- Zak Dirt Inc
- 2026
- 22
- 4
- 18.18%
- $47,802,905
- 3.13%
- 17.77%
- 9.09%
- $175,541,263

Zak Dirt Inc holds **$37.3M** in remaining backlog across four active projects, including **$22.4M** on the I70 widening and **$10.6M** on SH 7 improvements, supporting steady cash flow through mid-2026. Recent 2026 wins totaling **$47.8M** at a 28.6% success rate indicate improved bidding momentum that should sustain operations in the near term.
Medium-term Outlook (6-12 months)
Continued execution of the **$6.4M** US 287 and **$3.7M** Pace Street projects will draw down backlog, requiring new awards to maintain volume beyond early 2027. Elevated 2026 bidding activity of **$85.4M** total provides a pipeline that could offset the low **$1.6M** in 2025 wins if success rates hold near 30%.
Key Risk Period
A potential gap emerges in late 2026 if the current **$37.3M** backlog depletes without additional low bids, echoing the zero wins recorded in 2024. Extended contract durations on active projects heighten exposure to cost escalation and delayed payments during this transition.
Recommendations
Prioritize aggressive bidding on 8-10 additional opportunities quarterly to rebuild backlog above **$50M**. Implement monthly cash flow tracking tied to the four active projects to mitigate duration-related risks.
- Region 4 SH 7 Intersection Turn Lane Improvements C C070-094 (24705)
- CDOT
- 7/23/26
- Region 4 US 287 Intersection Improvements FSA 2873-233 (27210)
- CDOT
- 4/9/26
- Pace Street Rough Ready Trail Improvements
- Longmont
- 3/11/26
- Region 3 I70 Frisco Exit 203 Off Ramp Widening NHPP 0702-422 (24873)
- CDOT
- 2/5/26
- STM 0361-134 26361R Region 4 US 36 Traffic Barrier Replacement
- CDOT
- $4,612,441
- 10/1/26
- Bridge 19 46 5A Replacement
- Weld County
- $7,667,304
- 9/30/26
- Weld County Road 26 Multi Use Trail Phase 1
- Longmont
- $2,201,987
- 9/23/26
- Region 1 Cable Barrie Improvements I70 Watkins Bennett FSA 0704-264 (26823)
- CDOT
- $5,154,626
- 9/17/26
- Region 3 Bridge Scour Mitigation SH 13 STA 0131-073 (24354)
- CDOT
- $7,504,706
- 9/10/26
- Owl Canyon CR 70 Road Reconstruction CR 11 CR 13 PN 329
- Larimer County
- $5,069,834
- 9/9/26
- Mead Safe Routes School SAR M870 007 24459
- Mead
- $1,246,927
- 9/4/26
- Region 4 I76 Roadway Reconstruction Bridge Replacements NHPP 0761-252 (26370 combo)
- CDOT
- $56,647,294
- 8/13/26
- County Line Road Shoulder Improvements
- Longmont
- $4,657,175
- 8/11/26
- Region 4 SH 7 Intersection Turn Lane Improvements C C070-094 (24705)
- CDOT
- $10,575,136
- 7/23/26
- Weld County Road 34 Bridge Replacement
- Mead
- $1,167,796
- 5/11/26
- Region 2 Highway Intersection Improvements STR 0711-024 (25539R)
- CDOT
- $4,218,046
- 4/9/26
- Region 4 US 287 Intersection Improvements FSA 2873-233 (27210)
- CDOT
- $6,384,774
- 4/9/26
- PW2026 01 2026 Rock Creek Parkway Improvements
- Superior - CO
- $5,396,644
- 3/12/26
- Pace Street Rough Ready Trail Improvements
- Longmont
- $3,728,506
- 3/11/26
- Mountain Shadows Trail
- Firestone
- $141,924
- 2/17/26
- Grandview Boulevard Improvements Phase 2
- Dacono
- $2,205,359
- 2/10/26
- Region 2 SH 115 Concrete Preventative Maintenance STR 1151-043 (26371)
- CDOT
- $3,769,755
- 2/5/26
- Region 3 I70 Frisco Exit 203 Off Ramp Widening NHPP 0702-422 (24873)
- CDOT
- $27,114,489
- 2/5/26
- Gartrell Bridge Widening
- Aurora
- $9,671,372
- 1/21/26
- Water Quality Infrastructure Improvements
- Denver International Airport
- $4,066,172
- 1/13/26
- Trilby Bridge Replacement
- Fort Collins
- $2,338,996
- 1/8/26
- Trilby Bridge Replacement
- CDOT
- $10,575,136
- 09/21/26
- 330
- 5.8%
- $961,376
- $9,966,265
- Trilby Bridge Replacement
- CDOT
- $6,384,774
- 06/08/26
- 150
- 82.7%
- $1,276,955
- $1,106,694
- Trilby Bridge Replacement
- CDOT
- $27,114,489
- 04/06/26
- 730
- 25.5%
- $1,114,294
- $20,205,866
- $3,352,625
- $31,278,825