BidJudge.com - Projects
  • TAB Contractors
  • 2026
  • 11
  • 2
  • 18.18%
  • $7,393,977
  • 34.75%
  • 24.78%
  • 6.91%
  • $71,094,230
info@nclasvegas.com
4035 Flossmoor St
Las Vegas NV
89115
702-642-3331
Health Breakdown
Avg Left
-20
Success
30
Avg Avg
10
Year Proj
-30
2 Year Prior Proj
-30
Qual Based
0
Cash Flow
50
 
10%
10%
Health
Financial Health & Pipeline Brief
Analyzed On:  Jun 25, 2026
TAB Contractors (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
TAB Contractors enters the period with **$226M** total remaining backlog, supported by two 2026 awards (**$7.4M** total low) and active projects such as Carey Ave (**$1.6M**) and Las D Gates (**$5.8M**). Cash inflows should remain stable from ongoing drainage and pipeline work bid in 2025, though the 20% success rate limits immediate replenishment.

Medium-term Outlook (6-12 months)
Revenue acceleration is expected from the **$58M** in 2025 low bids, including the **$29.9M** Garnet Valley and **$20.8M** Taxiway D projects whose 120-300 month durations will sustain billings. Backlog burn will offset the modest 2026 award pace, maintaining positive cash flow if change orders and retainage releases track historical patterns.

Key Risk Period
The 12-18 month window presents the greatest exposure once 2025 projects reach substantial completion, coinciding with only **$7.4M** in new 2026 awards and a continued 20% hit rate that may not replace burned backlog fast enough.

Recommendations
Increase bid volume beyond the current 10-20 jobs per year while tightening “left on low” margins (currently 34.75% in 2026) to improve award density; implement monthly backlog and cash-flow modeling tied to the longest-duration contracts to protect working capital.
 
JOBS LOW
  • Carey Ave 36 Inch Water Main Corrosion Protection
  • North Las Vegas
  • 6/4/26
  • Las D Gates Apron Taxiway C Islands Rehab
  • Clark County Department Aviation
  • 5/5/26
Bidjudge
JOBS BID
  • 2026 Town Wash Detention Basin Spillway Rehabilitation
  • Mesquite
  • $207,000
  • 7/7/26
  • Carey Ave 36 Inch Water Main Corrosion Protection
  • North Las Vegas
  • $1,639,200
  • 6/4/26
  • Pioneer Detention Basin Repairs
  • Henderson
  • $997,799
  • 5/27/26
  • Meadows Charleston Storm Drain Via Olivero
  • Las Vegas
  • $13,380,170
  • 5/27/26
  • Orchard Collector Charleston Blvd Linden Ave
  • Clark County
  • $11,240,340
  • 5/6/26
  • Las D Gates Apron Taxiway C Islands Rehab
  • Clark County Department Aviation
  • $5,754,777
  • 5/5/26
  • Intersection Improvements Volunteer Blvd Via Centro
  • Henderson
  • $2,193,000
  • 5/5/26
  • BTC North Driveway Improvements
  • Regional Transportation Commission
  • $298,000
  • 4/29/26
  • Iron Mountain Road Bradley Road Thom Blvd
  • Las Vegas
  • $17,878,903
  • 4/27/26
  • Sewer Lateral Repair Phase 1
  • Henderson
  • $487,784
  • 3/18/26
  • 4522 READV SI 095 1 342 MS 159 0 003
  • NDOT
  • $17,017,257
  • 1/29/26
Bidjudge
CASH FLOW
  • 4522 READV SI 095 1 342 MS 159 0 003
  • Clark County Department Aviation
  • $5,754,777
  • 07/04/26
  • 120
  • 5.8%
  • $1,438,694
  • $5,419,082
  • 4522 READV SI 095 1 342 MS 159 0 003
  • Las Vegas VWD
  • $1,412,392
  • 12/07/25
  • 270
  • 80.0%
  • $156,932
  • $282,478
  • $1,595,626
  • $7,340,760
Bidjudge