bid results
Installation Ductile Iron Water Mains Altadena Dr Marengo Ave
$1,796,146
8.03%
$1,947,500
$1,973,754
$2,075,935
$2,236,085
$2,291,210
$2,479,686
$3,109,214
$3,946,493