Financial Health & Pipeline Brief
Analyzed On:  Aug 13, 2026
Central Washington Asphalt Shamrock Paving - WA (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
The contractor holds **$16.6M** in remaining backlog across ten active projects, with several large paving contracts bid in mid-2026 already contributing meaningful remaining values such as **$5.9M** and **$2.5M**. Execution of these near-term projects at a 45.5% success rate should generate stable cash inflows through year-end, supported by the **$30M** in 2026 low bids.

Medium-term Outlook (6-12 months)
Sustained backlog drawdown from the **$30M** awarded volume and improved win rate positions the firm for continued revenue recognition into 2027, though many contracts extend 85–120 months and will pace cash flow gradually. Additional bidding momentum from the prior year's **$32.6M** in lows provides a foundation for replenishing the pipeline.

Key Risk Period
The 12–18 month window after current backlog is substantially consumed carries elevated risk, as reliance on a limited number of long-duration projects could create revenue gaps if new wins slow.

Recommendations
Prioritize aggressive bidding to maintain at least **$25M–$30M** in annual awards while monitoring project durations for cash-flow timing; accelerate close-out of shorter-duration contracts to strengthen liquidity.
 
JOBS LOW
  • Bickleton Hwy and Bickleton Hwy Phase II CRP 394 CRP 400
  • Klickitat County
  • 11/3/26
  • SR 240 Beloit Road Hagen Rd Pavement Repairs
  • WSDOT
  • 7/1/26
  • 2026 Local Access Grind Overlay Chipseal
  • Spokane
  • 6/8/26
  • US 730 Oregon State Line US 12 Paving
  • WSDOT
  • 5/28/26
  • 3rd Avenue Stevens Street Grind Overlay
  • Spokane
  • 5/18/26
  • SR 17 NCR Seal 2026
  • WSDOT
  • 5/6/26
  • SR 904 I 90 To Cheney Paving
  • WSDOT
  • 4/29/26
  • US 2 Cashmere West Paving
  • WSDOT
  • 4/22/26
  • Grant Rd Resurfacing N Quincy Ave Urban Industrial Way CRP 1023
  • Douglas County - WA
  • 4/6/26
  • 2026 Bituminous Surface Treatment Area 2
  • Benton County
  • 4/2/26
  • XE3692 SR 17 Cunningham Rd Roundabout
  • WSDOT
  • 2/19/26
Bidjudge
JOBS BID
  • 2027 Alder Tausick Airport Pavement Preservation
  • Walla Walla
  • $2,734,115
  • 11/5/26
  • Bickleton Hwy and Bickleton Hwy Phase II CRP 394 CRP 400
  • Klickitat County
  • $5,555,000
  • 11/3/26
  • Fish Lake Trail Construction Phase 1
  • Spokane
  • $2,620,000
  • 7/21/26
  • SR 240 Beloit Road Hagen Rd Pavement Repairs
  • WSDOT
  • $400,000
  • 7/1/26
  • Leader Lake Road Paving 2026
  • Okanogan County
  • $477,000
  • 6/16/26
  • 2026 Local Access Grind Overlay Chipseal
  • Spokane
  • $2,622,000
  • 6/8/26
  • US 730 Oregon State Line US 12 Paving
  • WSDOT
  • $2,022,000
  • 5/28/26
  • SR 241 SR 14 Sunnyside Vic Columbia River Vic Wheel Path Chip Seal
  • WSDOT
  • $10,190,000
  • 5/20/26
  • 2026 City Wide Asphalt Overlay
  • Kennewick
  • $714,608
  • 5/19/26
  • 3rd Avenue Stevens Street Grind Overlay
  • Spokane
  • $2,774,000
  • 5/18/26
  • US 12 W Gulch Bridge Rimrock Retreat Paving
  • WSDOT
  • $10,190,000
  • 5/6/26
  • SR 17 NCR Seal 2026
  • WSDOT
  • $8,665,000
  • 5/6/26
  • SR 904 I 90 To Cheney Paving
  • WSDOT
  • $2,124,000
  • 4/29/26
  • SR 211 JCT US 2 JCT SR 20 Paving
  • WSDOT
  • $5,690,000
  • 4/22/26
  • US 2 Cashmere West Paving
  • WSDOT
  • $6,414,000
  • 4/22/26
  • Grant Rd Resurfacing N Quincy Ave Urban Industrial Way CRP 1023
  • Douglas County - WA
  • $1,334,000
  • 4/6/26
  • 2026 Bituminous Surface Treatment Area 2
  • Benton County
  • $1,245,975
  • 4/2/26
  • P2606 2026 Bituminous Surface Treatment Seal Coat
  • Kennewick
  • $866,577
  • 3/24/26
  • 2025 Arterial Pavement Repair
  • Spokane
  • $927,784
  • 3/2/26
  • 2026 Pavement Preservation
  • Cheney
  • $1,409,000
  • 2/25/26
  • 2026 Independence Road Improvement
  • Yakima County
  • $2,833,000
  • 2/19/26
  • XE3692 SR 17 Cunningham Rd Roundabout
  • WSDOT
  • $2,444,000
  • 2/19/26
  • S Sullivan Rd Preservation
  • Spokane Valley
  • $4,368,000
  • 2/13/26
  • CRP 634 North Railroad Avenue Improvements
  • Franklin County - WA
  • $1,360,472
  • 1/15/26
Bidjudge
CASH FLOW
  • CRP 634 North Railroad Avenue Improvements
  • Spokane
  • $2,622,000
  • 08/07/26
  • 120
  • 83.3%
  • $655,500
  • $437,000
  • CRP 634 North Railroad Avenue Improvements
  • WSDOT
  • $2,022,000
  • 07/27/26
  • 120
  • 92.5%
  • $505,500
  • $151,650
  • $1,161,000
  • $6,143,650
Bidjudge