BidJudge.com - Projects
paul.harding@gcinc.com
81500 Lind Rd
Hermiston OR
97838
509-823-0641
Health Breakdown
Avg Left
20
Success
10
Avg Avg
5
Year Proj
50
2 Year Prior Proj
Qual Based
0
Cash Flow
-40
 
45%
45%
Health
Financial Health & Pipeline Brief
Analyzed On:  Jun 27, 2026
Granite Construction - OR (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
Recent low bids totaling **$12.3M** backlog, including **$3.8M** US 30 Wonderly Rd and **$2.4M** 2026 Street Preservation projects, will sustain positive cash flow through project starts and progress billings. Long 120-month durations on most awards spread revenue but support steady operations.

Medium-term Outlook (6-12 months)
Elevated 2026 bidding volume of **$66.8M** at a reduced **12.9%** success rate may replenish backlog if win rates stabilize, supporting continued growth beyond current **$12.3M** level. Execution of 2025 awards (**$5.0M** total low) provides additional runway.

Key Risk Period
Depletion of the **$12.3M** backlog becomes critical after 6 months if the declining success rate persists, exposing gaps in new contract awards and potential cash flow shortfalls.

Recommendations
Prioritize bid strategy refinements to lift success rates above **12.9%** while accelerating mobilization on recent awards to maximize near-term collections.
 
JOBS LOW
  • OR35 White River East Fork Hood River Paving Multiple Locations
  • ODOT
  • 7/14/26
  • I 84 Eastbound Rieth Road OR11 Section
  • ODOT
  • 4/16/26
  • US 30 Wonderly Rd Rockcrest St Rainier Section
  • ODOT
  • 4/9/26
  • Durham WRRF Road Repair Replacement No 7293
  • Clean Water Services
  • 4/7/26
  • 2026 Street Preservation
  • Bend
  • 3/17/26
Bidjudge
JOBS BID
  • OR35 White River East Fork Hood River Paving Multiple Locations
  • ODOT
  • $793,240
  • 7/14/26
  • FY26 Basewide Pavement Bundle
  • Oregon Military Department
  • $146,150
  • 7/14/26
  • Hwy 99E MP 11 82 12 20 Pavement Repair
  • ODOT
  • $377,987
  • 7/8/26
  • Hwy 43 MP 10 16 10 91 Pavement Repair
  • ODOT
  • $213,607
  • 7/8/26
  • US26 Government Camp OR35 Jct Paving Multiple Locations
  • ODOT
  • $660,780
  • 7/7/26
  • R2 Paving RFB US30 MP87 65 92 40 Overlay Paving
  • ODOT
  • $1,051,657
  • 6/24/26
  • 2026 52 Bakers Ferry Road Paving
  • Clackamas County
  • $1,682,184
  • 6/24/26
  • 2026 MBM OR 217 Various Locations Bridge Paving
  • ODOT
  • $892,892
  • 6/18/26
  • Manzanita NB SB Rest Area Paving Maintenance Improvements
  • Travel Information Council
  • $1,231,231
  • 6/16/26
  • US 97 Inlay Paving MP 113 6 MP 114 7
  • ODOT
  • $349,990
  • 6/16/26
  • I 84 Troutdale Corbett Maintenance Pave Multiple Locations
  • ODOT
  • $297,297
  • 6/11/26
  • 2026 Street Surfacing Inlay
  • Gresham
  • $2,137,137
  • 6/4/26
  • R2 Paving RFB US26 MP0 47 5 85 Inlay Paving
  • ODOT
  • $1,659,247
  • 5/28/26
  • 2026 SE Pavement Overlay
  • Scappoose
  • $387,387
  • 5/26/26
  • OR6 Wilson River Loop East MP 2 07 Tillamook
  • ODOT
  • $757,666
  • 5/21/26
  • 2026 Street Rehabilitation
  • Prineville
  • $907,896
  • 5/19/26
  • R2 Paving RFB US20 OR126E Overlay Paving
  • ODOT
  • $7,949,949
  • 5/19/26
  • R2 Paving RFB US101 MP91 8 Inlay Paving
  • ODOT
  • $132,959
  • 5/15/26
  • Copper Creek Outfall Stabilization
  • Tigard
  • $712,675
  • 5/12/26
  • HMAC Paving 2026
  • Clatsop County
  • $284,400
  • 5/6/26
  • 15th Ferguson RAB Construction
  • Bend
  • $5,152,152
  • 5/6/26
  • US26 US395 District 14 MBM 2026
  • ODOT
  • $122,225
  • 4/30/26
  • 2026 Neighborhood Street Safety Program Package B
  • Bend
  • $1,412,608
  • 4/28/26
  • 2026 Neighborhood Street Safety Program Package A
  • Bend
  • $1,886,516
  • 4/28/26
  • I 84 Eastbound Rieth Road OR11 Section
  • ODOT
  • $351,743
  • 4/16/26
  • US 30 Wonderly Rd Rockcrest St Rainier Section
  • ODOT
  • $3,759,675
  • 4/9/26
  • Durham WRRF Road Repair Replacement No 7293
  • Clean Water Services
  • $791,630
  • 4/7/26
  • OR128E MP 29 5 30 9 Paris Reservoir Landslide
  • ODOT
  • $8,974,796
  • 4/2/26
  • OR53 MP7 57 11 38 Overlay Paving
  • ODOT
  • $936,795
  • 4/2/26
  • Construction Asphalt Concrete Resurfacing Various Marion County Roads S-C25102-00015959
  • Marion County
  • $4,691,331
  • 3/19/26
  • 2026 Street Preservation
  • Bend
  • $2,410,796
  • 3/17/26
  • US101 MP352 6 Lone Ranch Slide
  • ODOT
  • $214,000
  • 3/17/26
  • 2026 Residential Chip Seal No ST26CS
  • Bend
  • $1,273,273
  • 3/10/26
  • 25PW15 Parrott Creek Culvert Replacements
  • Roseburg
  • $3,257,930
  • 3/10/26
  • Coos County OR42 MP 36 1 Rockfall Mitigation
  • ODOT
  • $776,530
  • 1/29/26
  • ITB North Fork Slide Stabilization Slide 2 North Fork Road SE
  • Marion County
  • $8,663,336
  • 1/28/26
  • NB Boone Bridge I 5 Over Willamette River MP 283 11 Joint Rehabilitation
  • ODOT
  • $2,695,597
  • 1/14/26
Bidjudge
CASH FLOW
  • NB Boone Bridge I 5 Over Willamette River MP 283 11 Joint Rehabilitation
  • ODOT
  • $351,743
  • 06/15/26
  • 120
  • 40.0%
  • $87,936
  • $211,046
  • NB Boone Bridge I 5 Over Willamette River MP 283 11 Joint Rehabilitation
  • ODOT
  • $3,759,675
  • 06/08/26
  • 120
  • 45.8%
  • $939,919
  • $2,036,491
  • NB Boone Bridge I 5 Over Willamette River MP 283 11 Joint Rehabilitation
  • Clean Water Services
  • $791,630
  • 06/06/26
  • 120
  • 47.5%
  • $197,908
  • $415,606
  • NB Boone Bridge I 5 Over Willamette River MP 283 11 Joint Rehabilitation
  • Bend
  • $2,410,796
  • 05/16/26
  • 120
  • 65.0%
  • $602,699
  • $843,779
  • $1,828,462
  • $4,300,162
Bidjudge