Health Breakdown
Avg Left
20
Success
40
Avg Avg
5
Year Proj
50
2 Year Prior Proj
75
Qual Based
0
Cash Flow
-25
 
165%
100%
Health
Financial Health & Pipeline Brief
Analyzed On:  Jun 29, 2026
Patin Construction (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
Patin Construction enters the period with strong momentum from **$70.5M** in 2026 low bids, including multiple large roadway projects such as **$18.9M** Center Street and **$18.3M** Pflugerville Immanuel. The **$133M** total backlog provides immediate cash flow visibility through active contracts with durations extending 120+ months. Execution focus should remain on mobilization of the six recently awarded jobs to maintain positive operating cash.

Medium-term Outlook (6-12 months)
Work-off of the **$133M** backlog will accelerate as shorter-duration 2025 and 2024 projects (**$16M** and **$34.7M** respectively) reach completion, requiring steady new awards to avoid revenue gaps. Success rate improvement to 20% in 2026 supports continued bidding volume of **$149M** annually, but conversion must be sustained above historical averages. Cash flow remains stable provided change orders and retainage collections align with the long contract durations.

Key Risk Period
The 12-18 month window presents the highest exposure once the current **$70.5M** 2026 awards begin to wind down without corresponding 2027 wins. Historical volatility in success rates (10.8%-22.7%) and average left-on-low margins of 3.62%-7.16% could pressure liquidity if bid volume declines or project durations extend further.

Recommendations
Prioritize selective bidding on high-probability TX municipal roadway and utility packages to replenish backlog above **$100M**. Implement monthly cash flow forecasting tied to the **$133M** backlog burn rate and negotiate accelerated payment terms on long-duration contracts.
 
JOBS LOW
  • Heritage Trail East
  • Round Rock
  • 6/12/26
  • Old Howard Road Wendland Road Northlink Drive
  • Temple City
  • 6/9/26
  • City Park Parking Lot Expansion
  • Liberty Hill
  • 6/3/26
  • Waterleaf Steeplechase Parks Parking Lot Improvements
  • Kyle
  • 4/9/26
  • Center Street Road Bond
  • Kyle
  • 3/19/26
  • East Pflugerville Parkway Colorado Sands Drive Weiss Lane Roadway
  • Pflugerville
  • 3/3/26
  • Pflugerville Immanuel Road
  • Pflugerville
  • 2/18/26
Bidjudge
JOBS BID
  • Little River Academy S King S Trail Street Improvements
  • KPA Engineers
  • $155,805
  • 7/14/26
  • 202654 D B Wood Road Phase IIA Oak Ridge Road Williams Drive
  • Georgetown
  • $6,349,670
  • 7/8/26
  • Heritage Trail East
  • Round Rock
  • $6,591,624
  • 6/12/26
  • 5th Murphy Waterline Replacement
  • Taylor
  • $430,873
  • 6/10/26
  • Old Howard Road Wendland Road Northlink Drive
  • Temple City
  • $15,611,571
  • 6/9/26
  • City Park Parking Lot Expansion
  • Liberty Hill
  • $2,701,397
  • 6/3/26
  • Bobwhite Rd 30 Inch Water Main Phase 3
  • County Line Special Utility District (CLSUD)
  • $2,555,178
  • 5/28/26
  • Smyers Lane County Road 122 Rehabilitation
  • Round Rock
  • $1,430,129
  • 5/19/26
  • Maxwell Sud 16 Inch Pvc Pipeline From Jolly Road Sh 142
  • Maxwell Special Utility District
  • $973,270
  • 5/19/26
  • Bastrop FM 969 1186-02-028
  • TXDOT
  • $3,867,053
  • 5/6/26
  • Wastewater Line Extension Plan Taylor Edc
  • Taylor EDC
  • $610,049
  • 5/5/26
  • 26IFB40 CR 267 Reconstruction
  • Williamson County
  • $1,188,567
  • 5/5/26
  • E Central Avenue Bridge Replacement
  • Belton
  • $5,277,891
  • 5/5/26
  • 26IFB33 North Barker Street
  • Williamson County
  • $992,240
  • 4/15/26
  • Waterleaf Steeplechase Parks Parking Lot Improvements
  • Kyle
  • $2,390,688
  • 4/9/26
  • Church Street Wastewater Improvements
  • Georgetown
  • $1,319,825
  • 4/9/26
  • Avenue A Improvements Phase I
  • Temple
  • $1,860,860
  • 4/2/26
  • Chandler Road CR 119 Intersection Improvements
  • Round Rock
  • $943,605
  • 3/26/26
  • Kyle Parkway Waterline Part I
  • Kyle
  • $4,472,907
  • 3/19/26
  • Center Street Road Bond
  • Kyle
  • $18,940,105
  • 3/19/26
  • Meadows Dr Water Wastewater Storm Drain Improvements Area 2 4
  • Round Rock
  • $6,878,911
  • 3/18/26
  • Elgin County Line Road Phase Ii Kennedy Street
  • Elgin
  • $9,567,858
  • 3/5/26
  • East Pflugerville Parkway Colorado Sands Drive Weiss Lane Roadway
  • Pflugerville
  • $12,572,533
  • 3/3/26
  • Georgetown Neighborhood Park Improvements Waypoint Park Vista Vera Park Madison Oaks Park Donegal P
  • Georgetown
  • $841,838
  • 2/26/26
  • City Park East Parking Lot
  • Buda
  • $821,170
  • 2/26/26
  • Pflugerville Immanuel Road
  • Pflugerville
  • $18,277,784
  • 2/18/26
  • Rosebud 2023 Cdbg Water Line
  • Rosebud
  • $413,050
  • 2/17/26
  • 2026 Downtown Sidewalk Improvements
  • Georgetown
  • $2,084,145
  • 2/12/26
  • Hwy 80 Utility Relocations (REBID)
  • Sunnyvale - TX
  • $15,554,526
  • 2/12/26
  • Williamson FM 3405 1755-03-010
  • TXDOT
  • $3,287,395
  • 2/5/26
  • Williamson FM 487 1201-02-026
  • TXDOT
  • $3,983,934
  • 2/5/26
  • 2025 Curb Replacement
  • Taylor
  • $179,500
  • 1/28/26
  • Windy Hill Road Improvements
  • Kyle
  • $9,124,019
  • 1/15/26
Bidjudge
CASH FLOW
  • Windy Hill Road Improvements
  • Kyle
  • $2,390,688
  • 06/08/26
  • 120
  • 30.8%
  • $597,672
  • $1,653,559
  • Windy Hill Road Improvements
  • Kyle
  • $18,940,105
  • 05/18/26
  • 860
  • 6.7%
  • $660,701
  • $17,662,749
  • Windy Hill Road Improvements
  • Pflugerville
  • $12,572,533
  • 05/02/26
  • 535
  • 13.8%
  • $705,002
  • $10,833,528
  • Windy Hill Road Improvements
  • Pflugerville
  • $18,277,784
  • 04/19/26
  • 517
  • 16.8%
  • $1,060,606
  • $15,202,025
  • $3,023,981
  • $70,256,453
Bidjudge