- Brannan Sand & Gravel
- 2026
- 38
- 9
- 23.68%
- $32,384,251
- 4.22%
- 12.62%
- 7.84%
- $172,607,837

The contractor maintains a thin active backlog of only **$5.4M** across four projects, which will largely exhaust within 3-6 months at current burn rates. Annual bidding volume of **$170M** at a 21.6% success rate provides a pipeline to replenish work, but immediate award conversions are required to stabilize cash flow.
Medium-term Outlook (6-12 months)
Sustained performance at the historical **$30M** annual win rate will be necessary to maintain operations beyond the current backlog depletion. Consistent bidding activity near **$150-170M** per year supports replacement volume, assuming margins remain in the 2.5-3.5% range observed recently.
Key Risk Period
The 6-9 month window following exhaustion of the **$5.4M** backlog represents the primary exposure, particularly if win rates dip below 20% or project durations extend further.
Recommendations
Prioritize acceleration of bid submissions and subcontractor coordination to improve hit rates above 22%. Monitor monthly cash draws against the remaining backlog to avoid liquidity gaps.
- Region 1 I-225 Traffic Flow Improvements C 2254-093 (24443)
- CDOT
- 8/27/26
- Region 1 OnCall Asphalt Paving Master Task Order Services APR 104-2026
- CDOT
- 6/12/26
- 2026 Annual Landside Pavement Rehab
- Denver International Airport
- 6/11/26
- 2026 HBP Paving
- Fort Morgan
- 5/1/26
- Pomona Drive Water Main Replacement No 26 WA 010
- Arvada
- 4/9/26
- Region 4 CO86 Resurfacing STM 086A-059 (25632)
- CDOT
- 3/5/26
- 2026 Street Paving Program
- Adams County
- 2/19/26
- 2026 Town Facility Parking Lot Improvement
- Castle Rock
- 1/13/26
- Region 1 SH 74 Surface Treatment NHPP 0741-026 (24423)
- CDOT
- 1/8/26
- Region 1 I-225 Traffic Flow Improvements C 2254-093 (24443)
- CDOT
- $1,992,435
- 8/27/26
- County Line Road Shoulder Improvements
- Longmont
- $5,528,660
- 8/11/26
- Region 4 CO52 Resurfacing NHPP 052A-067 (27449)
- CDOT
- $3,424,242
- 7/2/26
- 2025 Water System Improvement Sites 1 7
- Aurora
- $17,218,102
- 6/18/26
- Region 1 OnCall Asphalt Paving Master Task Order Services APR 104-2026
- CDOT
- $3,000,000
- 6/12/26
- 2026 Annual Landside Pavement Rehab
- Denver International Airport
- $8,617,907
- 6/11/26
- Arapahoe County No C25 25 2026 Arapahoe County Reconstruction
- Arapahoe County
- $6,395,075
- 6/10/26
- Construction North 40th Avenue Roadway Segment
- Brighton
- $2,981,000
- 6/5/26
- Region 1 SH 46 HMA Resurfacing STA R100-441 (27340)
- CDOT
- $2,901,945
- 6/4/26
- 2026 Street Alley Contract Mill Overlay
- Denver
- $6,423,174
- 5/6/26
- 2026 HBP Paving
- Fort Morgan
- $2,524,517
- 5/1/26
- Construction Sable Blvd Intersection Improvements
- Brighton
- $8,750,611
- 4/30/26
- Townwide Roadway Reconstruct Program
- Parker
- $1,222,862
- 4/28/26
- 2026 Street Resurfacing
- Louisville
- $2,751,967
- 4/28/26
- 2026 Street Maintenance Phase 2
- Erie
- $3,357,030
- 4/24/26
- 2026 Paving Federal Heights
- Federal Heights
- $565,995
- 4/17/26
- Region 1 I76 Resurfacing NHPP R100-421 (26482)
- CDOT
- $10,725,725
- 4/16/26
- Pomona Drive Water Main Replacement No 26 WA 010
- Arvada
- $1,000,000
- 4/9/26
- 2026 City Cherry Hills Village Mill Overlay
- Cherry Hills Village
- $392,279
- 4/9/26
- Indiana Street Improvements
- Superior
- $2,367,351
- 3/31/26
- 2026 Street Maintenance
- Erie
- $1,134,236
- 3/24/26
- PW2026 01 2026 Rock Creek Parkway Improvements
- Superior - CO
- $4,998,998
- 3/12/26
- Region 4 CO86 Resurfacing STM 086A-059 (25632)
- CDOT
- $1,427,814
- 3/5/26
- Tennessee Oneida Storm System Phase 3
- Denver
- $6,686,673
- 3/3/26
- Roadway Improvement 2026
- Windsor
- $2,155,588
- 2/26/26
- 2026 Street Paving Program
- Adams County
- $6,915,812
- 2/19/26
- 2026 Pavement Resurfacing Program 26 ST 01B
- Arvada
- $5,769,330
- 2/19/26
- Region 1 C470 Resurfacing NHPP 4701-139 (25589)
- CDOT
- $15,499,000
- 2/19/26
- Grandview Boulevard Improvements Phase 2
- Dacono
- $3,332,119
- 2/10/26
- City Hall Parking Lot Improvements
- Dacono
- $180,811
- 1/29/26
- 120th Street Multimodal Safety Improvements
- Boulder County
- $4,492,643
- 1/29/26
- WCR 8 Paving
- Dacono
- $449,999
- 1/21/26
- 2026 Asphalt Mill Overlay
- Lone Tree
- $2,029,455
- 1/20/26
- 2026 Asphalt Overlay 1
- Castle Rock
- $7,297,844
- 1/16/26
- 2025 Water Main Replacement 25 WA 01
- Arvada
- $5,666,512
- 1/13/26
- 2026 Town Facility Parking Lot Improvement
- Castle Rock
- $539,797
- 1/13/26
- 2026 Asphalt Overlay 2
- Castle Rock
- $5,524,360
- 1/13/26
- Region 1 SH 74 Surface Treatment NHPP 0741-026 (24423)
- CDOT
- $6,365,969
- 1/8/26
- Region 1 I-225 Traffic Flow Improvements C 2254-093 (24443)
- CDOT
- $1,992,435
- 10/26/26
- 65
- 0%
- -
- $1,992,435
- Region 1 SH 74 Surface Treatment NHPP 0741-026 (24423)
- CDOT
- $3,000,000
- 08/11/26
- 365
- 9.6%
- $246,575
- $2,712,329
- Region 1 SH 74 Surface Treatment NHPP 0741-026 (24423)
- Fort Morgan
- $2,524,517
- 06/30/26
- 120
- 63.3%
- $631,129
- $925,656
- Region 1 SH 74 Surface Treatment NHPP 0741-026 (24423)
- Arvada
- $1,000,000
- 06/08/26
- 120
- 81.7%
- $250,000
- $183,333
- $1,127,704
- $5,813,753



