BidJudge.com - Projects
office@twolfx.com
520 N 45th Place
Broken Arrow CO
74014
918-355-7458
Health Breakdown
Avg Left
20
Success
10
Avg Avg
0
Year Proj
50
2 Year Prior Proj
Qual Based
0
Cash Flow
25
 
105%
100%
Health
Financial Health & Pipeline Brief
Analyzed On:  Jun 27, 2026
TWX Timber Wolf Excavating - CO (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
With **$51M** remaining backlog from recently awarded projects totaling **$20.4M** in 2026 wins, cash flow should remain stable as work progresses on active contracts. Execution of the three largest 2026 awards will drive near-term billings and collections. Low recent win rates suggest limited new starts in this window.

Medium-term Outlook (6-12 months)
Bidding volume remains elevated at **$86M** YTD in 2026 with an improved **18.8%** success rate, positioning the firm to replenish backlog if conversion holds. Medium-term revenue depends on converting additional low bids amid ongoing **$51M** backlog drawdown. Sustained performance could support **$15-20M** in new awards by year-end.

Key Risk Period
The primary risk window emerges in late 2026 through early 2027 if win rates revert toward the prior **10-11%** levels, potentially creating a backlog gap after current **$51M** is substantially consumed. Extended 120-month durations on most projects may also strain cash flow timing and mobilization costs.

Recommendations
Prioritize selective bidding on higher-probability opportunities to maintain at least **15%** win rate while monitoring monthly backlog burn rate. Implement enhanced cash flow forecasting tied to long-duration contracts and consider bonding capacity reviews ahead of any volume increase.
 
JOBS LOW
  • 120th Street Multimodal Safety Improvements
  • Boulder County
  • 1/29/26
  • WCR 54 13 Roundabout Project
  • Weld County
  • 1/16/26
  • Coach Miller Drive 14th Street Construction
  • Glenwood Springs
  • 1/14/26
Bidjudge
JOBS BID
  • Region 4 SH 7 Intersection Turn Lane Improvements C C070-094 (24705)
  • CDOT
  • $11,058,440
  • 7/23/26
  • 15th Street Waterline Replacement
  • Windsor
  • $3,729,200
  • 7/15/26
  • Colorado Blvd WCR13 Realignment Construction
  • Windsor
  • $2,087,152
  • 7/10/26
  • 2026 Water Main Replacement
  • Louisville
  • $1,990,362
  • 7/7/26
  • Region 1 US 287 Intersection Improvements NHPP 2873-227 (25717)
  • CDOT
  • $2,951,605
  • 7/2/26
  • Crossroads Colorado Blvd Roundabout Construction
  • Windsor
  • $8,506,254
  • 6/23/26
  • East Sewer Interceptor North Extension
  • Windsor
  • $4,882,300
  • 6/17/26
  • 700 Block Alley South Public Road Improvements
  • Lafayette
  • $937,585
  • 6/5/26
  • Construction North 40th Avenue Roadway Segment
  • Brighton
  • $3,443,311
  • 6/5/26
  • Mall Road Waterline Looping
  • Estes Park
  • $2,286,591
  • 5/28/26
  • 5th Street Backlot Parking Lot
  • Windsor
  • $2,689,124
  • 5/28/26
  • Construction Sable Blvd Intersection Improvements
  • Brighton
  • $7,996,225
  • 4/30/26
  • 19th Street Improvements
  • Glenwood Springs
  • $1,197,176
  • 4/8/26
  • Tennessee Oneida Storm System Phase 3
  • Denver
  • $7,731,455
  • 3/3/26
  • Grandview Boulevard Improvements Phase 2
  • Dacono
  • $3,036,966
  • 2/10/26
  • Lone Tree Creek Trail Underpass Arapahoe Road MP 19 6
  • Centennial
  • $6,481,530
  • 2/6/26
  • 120th Street Multimodal Safety Improvements
  • Boulder County
  • $4,038,591
  • 1/29/26
  • Gartrell Bridge Widening
  • Aurora
  • $11,844,152
  • 1/21/26
  • WCR 54 13 Roundabout Project
  • Weld County
  • $14,197,526
  • 1/16/26
  • Coach Miller Drive 14th Street Construction
  • Glenwood Springs
  • $2,119,025
  • 1/14/26
  • Water Quality Infrastructure Improvements
  • Denver International Airport
  • $4,860,859
  • 1/13/26
  • 2025 Water Main Replacement 25 WA 01
  • Arvada
  • $8,081,710
  • 1/13/26
Bidjudge
CASH FLOW
  • $0
  • $0
Bidjudge