Financial Health & Pipeline Brief
Analyzed On:  Aug 13, 2026
SEMA Construction - CO (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
SEMA Construction faces immediate cash flow pressure with only **$16.4M** in remaining backlog from the I-25 Segment 5 project. The 0% success rate in 2026, despite **$178M** in bids, signals stalled revenue generation that will constrain operations without rapid contract awards.

Medium-term Outlook (6-12 months)
Conversion of the **$113M** in 2025 bids at a 28.6% success rate could replenish backlog and stabilize margins, but the sharp drop from 2024's 33.3% rate indicates execution risk. Sustained low wins will limit growth and increase overhead absorption challenges.

Key Risk Period
The next 3-6 months represent the peak risk window, as the minimal **$16.4M** backlog will likely exhaust before meaningful 2026 awards materialize, exposing the firm to negative cash flow and potential resource underutilization.

Recommendations
Prioritize aggressive bid refinement and subcontractor negotiations to lift the 2026 win rate above 25%. Accelerate pursuit of smaller, shorter-duration projects to bridge the gap until larger contracts close.
 
JOBS LOW
  • Region 4 I76 Roadway Reconstruction Bridge Replacements NHPP 0761-252 (26370 combo)
  • CDOT
  • 8/13/26
Bidjudge
JOBS BID
  • Bridge 19 46 5A Replacement
  • Weld County
  • $8,171,453
  • 9/30/26
  • Region 4 I76 Roadway Reconstruction Bridge Replacements NHPP 0761-252 (26370 combo)
  • CDOT
  • $43,967,018
  • 8/13/26
  • Region 1 Interchange Reconstruction Bridge Replacement US 6 SH 121 NHPP 1211-111 (26942Combo)
  • CDOT
  • $91,546,249
  • 6/25/26
  • Construction Deer Creek Road Base Camp Road Microscope Way
  • El Paso County
  • $5,327,269
  • 6/24/26
  • 2026 Emergency Wastewater Repairs
  • Denver
  • $5,159,639
  • 6/18/26
  • Region 1 I70 Bridge Repairs Kipling Garrison STA 0703-537 (26549)
  • CDOT
  • $4,899,832
  • 5/21/26
  • Weld County Road 34 Bridge Replacement
  • Mead
  • $1,250,165
  • 5/11/26
  • Construction Sable Blvd Intersection Improvements
  • Brighton
  • $7,716,511
  • 4/30/26
  • Water Street Camp Creek Bridge Replacement
  • Colorado Springs
  • $3,608,192
  • 4/15/26
  • Glen Aspen Dam Access Improvements
  • Woodland Park
  • $1,628,265
  • 4/14/26
  • Grandview Boulevard Improvements Phase 2
  • Dacono
  • $2,859,805
  • 2/10/26
  • Lone Tree Creek Trail Underpass Arapahoe Road MP 19 6
  • Centennial
  • $4,331,919
  • 2/6/26
  • Nine Mile Pedestrian Bridge SH 83
  • Aurora
  • $9,529,926
  • 2/6/26
  • Region 3 I70 Frisco Exit 203 Off Ramp Widening NHPP 0702-422 (24873)
  • CDOT
  • $31,355,593
  • 2/5/26
  • Gartrell Bridge Widening
  • Aurora
  • $8,846,027
  • 1/21/26
Bidjudge
CASH FLOW
  • Gartrell Bridge Widening
  • CDOT
  • $86,099,399
  • 12/29/24
  • 730
  • 87.8%
  • $3,538,331
  • $10,497,050
  • $3,538,331
  • $54,464,068
Bidjudge