BidJudge.com - Projects
jerrymiller@amesco.com
18450 E. 28th Ave
Aurora CO
80011
303-363-1000
Health Breakdown
Avg Left
20
Success
50
Avg Avg
10
Year Proj
2 Year Prior Proj
Qual Based
0
Cash Flow
50
 
130%
100%
Health
Financial Health & Pipeline Brief
Analyzed On:  Jun 27, 2026
Ames Construction - CO (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
Ames holds **$28M** remaining backlog from recent awards, including the **$1.88M** Region 1 Bridge project bid in May 2026, supporting steady but limited cash flow over extended 120-month durations. Low 20% success rate in 2026 bidding constrains near-term revenue acceleration despite active pursuit of larger opportunities.

Medium-term Outlook (6-12 months)
The **$18.6M** in 2025 awards and **$13.6M** National Western Center project provide continued backlog burn, yet overall bid volume remains modest at **$53.6M** total. Cash inflows will stay predictable but modest without improved win rates to replenish the pipeline.

Key Risk Period
Extended 10-year project durations combined with a 20% 2026 success rate create elevated risk of backlog depletion by late 2026 if new low bids do not materialize, potentially pressuring liquidity.

Recommendations
Increase bid submissions and refine estimating to raise the success rate above 25%; prioritize shorter-duration work to accelerate cash conversion from the **$28M** backlog.
 
JOBS LOW
  • Region 1 Interchange Reconstruction Bridge Replacement US 6 SH 121 NHPP 1211-111 (26942Combo)
  • CDOT
  • 6/25/26
  • Region 1 Bridge Retaining Wall Repairs NHPP R100-423 (26614)
  • CDOT
  • 5/21/26
Bidjudge
JOBS BID
  • Region 1 Interchange Reconstruction Bridge Replacement US 6 SH 121 NHPP 1211-111 (26942Combo)
  • CDOT
  • $79,649,900
  • 6/25/26
  • Taxiway L Extension
  • Denver
  • $97,071,735
  • 6/11/26
  • Region 1 Bridge Retaining Wall Repairs NHPP R100-423 (26614)
  • CDOT
  • $1,884,900
  • 5/21/26
  • Skeel Reservoir Renovation
  • Denver
  • $5,981,500
  • 5/14/26
  • Tennessee Oneida Storm System Phase 3
  • Denver
  • $7,414,900
  • 3/3/26
  • Region 3 I70 Frisco Exit 203 Off Ramp Widening NHPP 0702-422 (24873)
  • CDOT
  • $32,084,700
  • 2/5/26
Bidjudge
CASH FLOW
  • Region 3 I70 Frisco Exit 203 Off Ramp Widening NHPP 0702-422 (24873)
  • CDOT
  • $1,884,900
  • 07/20/26
  • 120
  • 3.3%
  • $471,225
  • $1,822,070
  • $471,225
  • $81,471,970
Bidjudge