BidJudge.com - Projects
info@buildwithdrake.com
3737 Lamar Ave 700
Paris TX
75460
903-784-4321
903-784-4768
Health Breakdown
Avg Left
50
Success
40
Avg Avg
10
Year Proj
2 Year Prior Proj
Qual Based
0
Cash Flow
-15
 
85%
85%
Health
Financial Health & Pipeline Brief
Analyzed On:  Aug 13, 2026
Drake Companies Brad (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
The **$99.5M** in 2026 low bids, including Bexar at **$89M** and Rusk at **$8.7M**, will initiate cash inflows as mobilization begins on these recently awarded projects. Combined with **$746K** remaining on Smith, the **$146M** total backlog supports positive near-term liquidity assuming standard progress billing cycles.

Medium-term Outlook (6-12 months)
Execution of the Atlanta project’s **$49M** remaining balance will sustain revenue through the period alongside partial drawdown of the 2026 awards. Overall backlog provides coverage for operations, though conversion of the 20% success rate into additional wins will be needed to prevent gaps.

Key Risk Period
Extended durations exceeding 100 months on multiple projects create exposure to payment delays and cost escalation beyond 12 months. The 0% success rate in 2025 underscores vulnerability if 2026 bidding momentum does not continue.

Recommendations
Accelerate billing and collections on active projects to optimize cash conversion from the **$146M** backlog. Increase bid volume while targeting sub-2% margins on low bids to rebuild pipeline. Monitor duration-related risks and secure retainage releases promptly.
 
JOBS LOW
  • Bexar US 271 0165-02-061
  • TXDOT
  • 7/1/26
  • Smith SL 323 1790-02-048
  • TXDOT
  • 4/8/26
  • Rusk FM 1251 1388-01-010
  • TXDOT
  • 4/7/26
Bidjudge
JOBS BID
  • Gregg FM 2275 2158-01-020
  • TXDOT
  • $20,084,031
  • 8/6/26
  • Bowie IH 30 0610-05-060
  • TXDOT
  • $11,520,690
  • 8/6/26
  • Morris SH 11 0222-03-065
  • TXDOT
  • $13,998,023
  • 8/5/26
  • Smith FM 756 0492-04-034
  • TXDOT
  • $65,286,576
  • 7/2/26
  • Nacogdoches US 259 0138-06-047
  • TXDOT
  • $65,789,279
  • 7/2/26
  • Bexar US 271 0165-02-061
  • TXDOT
  • $89,285,640
  • 7/1/26
  • Lamar FM 2820 2993-01-011
  • TXDOT
  • $4,883,905
  • 6/3/26
  • Titus IH 30 0610-03-095
  • TXDOT
  • $12,337,808
  • 5/7/26
  • Nacogdoches FM 2259 2116-01-024
  • TXDOT
  • $6,820,661
  • 5/6/26
  • Smith SL 323 1790-02-048
  • TXDOT
  • $1,516,226
  • 4/8/26
  • Rusk FM 1251 1388-01-010
  • TXDOT
  • $8,734,907
  • 4/7/26
  • Comal SH 11 0218-05-037
  • TXDOT
  • $2,577,843
  • 4/7/26
  • Bowie US 82 0046-03-040
  • TXDOT
  • $62,162,573
  • 3/4/26
  • Gregg IH 20 0495-07-074
  • TXDOT
  • $279,323,710
  • 1/7/26
  • Wood SH 37 0190-03-089
  • TXDOT
  • $4,599,006
  • 1/6/26
Bidjudge
CASH FLOW
  • Wood SH 37 0190-03-089
  • TXDOT
  • $1,516,226
  • 06/07/26
  • 130
  • 60.8%
  • $349,898
  • $594,827
  • Wood SH 37 0190-03-089
  • TXDOT
  • $8,734,907
  • 06/06/26
  • 285
  • 28.1%
  • $919,464
  • $6,283,003
  • Wood SH 37 0190-03-089
  • TXDOT
  • $114,513,431
  • 09/30/24
  • 1200
  • 57.9%
  • $2,862,836
  • $48,191,069
  • $4,132,198
  • $144,354,539
Bidjudge