- Martin Marietta Materials - CO
- 2026
- 42
- 7
- 16.67%
- $25,627,250
- 2.03%
- 120.48%
- 10.54%
- $160,166,931

The contractor maintains a thin active backlog of **$13M** across five projects bid primarily in 2025-2026, with most value concentrated in resurfacing work. Limited recent awards of only **$24M** in 2026 signal immediate revenue constraints and potential cash flow pressure until new bids convert.
Medium-term Outlook (6-12 months)
Success rates have fallen from **30%** in 2024 to **14.7%** in 2026, producing sharply lower annual volume. This trajectory points to continued backlog erosion and reduced operational throughput absent a rebound in wins.
Key Risk Period
The highest exposure occurs once the current **$13M** backlog is exhausted, likely within 9-12 months, coinciding with the lowest historical award levels and minimal pipeline visibility.
Recommendations
Aggressively expand bid submissions while tightening estimating accuracy to lift win rates above **20%**. Target larger contracts to rebuild backlog toward prior-year levels of **$100M+** and stabilize cash flow.
- PN ENI000225 Carriage Hills GID 2026 Overlay
- Larimer County
- 8/5/26
- Region 1 OnCall Asphalt Paving Master Task Order Services APR 104-2026
- CDOT
- 6/12/26
- Region 1 SH 46 HMA Resurfacing STA R100-441 (27340)
- CDOT
- 6/4/26
- 2026 On Call Hot Bituminous Paving Services
- Fort Morgan
- 5/1/26
- Region 4 CO94 Resurfacing STA 094A-039 (27280)
- CDOT
- 4/9/26
- Asphalt Overlay
- Fort Collins
- 3/25/26
- 2C Asphalt Overlay
- Colorado Springs
- 1/16/26
- STR 010A-002 25780 Region 2 CO 10A Resurfacing
- CDOT
- $10,770,093
- 10/22/26
- Open Space Parking Lot Enhancement Project 2026
- Louisville
- $74,438
- 10/9/26
- F26 08 040 KGM Pavements 2026
- Greeley
- $10,378,843
- 9/10/26
- 2026 Mill Overlay
- Evans
- $1,071,298
- 9/4/26
- Region 1 I-225 Traffic Flow Improvements C 2254-093 (24443)
- CDOT
- $2,525,811
- 8/27/26
- Bicycle Training Course Mill Overlay Striping
- Arvada
- $112,506
- 8/19/26
- PN ENI000225 Carriage Hills GID 2026 Overlay
- Larimer County
- $500,000
- 8/5/26
- Region 4 CO52 Resurfacing NHPP 052A-067 (27449)
- CDOT
- $3,273,663
- 7/2/26
- Region 1 OnCall Asphalt Paving Master Task Order Services APR 104-2026
- CDOT
- $3,000,000
- 6/12/26
- Arapahoe County No C25 25 2026 Arapahoe County Reconstruction
- Arapahoe County
- $5,950,040
- 6/10/26
- Region 1 SH 46 HMA Resurfacing STA R100-441 (27340)
- CDOT
- $2,586,081
- 6/4/26
- 2026 Resurfacing Program PN ENM000126
- Larimer County
- $4,415,156
- 5/22/26
- 2026 0521 001 Asphalt
- Morgan County
- $94,550
- 5/20/26
- 2026 Street Alley Contract Mill Overlay
- Denver
- $6,849,909
- 5/6/26
- 2026 On Call Hot Bituminous Paving Services
- Fort Morgan
- $1,000,000
- 5/1/26
- 2026 HBP Paving
- Fort Morgan
- $2,569,036
- 5/1/26
- Roadway Patch 2026
- Windsor
- $404,240
- 4/30/26
- 2026 Street Maintenance Phase 2
- Erie
- $3,696,232
- 4/24/26
- Region 1 I76 Resurfacing NHPP R100-421 (26482)
- CDOT
- $12,574,197
- 4/16/26
- 2026 City Cherry Hills Village Mill Overlay
- Cherry Hills Village
- $518,081
- 4/9/26
- Region 4 CO94 Resurfacing STA 094A-039 (27280)
- CDOT
- $12,304,075
- 4/9/26
- LHX Runway 8 26 Rehabilitation
- La Junta
- $5,224,880
- 4/6/26
- Asphalt Overlay
- Fort Collins
- $5,737,094
- 3/25/26
- 2026 Street Maintenance
- Erie
- $1,076,287
- 3/24/26
- 2026 Roadway Sidewalk Improvements
- Berthoud
- $1,448,014
- 3/19/26
- Mill Overlay
- Milliken
- $173,002
- 3/16/26
- Parking Lot Repair Replacement Depot Museum
- Broomfield
- $315,657
- 3/5/26
- Region 4 CO86 Resurfacing STM 086A-059 (25632)
- CDOT
- $1,453,772
- 3/5/26
- 2026 Pavement Resurfacing
- Fountain
- $774,155
- 3/4/26
- Fairview St Improvements
- Woodland Park
- $442,566
- 2/20/26
- Thunder Ridge Pavement Reconstruction
- Woodland Park
- $983,378
- 2/20/26
- 2026 Pavement Resurfacing Program 26 ST 01B
- Arvada
- $6,188,055
- 2/19/26
- 2026 Street Paving Program
- Adams County
- $7,296,117
- 2/19/26
- Region 1 C470 Resurfacing NHPP 4701-139 (25589)
- CDOT
- $16,154,470
- 2/19/26
- WCR 8 Paving
- Dacono
- $537,880
- 1/21/26
- Weld County Parking Lot Removal Replacement
- Weld County
- $1,986,100
- 1/21/26
- 2026 Asphalt Mill Overlay
- Lone Tree
- $2,140,787
- 1/20/26
- 2C Asphalt Overlay
- Colorado Springs
- $500,000
- 1/16/26
- 2026 Asphalt Overlay 1
- Castle Rock
- $8,086,660
- 1/16/26
- 2026 Town Facility Parking Lot Improvement
- Castle Rock
- $1,187,164
- 1/13/26
- 2026 Asphalt Overlay 2
- Castle Rock
- $6,425,942
- 1/13/26
- Region 1 SH 74 Surface Treatment NHPP 0741-026 (24423)
- CDOT
- $7,366,702
- 1/8/26
- Region 1 SH 74 Surface Treatment NHPP 0741-026 (24423)
- Larimer County
- $500,000
- 10/04/26
- 120
- 30.8%
- $125,000
- $345,833
- Region 1 SH 74 Surface Treatment NHPP 0741-026 (24423)
- CDOT
- $3,000,000
- 08/11/26
- 365
- 25.2%
- $246,575
- $2,243,836
- Region 1 SH 74 Surface Treatment NHPP 0741-026 (24423)
- CDOT
- $2,586,081
- 08/03/26
- 120
- 83.3%
- $646,520
- $431,013
- $1,018,095
- $3,020,682



