BidJudge.com - Projects
Farmington CO
87499
970-759-1534
Health Breakdown
Avg Left
20
Success
50
Avg Avg
10
Year Proj
30
2 Year Prior Proj
75
Qual Based
0
Cash Flow
25
 
210%
100%
Health
Financial Health & Pipeline Brief
Analyzed On:  Aug 13, 2026
Four Corners Oldcastle SW Group - CO (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
The **$27.8M** remaining backlog from nine active projects bid primarily in late 2025 through mid-2026 will generate steady cash inflows, particularly from resurfacing and preservation work with substantial estimated remainders. A 36.8% success rate on **$131.6M** in 2026 bids supports continued near-term project starts. Positive cash flow is expected as these contracts convert without immediate liquidity pressure.

Medium-term Outlook (6-12 months)
Award momentum from **$98.1M** in 2025 lows and **$37.3M** year-to-date in 2026 positions the firm for backlog replenishment if bidding volume holds near prior levels of **$268.9M-$300.9M**. Conversion of the current **$27.8M** will sustain operations through year-end while new wins extend visibility. Overall revenue trajectory remains stable barring major delays.

Key Risk Period
Depletion of the modest **$27.8M** backlog without accelerated awards creates exposure in the 9-15 month window, especially given annual award volumes that previously reached **$124M**. Extended contract durations may further stretch cash conversion cycles and heighten sensitivity to bid success rates around 37%.

Recommendations
Increase bid submissions in high-volume regions to target at least **$80M** in additional 2026-2027 awards while preserving the 37-41% win rate. Implement monthly backlog burn-rate tracking tied to the **$27.8M** figure to optimize working capital draws and preempt gaps.
 
JOBS LOW
  • Region 3 SH 386 US 50 Resurfacing STR 348A-001 (25237Combo)
  • CDOT
  • 6/18/26
  • Pavement Preservation Program 0389
  • Durango
  • 5/5/26
  • 2026 Contract Street Maintenance Riverside Parkway
  • Grand Junction
  • 4/21/26
  • Region 3 US 6 HMA Resurfacing NHPP 006A-080 (27237)
  • CDOT
  • 3/19/26
  • Orchard Avenue Safety Connectivity Project Phase 1
  • Mesa County
  • 3/19/26
  • Region 3 US 24 Resurfacing Other Improvements STR 0241-069 (25629)
  • CDOT
  • 3/5/26
  • Region 3 US 40 HMA Resurfacing Guardrail Improvements NHPP 0403-072 (26449)
  • CDOT
  • 2/19/26
  • Multimodal Pathway Overlay
  • Telluride
  • 1/30/26
Bidjudge
JOBS BID
  • Mesa County 32 1 2 Road Phase II Roadway Improvement
  • Mesa County
  • $5,313,670
  • 8/11/26
  • 2026 Gypsum Street Renovations Paving
  • Gypsum
  • $1,074,534
  • 7/7/26
  • Region 3 SH 386 US 50 Resurfacing STR 348A-001 (25237Combo)
  • CDOT
  • $9,809,976
  • 6/18/26
  • Region 1 SH 46 HMA Resurfacing STA R100-441 (27340)
  • CDOT
  • $2,747,836
  • 6/4/26
  • Region 3 I70 Resurfacing NHPP 0701-263 (27298)
  • CDOT
  • $5,721,692
  • 5/7/26
  • 2026 Street Alley Contract Mill Overlay
  • Denver
  • $9,659,120
  • 5/6/26
  • Pavement Preservation Program 0389
  • Durango
  • $2,964,324
  • 5/5/26
  • 2026 Contract Street Maintenance Riverside Parkway
  • Grand Junction
  • $505,021
  • 4/21/26
  • Region 1 I76 Resurfacing NHPP R100-421 (26482)
  • CDOT
  • $12,947,927
  • 4/16/26
  • Region 4 CO94 Resurfacing STA 094A-039 (27280)
  • CDOT
  • $12,608,476
  • 4/9/26
  • Region 2 Highway Intersection Improvements STR 0711-024 (25539R)
  • CDOT
  • $3,537,360
  • 4/9/26
  • LHX Runway 8 26 Rehabilitation
  • La Junta
  • $4,393,800
  • 4/6/26
  • Pines Drive Resurfacing
  • Archuleta County
  • $571,994
  • 3/19/26
  • Region 3 US 6 HMA Resurfacing NHPP 006A-080 (27237)
  • CDOT
  • $3,067,017
  • 3/19/26
  • Orchard Avenue Safety Connectivity Project Phase 1
  • Mesa County
  • $3,937,740
  • 3/19/26
  • Region 3 US 24 Resurfacing Other Improvements STR 0241-069 (25629)
  • CDOT
  • $12,299,613
  • 3/5/26
  • Region 1 C470 Resurfacing NHPP 4701-139 (25589)
  • CDOT
  • $17,897,554
  • 2/19/26
  • Region 3 US 40 HMA Resurfacing Guardrail Improvements NHPP 0403-072 (26449)
  • CDOT
  • $4,716,276
  • 2/19/26
  • Crosby Avenue Improvements
  • Grand Junction
  • $3,333,690
  • 2/9/26
  • Multimodal Pathway Overlay
  • Telluride
  • $580,366
  • 1/30/26
  • Region 1 SH 74 Surface Treatment NHPP 0741-026 (24423)
  • CDOT
  • $7,820,762
  • 1/8/26
  • Region 5 US 160 Surface Treatment NHPP 1602-184 (24662)
  • CDOT
  • $12,515,617
  • 1/8/26
Bidjudge
CASH FLOW
  • Region 5 US 160 Surface Treatment NHPP 1602-184 (24662)
  • CDOT
  • $9,809,976
  • 08/17/26
  • 180
  • 22.2%
  • $1,634,996
  • $7,629,981
  • Region 5 US 160 Surface Treatment NHPP 1602-184 (24662)
  • Durango
  • $2,964,324
  • 07/04/26
  • 120
  • 69.2%
  • $741,081
  • $914,000
  • Region 5 US 160 Surface Treatment NHPP 1602-184 (24662)
  • Grand Junction
  • $505,021
  • 06/20/26
  • 120
  • 80.8%
  • $126,255
  • $96,796
  • Region 5 US 160 Surface Treatment NHPP 1602-184 (24662)
  • CDOT
  • $12,299,613
  • 05/04/26
  • 150
  • 96.0%
  • $2,459,923
  • $491,985
  • Region 5 US 160 Surface Treatment NHPP 1602-184 (24662)
  • CDOT
  • $4,716,276
  • 04/20/26
  • 180
  • 87.8%
  • $786,046
  • $576,434
  • Region 5 US 160 Surface Treatment NHPP 1602-184 (24662)
  • CDOT
  • $2,440,781
  • 02/16/26
  • 365
  • 60.5%
  • $200,612
  • $962,938
  • Region 5 US 160 Surface Treatment NHPP 1602-184 (24662)
  • CDOT
  • $12,017,516
  • 02/09/26
  • 300
  • 76.0%
  • $1,201,752
  • $2,884,204
  • Region 5 US 160 Surface Treatment NHPP 1602-184 (24662)
  • CDOT
  • $9,155,884
  • 01/19/26
  • 300
  • 83.0%
  • $915,588
  • $1,556,500
  • $8,066,253
  • $15,112,838
Bidjudge