- Highway 19 Construction
- 2026
- 28
- 6
- 21.43%
- $139,616,154
- 3.71%
- 16.16%
- 9.61%
- $397,405,158

Highway 19 Construction enters the near term with a strong **$132M** remaining backlog, anchored by three March 2026 awards totaling **$135M** with **$118M** still to bill. These projects will generate steady cash inflows as mobilization and early phases advance.
Medium-term Outlook (6-12 months)
Backlog drawdown from the **$132M** position will accelerate, supported by 2025 awards still carrying **$14M** in remaining value. Continued bidding momentum at **$392M** annual volume should offset burn if win rates hold near 16%.
Key Risk Period
The 12-18 month window presents the highest exposure, as current long-duration contracts begin to wind down without confirmed replacement volume at prior **$135M** award levels.
Recommendations
Aggressively target additional TXDOT lettings to rebuild backlog above **$150M** and tighten bid margins below the recent 2.19% average left on low.
- Kaufman SH 34 0173-04-063
- TXDOT
- $1,077,943
- 9/2/26
- Fannin SH 121 0549-02-038
- TXDOT
- $1,979,904
- 9/2/26
- Red River FM 44 0427-01-042
- TXDOT
- $1,792,908
- 9/2/26
- Victoria COUNTY ROAD 1018 0901-21-022
- TXDOT
- $1,791,858
- 8/6/26
- Harrison SH 43 0208-01-026
- TXDOT
- $3,442,164
- 8/6/26
- Bowie IH 30 0610-05-060
- TXDOT
- $13,658,247
- 8/6/26
- Gregg FM 2275 2158-01-020
- TXDOT
- $19,144,418
- 8/6/26
- Victoria COUNTY ROAD 35080 0901-29-100
- TXDOT
- $984,747
- 8/5/26
- Grayson SH 5 0047-03-106
- TXDOT
- $1,132,589
- 8/5/26
- Kaufman US 80 0095-04-079
- TXDOT
- $1,178,670
- 8/5/26
- Smith FM 756 0492-04-034
- TXDOT
- $63,873,899
- 7/2/26
- Bexar US 271 0165-02-061
- TXDOT
- $93,554,962
- 7/1/26
- Kaufman FM 3039 3089-01-013
- TXDOT
- $754,504
- 7/1/26
- Dallas VARIOUS 0918-47-527
- TXDOT
- $2,972,711
- 5/7/26
- Grayson CRAFT RD 0901-19-212
- TXDOT
- $931,365
- 5/6/26
- Bowie FM 3527 3591-01-006
- TXDOT
- $1,054,303
- 5/6/26
- Grayson VARIOUS 0901-19-229
- TXDOT
- $2,965,581
- 3/5/26
- Smith VARIOUS 0910-00-141
- TXDOT
- $1,113,235
- 3/5/26
- Hunt FM 816 1097-01-018
- TXDOT
- $2,501,731
- 3/5/26
- Comal US 67 0261-01-041
- TXDOT
- $63,703,073
- 3/4/26
- Bowie US 82 0046-03-040
- TXDOT
- $54,806,521
- 3/4/26
- Dallas SS 348 0581-02-156
- TXDOT
- $16,606,596
- 3/4/26
- Dallas NW CR 4340 0918-18-142
- TXDOT
- $1,586,486
- 2/5/26
- Lamar BU 271B 0901-00-067
- TXDOT
- $727,152
- 2/4/26
- Rockwall FM 549 1015-01-024
- TXDOT
- $32,124,987
- 2/4/26
- Hopkins FM 900 0680-04-016
- TXDOT
- $3,337,201
- 1/6/26
- Ellis BI 45G 0092-08-021
- TXDOT
- $1,845,088
- 1/6/26
- Wood SH 37 0190-03-089
- TXDOT
- $6,762,315
- 1/6/26
- Fannin SH 121 0549-02-038
- TXDOT
- $1,979,904
- 11/01/26
- 84
- 0%
- -
- $1,979,904
- Red River FM 44 0427-01-042
- TXDOT
- $1,792,908
- 11/01/26
- 64
- 0%
- -
- $1,792,908
- Wood SH 37 0190-03-089
- TXDOT
- $63,703,073
- 05/03/26
- 642
- 19.2%
- $2,976,779
- $51,498,279
- Wood SH 37 0190-03-089
- TXDOT
- $54,806,521
- 05/03/26
- 1400
- 8.8%
- $1,174,425
- $49,991,377
- Wood SH 37 0190-03-089
- TXDOT
- $16,606,596
- 05/03/26
- 629
- 19.6%
- $792,048
- $13,359,201
- Wood SH 37 0190-03-089
- TXDOT
- $31,901,002
- 08/31/25
- 535
- 68.8%
- $1,788,841
- $9,957,883
- Wood SH 37 0190-03-089
- TXDOT
- $8,168,666
- 07/01/25
- 597
- 71.9%
- $410,486
- $2,298,720
- $7,142,579
- $130,878,272