- Granite Construction - AZ
- 2026
- 46
- 10
- 21.74%
- $52,626,649
- 5.21%
- 23.02%
- 7.53%
- $323,781,660
- Granite Construction - CA
- 2026
- 189
- 25
- 13.23%
- $142,792,796
- 5.20%
- 20.97%
- 10.35%
- $1,793,077,819
- Granite Construction - NV
- 2026
- 7
- 0
- 0.00%
- $0
- 0.00%
- 22.53%
- 5.89%
- $247,959,060
- Granite Construction - UT
- 2026
- 41
- 3
- 7.32%
- $5,763,482
- 2.40%
- 22.32%
- 9.28%
- $223,363,545
- Granite Construction - TX
- 2026
- 13
- 1
- 7.69%
- $10,965,650
- 4.77%
- 54.83%
- 26.40%
- $645,947,413
- Granite Construction - WA
- 2026
- 91
- 9
- 9.89%
- $22,916,302
- 9.70%
- 23.76%
- 8.52%
- $346,109,708
- Granite Construction - OR
- 2026
- 37
- 5
- 13.51%
- $8,107,084
- 6.28%
- 33.42%
- 14.67%
- $69,997,264
- Granite Construction - FL
- 2026
- 9
- 1
- 11.11%
- $6,294,664
- 6.29%
- 32.35%
- 10.24%
- $161,304,897

Recent low bids totaling **$12.3M** backlog, including **$3.8M** US 30 Wonderly Rd and **$2.4M** 2026 Street Preservation projects, will sustain positive cash flow through project starts and progress billings. Long 120-month durations on most awards spread revenue but support steady operations.
Medium-term Outlook (6-12 months)
Elevated 2026 bidding volume of **$66.8M** at a reduced **12.9%** success rate may replenish backlog if win rates stabilize, supporting continued growth beyond current **$12.3M** level. Execution of 2025 awards (**$5.0M** total low) provides additional runway.
Key Risk Period
Depletion of the **$12.3M** backlog becomes critical after 6 months if the declining success rate persists, exposing gaps in new contract awards and potential cash flow shortfalls.
Recommendations
Prioritize bid strategy refinements to lift success rates above **12.9%** while accelerating mobilization on recent awards to maximize near-term collections.
- OR35 White River East Fork Hood River Paving Multiple Locations
- ODOT
- 7/14/26
- I 84 Eastbound Rieth Road OR11 Section
- ODOT
- 4/16/26
- US 30 Wonderly Rd Rockcrest St Rainier Section
- ODOT
- 4/9/26
- Durham WRRF Road Repair Replacement No 7293
- Clean Water Services
- 4/7/26
- 2026 Street Preservation
- Bend
- 3/17/26
- OR35 White River East Fork Hood River Paving Multiple Locations
- ODOT
- $793,240
- 7/14/26
- FY26 Basewide Pavement Bundle
- Oregon Military Department
- $146,150
- 7/14/26
- Hwy 99E MP 11 82 12 20 Pavement Repair
- ODOT
- $377,987
- 7/8/26
- Hwy 43 MP 10 16 10 91 Pavement Repair
- ODOT
- $213,607
- 7/8/26
- US26 Government Camp OR35 Jct Paving Multiple Locations
- ODOT
- $660,780
- 7/7/26
- R2 Paving RFB US30 MP87 65 92 40 Overlay Paving
- ODOT
- $1,051,657
- 6/24/26
- 2026 52 Bakers Ferry Road Paving
- Clackamas County
- $1,682,184
- 6/24/26
- 2026 MBM OR 217 Various Locations Bridge Paving
- ODOT
- $892,892
- 6/18/26
- Manzanita NB SB Rest Area Paving Maintenance Improvements
- Travel Information Council
