includes furnishing all labor, materials, equipment, fixtures and services required for a Full-Depth Reclamation (FDR) of Bagdad Airport Road near Bagdad, Arizona; all in accordance with the plans, specifications and contract documents. The beginning of the project is located at the Bridle Creek box culvert on Lindahl Road and ends 1.1 miles north on Bagdad Transfer Station Road. Project work includes: placement of approximately 7,000 tons of asphaltic concrete, approximately 19,000 square yards of pulverized in-situ materials (10” to 16.5”) and utilize 10” of the FDR material for compacted road base course, removal of over 600 cubic yards of subgrade FDR material, roadway grading, shouldering, side street and driveway matches, extending three existing 30” culverts, backfilling/ embankment fill of over 40 cubic yards, drainage improvements to include 7 check dams, over 800 cubic yards of roadway excavation and restoration of roadway striping and markings
PREBID
1/3/2017 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT