Financial Health & Pipeline Brief
Analyzed On:  Jun 25, 2026
Harper Brothers - TX (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
Harper Brothers enters the period with a substantial **$481M** remaining backlog anchored by the recent **$74M** Harris US 290 award and multiple active large-scale projects. Steady progress billings on these contracts should support positive cash flow and operational continuity. Low recent win rates, however, limit immediate pipeline replenishment.

Medium-term Outlook (6-12 months)
Execution of the **$481M** backlog continues to provide revenue visibility, yet the sharp drop in success rate to **4.3%** in 2026 signals reduced new award momentum. Cash flow remains supported by long-duration contracts but will require disciplined cost control as older projects wind down.

Key Risk Period
The 12-18 month horizon represents the primary risk window if bidding success does not recover, as backlog burn could outpace new wins given the trend of only **1-3** jobs secured annually despite high bid volume.

Recommendations
Tighten bid qualification criteria and target higher-probability opportunities to lift win rates above **6%**. Maintain rigorous cash-flow forecasting tied to the **$481M** backlog to preserve liquidity through the risk period.
 
JOBS LOW
  • Fort Bend SH 99 3510-04-066
  • TXDOT
  • 7/1/26
  • Southwest 96 Inch Water Transmission Pipeline
  • Dallas
  • 5/15/26
  • Harris US 290 0050-06-092
  • TXDOT
  • 2/4/26
Bidjudge
JOBS BID
  • Generation Park East Outfall
  • Generation Park Management District
  • $21,525,001
  • 7/28/26
  • 15 Windermere Lane Outfall Repair
  • Houston
  • $7,602,597
  • 7/23/26
  • West Lucas Road Reconstruction Widening
  • Lucas
  • $22,192,132
  • 7/21/26
  • Johnson IH 35W 0014-03-088
  • TXDOT
  • $69,798,707
  • 7/1/26
  • Fort Bend SH 99 3510-04-066
  • TXDOT
  • $19,505,917
  • 7/1/26
  • Stover Creek Force Main Segment C
  • North Texas Municipal Water District
  • $20,062,107
  • 6/19/26
  • HOU Reconstruction Runway 13R 31L William P Hobby Airport
  • Houston
  • $109,231,024
  • 6/18/26
  • San Marcos Regional Airport Taxilanes Repairs
  • San Marcos - TX
  • $853,670
  • 6/4/26
  • Harris BROADWAY ST 0912-72-846
  • TXDOT
  • $6,857,738
  • 6/2/26
  • Dallas SS 366 0196-07-034
  • TXDOT
  • $108,343,592
  • 6/2/26
  • IFB 26 0512 Market Street Reconstruction
  • Baytown
  • $25,662,642
  • 5/29/26
  • Leonard Treated Water Pipeline Farmersville Delivery Point
  • North Texas Municipal Water District
  • $43,722,975
  • 5/27/26
  • Southwest 96 Inch Water Transmission Pipeline
  • Dallas
  • $500,000
  • 5/15/26
  • Iron Bridge Dam Rock Riprap Repair Phase 3
  • Sabine River Authority of Texas
  • $8,931,000
  • 4/21/26
  • Construction Genoa Red Bluff Stormwater Detention Basins Phase 2
  • Harris County Precinct 2
  • $62,207,658
  • 4/20/26
  • 2020 Water Supply Distribution Improvements Cid 03 Pipelines Contract
  • Wellborn Special Utility District
  • $48,791,024
  • 4/9/26
  • West Lubbock Water System Expansion
  • Lubbock
  • $23,207,362
  • 4/9/26
  • Harris SH 99 3510-05-047
  • TXDOT
  • $143,791,906
  • 4/8/26
  • Channel Conveyance Improvements Poor Farm Ditch Bellaire Blvd University Blvd
  • Harris County Flood Control District
  • $34,778,815
  • 3/16/26
  • PW West Bailey Boswell Rd No 104153
  • Fort Worth
  • $21,976,877
  • 3/5/26
  • Comal US 67 0261-01-041
  • TXDOT
  • $66,338,015
  • 3/4/26
  • Dallas SS 348 0581-02-156
  • TXDOT
  • $18,525,941
  • 3/4/26
  • Gp East Paving Drainage Utilities Sec 1 3
  • Generation Park Management District
  • $20,227,926
  • 2/26/26
  • 121 Regional Disposal Facility Sector 6C 6D Mass Excavation
  • North Texas Municipal Water District
  • $9,451,020
  • 2/12/26
  • Colorado US 90 0026-06-033
  • TXDOT
  • $7,328,430
  • 2/5/26
  • Harris US 290 0050-06-092
  • TXDOT
  • $74,036,474
  • 2/4/26
  • Rockwall FM 549 1015-01-024
  • TXDOT
  • $33,779,105
  • 2/4/26
  • Ellis SS 394 2921-01-010
  • TXDOT
  • $23,570,223
  • 2/4/26
  • Lift Station No 1 Force Main Replacement
  • Lake Jackson
  • $19,099,140
  • 1/21/26
Bidjudge
CASH FLOW
  • Lift Station No 1 Force Main Replacement
  • Dallas
  • $500,000
  • 07/14/26
  • 120
  • 16.7%
  • $125,000
  • $416,667
  • Lift Station No 1 Force Main Replacement
  • TXDOT
  • $74,036,474
  • 04/05/26
  • 864
  • 13.9%
  • $2,570,711
  • $63,753,630
  • Lift Station No 1 Force Main Replacement
  • Baytown
  • $48,825,786
  • 10/20/25
  • 1183
  • 24.3%
  • $1,238,186
  • $36,980,477
  • Lift Station No 1 Force Main Replacement
  • Houston
  • $69,716,798
  • 03/17/25
  • 1080
  • 46.7%
  • $1,936,578
  • $37,182,292
  • Lift Station No 1 Force Main Replacement
  • TXDOT
  • $9,581,000
  • 09/08/24
  • 800
  • 86.9%
  • $359,288
  • $1,257,506
  • Lift Station No 1 Force Main Replacement
  • TXDOT
  • $34,430,610
  • 07/01/24
  • 1200
  • 63.7%
  • $860,765
  • $12,509,788
  • Lift Station No 1 Force Main Replacement
  • TXDOT
  • $48,503,886
  • 07/03/23
  • 1200
  • 94.0%
  • $1,212,597
  • $2,910,233
  • Lift Station No 1 Force Main Replacement
  • TXDOT
  • $46,333,941
  • 06/04/23
  • 1200
  • 96.4%
  • $1,158,349
  • $1,660,300
  • $9,461,474
  • $176,176,810