- $1,231,231
- 6/16/26
- US 97 Inlay Paving MP 113 6 MP 114 7
- ODOT
- $349,990
- 6/16/26
- I 84 Troutdale Corbett Maintenance Pave Multiple Locations
- ODOT
- $297,297
- 6/11/26
- 2026 Street Surfacing Inlay
- Gresham
- $2,137,137
- 6/4/26
- R2 Paving RFB US26 MP0 47 5 85 Inlay Paving
- ODOT
- $1,659,247
- 5/28/26
- 2026 SE Pavement Overlay
- Scappoose
- $387,387
- 5/26/26
- OR6 Wilson River Loop East MP 2 07 Tillamook
- ODOT
- $757,666
- 5/21/26
- 2026 Street Rehabilitation
- Prineville
- $907,896
- 5/19/26
- R2 Paving RFB US20 OR126E Overlay Paving
- ODOT
- $7,949,949
- 5/19/26
- R2 Paving RFB US101 MP91 8 Inlay Paving
- ODOT
- $132,959
- 5/15/26
- Copper Creek Outfall Stabilization
- Tigard
- $712,675
- 5/12/26
- HMAC Paving 2026
- Clatsop County
- $284,400
- 5/6/26
- 15th Ferguson RAB Construction
- Bend
- $5,152,152
- 5/6/26
- US26 US395 District 14 MBM 2026
- ODOT
- $122,225
- 4/30/26
- 2026 Neighborhood Street Safety Program Package B
- Bend
- $1,412,608
- 4/28/26
- 2026 Neighborhood Street Safety Program Package A
- Bend
- $1,886,516
- 4/28/26
- I 84 Eastbound Rieth Road OR11 Section
- ODOT
- $351,743
- 4/16/26
- US 30 Wonderly Rd Rockcrest St Rainier Section
- ODOT
- $3,759,675
- 4/9/26
- Durham WRRF Road Repair Replacement No 7293
- Clean Water Services
- $791,630
- 4/7/26
- OR128E MP 29 5 30 9 Paris Reservoir Landslide
- ODOT
- $8,974,796
- 4/2/26
- OR53 MP7 57 11 38 Overlay Paving
- ODOT
- $936,795
- 4/2/26
- Construction Asphalt Concrete Resurfacing Various Marion County Roads S-C25102-00015959
- Marion County
- $4,691,331
- 3/19/26
- 2026 Street Preservation
- Bend
- $2,410,796
- 3/17/26
- US101 MP352 6 Lone Ranch Slide
- ODOT
- $214,000
- 3/17/26
- 2026 Residential Chip Seal No ST26CS
- Bend
- $1,273,273
- 3/10/26
- 25PW15 Parrott Creek Culvert Replacements
- Roseburg
- $3,257,930
- 3/10/26
- Coos County OR42 MP 36 1 Rockfall Mitigation
- ODOT
- $776,530
- 1/29/26
- ITB North Fork Slide Stabilization Slide 2 North Fork Road SE
- Marion County
- $8,663,336
- 1/28/26
- NB Boone Bridge I 5 Over Willamette River MP 283 11 Joint Rehabilitation
- ODOT
- $2,695,597
- 1/14/26
- OR35 White River East Fork Hood River Paving Multiple Locations
- ODOT
- $793,240
- 09/12/26
- 120
- 0%
- -
- $793,240
- NB Boone Bridge I 5 Over Willamette River MP 283 11 Joint Rehabilitation
- ODOT
- $351,743
- 06/15/26
- 120
- 40.0%
- $87,936
- $211,046
- NB Boone Bridge I 5 Over Willamette River MP 283 11 Joint Rehabilitation
- ODOT
- $3,759,675
- 06/08/26
- 120
- 45.8%
- $939,919
- $2,036,491
- NB Boone Bridge I 5 Over Willamette River MP 283 11 Joint Rehabilitation
- Clean Water Services
- $791,630
- 06/06/26
- 120
- 47.5%
- $197,908
- $415,606
- NB Boone Bridge I 5 Over Willamette River MP 283 11 Joint Rehabilitation
- Bend
- $2,410,796
- 05/16/26
- 120
- 65.0%
- $602,699
- $843,779
- $1,828,462
- $4,300,162