Street Rehabilitation FY 2017
BID DATE
01/19/17 - 2:00
AGENCY
Berkeley
ESTIMATE
$2,100,000
SCOPE
The work done under these specifications includes but is not limited to: traffic control, base failure repairs, pavement milling, pavement profile milling, removal and disposal of pavement surfaces and base materials, subgrade preparation, proof rolling including over-excavation, stabilization and compaction, aggregate base course, hot-mix asphalt (HMA) paving, rubberized hot-mix asphalt paving (RHMA), adjustment of valve boxes, protection and relocation of underground utility services (e.g. gas, water sewer, electrical, telecomm), concrete curbs, sidewalk, curb ramps, cross drains at curb ramps, storm drain pipe replacement, storm drain inlets, traffic loops, and pavement markings, striping, and markers as specified.