Financial Health & Pipeline Brief
Analyzed On:  Aug 13, 2026
Interwest Construction ICI (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
Current **$17.5M** remaining backlog from 2026 wins supports steady cash flow execution on active projects with durations of 75-120 months. Improved **25%** success rate versus 2025 provides momentum for near-term revenue recognition. Limited new awards in the period may constrain acceleration.

Medium-term Outlook (6-12 months)
Backlog burn at current pace risks revenue contraction absent additional wins, despite **$23.4M** in 2026 low bids. Lower overall bid volume versus 2025 could limit growth unless success rate sustains above **20%**. Cash flow remains positive but dependent on timely project starts.

Key Risk Period
The 9-15 month window presents highest exposure as multiple long-duration projects approach completion without sufficient replacement backlog. Declining total low bids from **$40M** in 2025 signal potential pipeline weakness.

Recommendations
Increase bid volume to restore **$40M+** annual low totals while targeting margins above **9%**. Prioritize shorter-duration projects to rebuild backlog and stabilize cash flow beyond 12 months.
 
JOBS LOW
  • US 12 Eschbach Rd Ackley Rd Clover Ln I S Safety Improvements
  • WSDOT
  • 7/15/26
  • Port Gardner Storage Facility West Marine View Dr Storm Combined Sewer Design Construction Package
  • Everett
  • 5/19/26
  • SR 525 525 Spur Vic Mukilteo Ferry Vic Paving ADA
  • WSDOT
  • 5/13/26
  • ADA Peabody Street
  • Port Angeles
  • 5/12/26
  • First Front Pedestrian Enhancements
  • Port Angeles
  • 4/29/26
  • A Street Wastewater Capacity Improvements
  • Port Angeles
  • 4/9/26
Bidjudge
JOBS BID
  • SR 202 Widening Trestle Replacement Phase B
  • Woodinville
  • $16,257,092
  • 8/19/26
  • Gorge Dam Powerhouse Rockfall Mitigation
  • Seattle
  • $130,700
  • 7/29/26
  • US 2 Corridor Safety Improvements
  • WSDOT
  • $8,098,359
  • 7/22/26
  • 44th Avenue West Underpass Pedestrian Bicycle Improvement
  • Lynnwood
  • $8,810,339
  • 7/21/26
  • US 12 Eschbach Rd Ackley Rd Clover Ln I S Safety Improvements
  • WSDOT
  • $1,717,171
  • 7/15/26
  • I 90 Hansen Rd Overpass Emergency Bridge Replacement
  • WSDOT
  • $6,262,626
  • 7/1/26
  • Whitehorse Trail Improvements MP 0 00 2 63
  • Snohomish County
  • $771,000
  • 6/30/26
  • Pine Street TBD 2nd Ave 9th Ave
  • Walla Walla
  • $6,218,239
  • 6/16/26
  • Beverly Park Road ADA Upgrades 18th Avenue West Sidewalk Improvements
  • Snohomish County
  • $593,999
  • 5/28/26
  • Sandy Cove Park Bank Protection Phase 2
  • Snoqualmie
  • $3,939,393
  • 5/28/26
  • I 90 Hansen Rd Overpass Emergency Existing Structure Removal
  • WSDOT
  • $1,955,555
  • 5/20/26
  • Port Gardner Storage Facility West Marine View Dr Storm Combined Sewer Design Construction Package
  • Everett
  • $11,637,311
  • 5/19/26
  • SR 525 525 Spur Vic Mukilteo Ferry Vic Paving ADA
  • WSDOT
  • $5,935,979
  • 5/13/26
  • ADA Peabody Street
  • Port Angeles
  • $789,747
  • 5/12/26
  • 2026 Sidewalk Gaps
  • North Bend
  • $919,000
  • 5/6/26
  • Harbor Pointe Boulevard Pavement Preservation
  • Mukilteo
  • $1,718,000
  • 5/5/26
  • 130th Place NE 132nd Avenue NE Non Motorized Improvements
  • Bothell
  • $2,322,148
  • 4/30/26
  • First Front Pedestrian Enhancements
  • Port Angeles
  • $946,554
  • 4/29/26
  • A Street Wastewater Capacity Improvements
  • Port Angeles
  • $2,399,763
  • 4/9/26
  • 13th Street Park Avenue Intersection Improvements
  • Snohomish
  • $331,133
  • 3/12/26
  • 2026 Curb Ramp Replacement
  • Sequim
  • $876,543
  • 3/11/26
  • 272nd Street NW 72nd Ave NW Sidewalk Improvements
  • Stanwood
  • $677,937
  • 3/3/26
  • Q Avenue Pedestrian Crossings
  • Anacortes
  • $379,379
  • 1/28/26
  • Transit Connection Corridor
  • Mountlake Terrace
  • $1,812,645
  • 1/21/26
  • 2026 Phase 1 Water Main Replacement
  • Bellevue
  • $5,037,798
  • 1/8/26
Bidjudge
CASH FLOW
  • 2026 Phase 1 Water Main Replacement
  • Everett
  • $11,637,311
  • 07/18/26
  • 120
  • 30.0%
  • $2,909,328
  • $8,146,118
  • 2026 Phase 1 Water Main Replacement
  • WSDOT
  • $5,935,979
  • 07/12/26
  • 115
  • 36.5%
  • $1,548,516
  • $3,768,056
  • 2026 Phase 1 Water Main Replacement
  • Port Angeles
  • $789,747
  • 07/11/26
  • 120
  • 35.8%
  • $197,437
  • $506,754
  • 2026 Phase 1 Water Main Replacement
  • Port Angeles
  • $946,554
  • 06/28/26
  • 120
  • 46.7%
  • $236,639
  • $504,829
  • 2026 Phase 1 Water Main Replacement
  • Port Angeles
  • $2,399,763
  • 06/08/26
  • 120
  • 63.3%
  • $599,941
  • $879,913
  • $5,491,861
  • $15,522,841
Bidjudge