Financial Health & Pipeline Brief
Analyzed On:  Aug 13, 2026
ACI Active Construction (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
ACI Active Construction will generate steady but limited cash flow from its **$17M** remaining backlog, primarily through the six active projects bid in mid-2026 with 120-month durations. Execution pace appears slow given the long contract terms, with only partial revenue recognition expected in this window despite recent awards totaling **$24M** in 2026.

Medium-term Outlook (6-12 months)
Bidding momentum from 48 jobs in 2026 at a 16.7% success rate should yield additional awards similar to the **$32M** secured in 2025, supporting backlog replenishment. Cash flow stability will depend on converting the current **$276M** bid volume into new low-bid wins while managing the extended timelines of existing contracts.

Key Risk Period
The primary risk emerges in 12-18 months if the low 16-17% win rate fails to offset depletion of the **$17M** backlog, creating potential cash flow gaps amid 120-month project burn rates. Elevated 9.71% average left on low bids in 2026 further signals margin pressure that could compound liquidity issues.

Recommendations
Prioritize bid strategy refinements to improve conversion rates above 16.7% and target shorter-duration projects for faster cash flow. Monitor monthly backlog burn closely and maintain a pipeline exceeding **$300M** in annual bids to sustain operations.
 
JOBS LOW
  • SR 510 Yelm Loop New Alignment Phase 2
  • WSDOT
  • 8/19/26
  • Pacific Avenue Greenway
  • Spokane
  • 6/29/26
  • Pacific Avenue Greenway 2022069
  • Spokane
  • 6/29/26
  • 183rd Avenue SW Empire Street SW Sargent Road SW Phase 1
  • Thurston County
  • 5/21/26
  • W North Bend Way NW 8th Street Roundabout
  • North Bend
  • 5/20/26
  • 38th Avenue Improvement Phase 2
  • Gig Harbor
  • 5/7/26
  • Rody Creek Channel Restoration 72nd Street East Pioneer Way East CIP D191
  • Pierce County
  • 4/29/26
  • Stossel Right Bank Revetment ReBid
  • King County - WA
  • 1/13/26
  • Rutledge Johnson Floodplain Reconnection
  • King County - WA
  • 1/13/26
Bidjudge
JOBS BID
  • SR 510 Yelm Loop New Alignment Phase 2
  • WSDOT
  • $39,724,724
  • 8/19/26
  • 45th Ave SW Culvert Replacement Habitat Restoration
  • Seattle
  • $39,039,039
  • 8/12/26
  • Lawrence Street Multimodal Improvements
  • Port Townsend
  • $3,949,949
  • 7/30/26
  • Airport Station Area Pedestrian Improvement
  • SeaTac
  • $38,536,536
  • 7/2/26
  • Pacific Avenue Greenway
  • Spokane
  • $3,365,365
  • 6/29/26
  • Pacific Avenue Greenway 2022069
  • Spokane
  • $3,365,365
  • 6/29/26
  • SR 112 Clallam Bay 2023 Emergency
  • WSDOT
  • $2,925,925
  • 6/24/26
  • Madrona Connection 337
  • Lacey
  • $2,587,587
  • 6/17/26
  • 76th Avenue South Large Storm Pipe Maintenance
  • Kent
  • $2,562,562
  • 6/9/26
  • Cedar Downs Water Quality Retrofit
  • Maple Valley
  • $1,938,938
  • 6/3/26
  • 122nd Avenue East 146th St Ct E 136th St E CRP 5763
  • Pierce County
  • $11,232,232
  • 5/29/26
  • Sandy Cove Park Bank Protection Phase 2
  • Snoqualmie
  • $5,100,100
  • 5/28/26
  • 183rd Avenue SW Empire Street SW Sargent Road SW Phase 1
  • Thurston County
  • $2,075,075
  • 5/21/26
  • Eastrail NE Spring Boulevard Trail Link
  • Bellevue
  • $5,670,670
  • 5/21/26
  • W North Bend Way NW 8th Street Roundabout
  • North Bend
  • $3,193,193
  • 5/20/26
  • SE 60th Street RRFB Lake Heights 149th Avenue SE Overlay
  • Bellevue
  • $953,953
  • 5/14/26
  • 38th Avenue Improvement Phase 2
  • Gig Harbor
  • $7,316,316
  • 5/7/26
  • SR 508 0 3 Miles East Bergen Rd Engineered Log Jam
  • WSDOT
  • $2,340,340
  • 5/6/26
  • Rody Creek Channel Restoration 72nd Street East Pioneer Way East CIP D191
  • Pierce County
  • $1,594,594
  • 4/29/26
  • Runway reconstruction Pierce County Airport Thun Field
  • Pierce County
  • $6,796,796
  • 4/29/26
  • 2026 Local Streets Preservation
  • Auburn
  • $987,987
  • 4/28/26
  • Fort Dent Levee 2020 Repair
  • King County - WA
  • $2,089,089
  • 4/27/26
  • 112th Street SW South Tacoma Way Steele Street South
  • Lakewood
  • $867,530
  • 4/24/26
  • 1st Street NE NW N Division St Pedestrian Improvements
  • Auburn
  • $987,987
  • 4/16/26
  • Kapowsin Creek Bridge 19185 A Scour Repair CRP 5957
  • Pierce County
  • $429,429
  • 4/15/26
  • Interstate 5 Port Tacoma Road Interchange Phase 2A
  • Fife
  • $51,468,468
  • 4/10/26
  • A Street Wastewater Capacity Improvements
  • Port Angeles
  • $3,088,087
  • 4/9/26
  • 116th Avenue SE Sidewalk
  • Renton
  • $982,982
  • 4/7/26
  • Twanoh State Park Lagoon Shoreline Stream Restoration
  • Mason County
  • $1,984,984
  • 4/7/26
  • Chestnut St Bridge Scour Mitigation Latah Creek 1
  • Spokane
  • $1,520,520
  • 4/1/26
  • Brighton Creek Culvert Replacement Harts Lake Rd D462
  • Pierce County
  • $4,837,837
  • 4/1/26
  • Lund Ave Chase Rd Roundabout CRP 2629
  • Kitsap County
  • $2,175,175
  • 3/17/26
  • Tower Road Bridge Rock Creek
  • Cowlitz County
  • $3,649,649
  • 3/9/26
  • Boise Creek Mitigation
  • King County - WA
  • $1,475,475
  • 2/26/26
  • Bel Red Road Buffered Bike Lanes Schedule B C
  • Redmond
  • $749,749
  • 2/26/26
  • SR 510 SR 702 SR 507 CRAB Bundle 1A Compact Roundabouts
  • WSDOT
  • $3,740,740
  • 2/25/26
  • Custer Road Bridgeport 75th
  • Lakewood
  • $1,943,943
  • 2/20/26
  • XE3692 SR 17 Cunningham Rd Roundabout
  • WSDOT
  • $2,787,787
  • 2/19/26
  • S Sullivan Rd Preservation
  • Spokane Valley
  • $4,339,339
  • 2/13/26
  • Kelsey Creek Culvert Lake Hills Blvd Water Sewer Replacement
  • Bellevue
  • $13,170,170
  • 2/5/26
  • Lund Harris Chase Corridor Improvements CRP 2583 2629
  • Kitsap County
  • $3,218,218
  • 2/3/26
  • Valley Plaza Water Main Replacement
  • Fife
  • $992,992
  • 1/29/26
  • 112th St SW Lake Louise School Sidewalk
  • Lakewood
  • $787,787
  • 1/28/26
  • Interstate 5 Port Tacoma Road Interchange Phase 2A
  • Fife
  • $52,396,552
  • 1/27/26
  • US 101 Safety Improvement
  • Aberdeen
  • $2,312,312
  • 1/22/26
  • Bull Road East Mtn View Ave Traffic Signal Intersection Improvements
  • Ellensburg
  • $1,199,199
  • 1/20/26
  • Safe Routes Schools 104th St E CRP 5939
  • Pierce County
  • $1,174,174
  • 1/14/26
  • Fish Lake Tr Cent Tr Connection Phase 1 Thorpe Govt Way 1
  • Spokane
  • $2,222,222
  • 1/13/26
  • Stossel Right Bank Revetment ReBid
  • King County - WA
  • $1,738,738
  • 1/13/26
  • Rutledge Johnson Floodplain Reconnection
  • King County - WA
  • $1,389,389
  • 1/13/26
Bidjudge
CASH FLOW
  • Rutledge Johnson Floodplain Reconnection
  • Thurston County
  • $2,075,075
  • 07/20/26
  • 120
  • 28.3%
  • $518,769
  • $1,487,137
  • Rutledge Johnson Floodplain Reconnection
  • North Bend
  • $3,193,193
  • 07/19/26
  • 120
  • 29.2%
  • $798,298
  • $2,261,845
  • Rutledge Johnson Floodplain Reconnection
  • Gig Harbor
  • $7,316,316
  • 07/06/26
  • 120
  • 40.0%
  • $1,829,079
  • $4,389,790
  • Rutledge Johnson Floodplain Reconnection
  • Pierce County
  • $1,594,594
  • 06/28/26
  • 120
  • 46.7%
  • $398,649
  • $850,450
  • $3,544,795
  • $55,444,676