Access the Full Project by Clicking here!
Bidjugde
JOB
Intersection Improvements Golden St Fulkert
BID DATE
01/12/17 - 2:00
AGENCY
Turlock
ESTIMATE
$1,984,000
SCOPE
The work consists, in general, of: pavement grinding, demolition of concrete and asphalt concrete surfaces, demolition of existing traffic signal equipment, installation of minor concrete curb, gutter, and sidewalk, roadway widening, hot mix asphalt pavement, installation of new traffic signal equipment including conduit, conductors, traffic signal poles and masts, signal heads, pedestrian push buttons, pedestrian countdown heads, roadway lighting, traffic signal cabinet and controller with enhanced railroad preemption circuitry, railroad coordination, and furnishing all necessary labor, materials, tools, equipment and incidentals needed to perform the improvements as shown on the contract plans complete and in place. An Optional Pre-Bid meeting will be held on Thursday, January 5th, 2:00 PM at Turlock City Hall, 156 S. Broadway Turlock, CA 95380. Technical Contact: Stephen Fremming Contact Email: sfremming@turlock.ca.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT