2500 East Brannan Way
Denver CO
303-534-1231
Health Breakdown
Avg Left
20
Success
40
Avg Avg
10
Year Proj
20
2 Year Prior Proj
75
Qual Based
0
Cash Flow
50
 
215%
100%
Health
Financial Health & Pipeline Brief
Analyzed On:  Aug 13, 2026
Brannan Sand & Gravel (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
The contractor maintains a thin active backlog of only **$5.4M** across four projects, which will largely exhaust within 3-6 months at current burn rates. Annual bidding volume of **$170M** at a 21.6% success rate provides a pipeline to replenish work, but immediate award conversions are required to stabilize cash flow.

Medium-term Outlook (6-12 months)
Sustained performance at the historical **$30M** annual win rate will be necessary to maintain operations beyond the current backlog depletion. Consistent bidding activity near **$150-170M** per year supports replacement volume, assuming margins remain in the 2.5-3.5% range observed recently.

Key Risk Period
The 6-9 month window following exhaustion of the **$5.4M** backlog represents the primary exposure, particularly if win rates dip below 20% or project durations extend further.

Recommendations
Prioritize acceleration of bid submissions and subcontractor coordination to improve hit rates above 22%. Monitor monthly cash draws against the remaining backlog to avoid liquidity gaps.
 
JOBS LOW
  • Region 1 I-225 Traffic Flow Improvements C 2254-093 (24443)
  • CDOT
  • 8/27/26
  • Region 1 OnCall Asphalt Paving Master Task Order Services APR 104-2026
  • CDOT
  • 6/12/26
  • 2026 Annual Landside Pavement Rehab
  • Denver International Airport
  • 6/11/26
  • 2026 HBP Paving
  • Fort Morgan
  • 5/1/26
  • Pomona Drive Water Main Replacement No 26 WA 010
  • Arvada
  • 4/9/26
  • Region 4 CO86 Resurfacing STM 086A-059 (25632)
  • CDOT
  • 3/5/26
  • 2026 Street Paving Program
  • Adams County
  • 2/19/26
  • 2026 Town Facility Parking Lot Improvement
  • Castle Rock
  • 1/13/26
  • Region 1 SH 74 Surface Treatment NHPP 0741-026 (24423)
  • CDOT
  • 1/8/26
Bidjudge
JOBS BID
  • Region 1 I-225 Traffic Flow Improvements C 2254-093 (24443)
  • CDOT
  • $1,992,435
  • 8/27/26
  • County Line Road Shoulder Improvements
  • Longmont
  • $5,528,660
  • 8/11/26
  • Region 4 CO52 Resurfacing NHPP 052A-067 (27449)
  • CDOT
  • $3,424,242
  • 7/2/26
  • 2025 Water System Improvement Sites 1 7
  • Aurora
  • $17,218,102
  • 6/18/26
  • Region 1 OnCall Asphalt Paving Master Task Order Services APR 104-2026
  • CDOT
  • $3,000,000
  • 6/12/26
  • 2026 Annual Landside Pavement Rehab
  • Denver International Airport
  • $8,617,907
  • 6/11/26
  • Arapahoe County No C25 25 2026 Arapahoe County Reconstruction
  • Arapahoe County
  • $6,395,075
  • 6/10/26
  • Construction North 40th Avenue Roadway Segment
  • Brighton
  • $2,981,000
  • 6/5/26
  • Region 1 SH 46 HMA Resurfacing STA R100-441 (27340)
  • CDOT
  • $2,901,945
  • 6/4/26
  • 2026 Street Alley Contract Mill Overlay
  • Denver
  • $6,423,174
  • 5/6/26
  • 2026 HBP Paving
  • Fort Morgan
  • $2,524,517
  • 5/1/26
  • Construction Sable Blvd Intersection Improvements
  • Brighton
  • $8,750,611
  • 4/30/26
  • Townwide Roadway Reconstruct Program
  • Parker
  • $1,222,862
  • 4/28/26
  • 2026 Street Resurfacing
  • Louisville
  • $2,751,967
  • 4/28/26
  • 2026 Street Maintenance Phase 2
  • Erie
  • $3,357,030
  • 4/24/26
  • 2026 Paving Federal Heights
  • Federal Heights
  • $565,995
  • 4/17/26
  • Region 1 I76 Resurfacing NHPP R100-421 (26482)
  • CDOT
  • $10,725,725
  • 4/16/26
  • Pomona Drive Water Main Replacement No 26 WA 010
  • Arvada
  • $1,000,000
  • 4/9/26
  • 2026 City Cherry Hills Village Mill Overlay
  • Cherry Hills Village
  • $392,279
  • 4/9/26
  • Indiana Street Improvements
  • Superior
  • $2,367,351
  • 3/31/26
  • 2026 Street Maintenance
  • Erie
  • $1,134,236
  • 3/24/26
  • PW2026 01 2026 Rock Creek Parkway Improvements
  • Superior - CO
  • $4,998,998
  • 3/12/26
  • Region 4 CO86 Resurfacing STM 086A-059 (25632)
  • CDOT
  • $1,427,814
  • 3/5/26
  • Tennessee Oneida Storm System Phase 3
  • Denver
  • $6,686,673
  • 3/3/26
  • Roadway Improvement 2026
  • Windsor
  • $2,155,588
  • 2/26/26
  • 2026 Street Paving Program
  • Adams County
  • $6,915,812
  • 2/19/26
  • 2026 Pavement Resurfacing Program 26 ST 01B
  • Arvada
  • $5,769,330
  • 2/19/26
  • Region 1 C470 Resurfacing NHPP 4701-139 (25589)
  • CDOT
  • $15,499,000
  • 2/19/26
  • Grandview Boulevard Improvements Phase 2
  • Dacono
  • $3,332,119
  • 2/10/26
  • City Hall Parking Lot Improvements
  • Dacono
  • $180,811
  • 1/29/26
  • 120th Street Multimodal Safety Improvements
  • Boulder County
  • $4,492,643
  • 1/29/26
  • WCR 8 Paving
  • Dacono
  • $449,999
  • 1/21/26
  • 2026 Asphalt Mill Overlay
  • Lone Tree
  • $2,029,455
  • 1/20/26
  • 2026 Asphalt Overlay 1
  • Castle Rock
  • $7,297,844
  • 1/16/26
  • 2025 Water Main Replacement 25 WA 01
  • Arvada
  • $5,666,512
  • 1/13/26
  • 2026 Town Facility Parking Lot Improvement
  • Castle Rock
  • $539,797
  • 1/13/26
  • 2026 Asphalt Overlay 2
  • Castle Rock
  • $5,524,360
  • 1/13/26
  • Region 1 SH 74 Surface Treatment NHPP 0741-026 (24423)
  • CDOT
  • $6,365,969
  • 1/8/26
Bidjudge
CASH FLOW
  • Region 1 SH 74 Surface Treatment NHPP 0741-026 (24423)
  • CDOT
  • $3,000,000
  • 08/11/26
  • 365
  • 9.6%
  • $246,575
  • $2,712,329
  • Region 1 SH 74 Surface Treatment NHPP 0741-026 (24423)
  • Fort Morgan
  • $2,524,517
  • 06/30/26
  • 120
  • 63.3%
  • $631,129
  • $925,656
  • Region 1 SH 74 Surface Treatment NHPP 0741-026 (24423)
  • Arvada
  • $1,000,000
  • 06/08/26
  • 120
  • 81.7%
  • $250,000
  • $183,333
  • $1,127,704
  • $5,813,753