- Granite Construction - AZ
- 2026
- 69
- 12
- 17.39%
- $64,443,151
- 5.86%
- 24.81%
- 9.61%
- $415,267,237
- Granite Construction - CA
- 2026
- 259
- 30
- 11.58%
- $203,325,481
- 5.34%
- 22.36%
- 10.22%
- $2,147,483,647
- Granite Construction - NV
- 2026
- 9
- 0
- 0.00%
- $0
- 0.00%
- 29.14%
- 10.90%
- $266,160,674
- Granite Construction - UT
- 2026
- 52
- 4
- 7.69%
- $13,105,570
- 2.92%
- 21.87%
- 9.24%
- $264,104,331
- Granite Construction - TX
- 2026
- 22
- 1
- 4.55%
- $10,965,650
- 4.77%
- 45.33%
- 21.06%
- $921,802,362
- Granite Construction - WA
- 2026
- 108
- 10
- 9.26%
- $23,615,651
- 9.14%
- 24.12%
- 8.90%
- $421,835,982
- Granite Construction - OR
- 2026
- 40
- 5
- 12.50%
- $8,107,084
- 6.28%
- 34.69%
- 14.87%
- $71,586,809
- Granite Construction - FL
- 2026
- 12
- 1
- 8.33%
- $6,294,664
- 6.29%
- 29.14%
- 8.46%
- $181,962,300

Granite Construction maintains a modest **$3.7M** remaining backlog across five active OR projects, providing limited but steady cash flow support through late 2026. Recent bidding volume rose sharply to **$70M** with a 13.5% win rate, though only **$8.1M** was secured, suggesting modest near-term revenue visibility.
Medium-term Outlook (6-12 months)
Backlog drawdown will accelerate given 120-month project durations and low remaining balances, requiring sustained bidding momentum to replenish work. Success rates have declined from 17.6% in 2025, limiting the ability to convert increased bid volume into executed contracts.
Key Risk Period
The primary risk emerges in the second half of 2026 as current backlog nears exhaustion without corresponding new awards, exposing the firm to cash flow gaps amid a 13.5% win rate.
Recommendations
Prioritize targeted bid strategies to improve win rates above 15% and accelerate pursuit of higher-volume paving and preservation projects. Monitor monthly backlog burn rate closely to trigger contingency bidding if remaining work falls below **$2M**.
- OR35 White River East Fork Hood River Paving Multiple Locations
- ODOT
- 7/14/26
- I 84 Eastbound Rieth Road OR11 Section
- ODOT
- 4/16/26
- US 30 Wonderly Rd Rockcrest St Rainier Section
- ODOT
- 4/9/26
- Durham WRRF Road Repair Replacement No 7293
- Clean Water Services
- 4/7/26
- 2026 Street Preservation
- Bend
- 3/17/26
- Rees Goad Way Pendleton
- ODOT
- $1,325,645
- 10/22/26
- TVWD ITB 2027-002 Asphalt Paving Services for SW Leslie St Main Replacement C12945
- Tualatin Valley Water District
- $169,100
- 10/20/26
- Kerby Entrance Ramp Pavement Repair
- ODOT
- $94,800
- 8/13/26
- OR35 White River East Fork Hood River Paving Multiple Locations
- ODOT
- $793,240
- 7/14/26
- FY26 Basewide Pavement Bundle
- Oregon Military Department
- $146,150
- 7/14/26
- Hwy 99E MP 11 82 12 20 Pavement Repair
- ODOT
- $377,987
- 7/8/26
- Hwy 43 MP 10 16 10 91 Pavement Repair
- ODOT
- $213,607
- 7/8/26
- US26 Government Camp OR35 Jct Paving Multiple Locations
- ODOT
- $660,780
- 7/7/26
- 2026 52 Bakers Ferry Road Paving
- Clackamas County
- $1,682,184
- 6/24/26
- R2 Paving RFB US30 MP87 65 92 40 Overlay Paving
- ODOT
- $1,051,657
- 6/24/26
- 2026 MBM OR 217 Various Locations Bridge Paving
- ODOT
- $892,892
- 6/18/26
- Manzanita NB SB Rest Area Paving Maintenance Improvements
- Travel Information Council
- $1,231,231
- 6/16/26
- US 97 Inlay Paving MP 113 6 MP 114 7
- ODOT
- $349,990
- 6/16/26
- I 84 Troutdale Corbett Maintenance Pave Multiple Locations
- ODOT
- $297,297
- 6/11/26
- 2026 Street Surfacing Inlay
- Gresham
- $2,137,137
- 6/4/26
- R2 Paving RFB US26 MP0 47 5 85 Inlay Paving
- ODOT
- $1,659,247
- 5/28/26
- 2026 SE Pavement Overlay
- Scappoose
- $387,387
- 5/26/26
- OR6 Wilson River Loop East MP 2 07 Tillamook
- ODOT
- $757,666
- 5/21/26
- R2 Paving RFB US20 OR126E Overlay Paving
- ODOT
- $7,949,949
- 5/19/26
- 2026 Street Rehabilitation
- Prineville
- $907,896
- 5/19/26
- R2 Paving RFB US101 MP91 8 Inlay Paving
- ODOT
- $132,959
- 5/15/26
- Copper Creek Outfall Stabilization
- Tigard
- $712,675
- 5/12/26
- HMAC Paving 2026
- Clatsop County
- $284,400
- 5/6/26
- 15th Ferguson RAB Construction
- Bend
- $5,152,152
- 5/6/26
- US26 US395 District 14 MBM 2026
- ODOT
- $122,225
- 4/30/26
- 2026 Neighborhood Street Safety Program Package B
- Bend
- $1,412,608
- 4/28/26
- 2026 Neighborhood Street Safety Program Package A
- Bend
- $1,886,516
- 4/28/26
- I 84 Eastbound Rieth Road OR11 Section
- ODOT
- $351,743
- 4/16/26
- US 30 Wonderly Rd Rockcrest St Rainier Section
- ODOT
- $3,759,675
- 4/9/26
- Durham WRRF Road Repair Replacement No 7293
- Clean Water Services
- $791,630
- 4/7/26
- OR128E MP 29 5 30 9 Paris Reservoir Landslide
- ODOT
- $8,974,796
- 4/2/26
- OR53 MP7 57 11 38 Overlay Paving
- ODOT
- $936,795
- 4/2/26
- Construction Asphalt Concrete Resurfacing Various Marion County Roads S-C25102-00015959
- Marion County
- $4,691,331
- 3/19/26
- 2026 Street Preservation
- Bend
- $2,410,796
- 3/17/26
- US101 MP352 6 Lone Ranch Slide
- ODOT
- $214,000
- 3/17/26
- 2026 Residential Chip Seal No ST26CS
- Bend
- $1,273,273
- 3/10/26
- 25PW15 Parrott Creek Culvert Replacements
- Roseburg
- $3,257,930
- 3/10/26
- Coos County OR42 MP 36 1 Rockfall Mitigation
- ODOT
- $776,530
- 1/29/26
- ITB North Fork Slide Stabilization Slide 2 North Fork Road SE
- Marion County
- $8,663,336
- 1/28/26
- NB Boone Bridge I 5 Over Willamette River MP 283 11 Joint Rehabilitation
- ODOT
- $2,695,597
- 1/14/26





