Lake Mary Road AZ FLAP
BID DATE
03/24/17 - 5:00
AGENCY
Department of Transportation
ESTIMATE
$12,000,000
SCOPE
NO BID DATE YET UNTIL JAN 2017: The project includes 4R improvement of portions of Forest Highway 3, also known as Lake Mary Road in Coconino County Arizona. The project is also within the Coconino National Forest. The project consists of minor shoulder widening, pulverizing of pavement, new pavement 4R work includes removal of Willow Creek Bridge deck and replacing with a widened bridge deck on existing substructure. The project includes new guardrail approaches, final signing and striping. There are minor culvert pipe extensions with the shoulder widening and one large box culvert replacement. Total of 15,000 CY of Embankment, 139,000 SY of Full Depth Reclamation, Method 2, 8 inch depth, 145,000 SY of Prime Coat Method 1, 102,000 LB of Reinforcing Steel, 33,000 LB of Reinforcing Steel Epoxy, 102,300 LB of Structural Steel Furnished, Fabricated and Erected, 120,000 LF of Rumble Strip,8,000 CY of Conserved Topsoil,15,000 Tons of Roadway Aggregate Method 2, 30,000 Tons of Asphalt Concrete Pavement, 252 CY of Structural Concrete, 85 LF of Reinforced 12 foot x 9 foot Precast Reinforced Box Culvert,201 LF of Guardrail System G4 Craig Holsopple, Contract Specialist craig.holsopple@dot.gov direct link> https://goo.gl/n3hVeH

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT