Access the Full Project by Clicking here!
Bidjugde
JOB
2017 CDBG Citywide Curb Ramp Installation
BID DATE
12/20/16 - 3:00
AGENCY
Cupertino
ESTIMATE
n/a
SCOPE
Work generally consists consisting of installing the required construction of ADA Curb Ramps remove and reconstruct certain curbs, gutters and sidewalks, and adjust to grade existing traffic boxes, meters and others city owned facilities, relocate signs, and remove and replace pavement striping and legends, within the limits of the new ADA curb ramps. All new curb ramps shall have detectable warning surfaces installed as part of the ramp as required, according to plans and specifications prepared by the City of Cupertino and according to the contract documents

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT