- Dry Creek Structures
- 2026
- 16
- 4
- 25.00%
- $122,984,061
- 5.52%
- 14.44%
- 8.22%
- $189,901,585

The **$110M** remaining backlog is dominated by the **$104M** on the SR 177 project awarded in April 2026, with initial cash flows supported by mobilization on the May 2026 awards. Shorter-duration projects such as the 90-month I-15 SR 232 (**$1.4M** remaining) will generate near-term revenue. Overall execution should remain stable given the **$123M** in 2026 low bids.
Medium-term Outlook (6-12 months)
Continued progress across the four active projects, including the **$7.8M** I-15 10600 S job, will sustain cash flow through the end of 2027. The upward trend in win rates to 26.7% and **$188M** total bids in 2026 support backlog replenishment. Revenue recognition will remain front-loaded on the large SR 177 contract.
Key Risk Period
The 850-month duration and **$104M** concentration in a single project create elevated exposure to schedule delays and cash flow variability beyond 12 months. Lower historical success rates (19% in 2024) increase the risk of backlog erosion if new awards slow.
Recommendations
Diversify bidding toward shorter-duration projects to reduce concentration risk in the **$111M** SR 177 contract. Maintain bidding volume above **$150M** annually while targeting success rates above 25%. Closely track monthly burn rates on the **$110M** backlog to preserve liquidity.
- Lower Provo River Parkway Improvements
- Utah County
- $1,443,789
- 9/9/26
- US 40 Culvert Replacement MP 29 5 F-0040(235)29
- UDOT
- $2,218,145
- 7/30/26
- Gentile Street 2400 East 2600 East
- Layton
- $3,761,002
- 6/30/26
- UTN 3900 4100 South Shared Use Path Phase 1 S-TR02(4)
- UDOT
- $4,690,317
- 6/18/26
- I 15 SR 232 SR 103 F-I15-7(388)332
- UDOT
- $2,144,222
- 5/14/26
- Pioneer Road Improvements
- Draper
- $1,987,061
- 5/13/26
- 400 East 100 South Pages Lane F-1388(1)4
- UDOT
- $1,611,873
- 5/12/26
- 3600 West 2600 N 1975 N Plain City F-3370(1)0
- UDOT
- $3,527,371
- 5/5/26
- BFP American Fork City Bridge Replacements 2 F-LC49(203)
- UDOT
- $2,267,420
- 4/30/26
- SR 177 SR 193 1800 N S-R199(381)
- UDOT
- $111,423,791
- 4/21/26
- I 15 I 80 Concrete Repair Expansion Joints F-I15-7(389)
- UDOT
- $2,363,363
- 4/14/26
- 1300 West 9000 South 7800 South F-2066(4)7
- UDOT
- $5,974,505
- 4/9/26
- US 6 US 89 Grade Separation F-0006(257)
- UDOT
- $24,201,477
- 3/19/26
- Springville 1600 S Phase 3 1200 W SR-51 F-I15-6(276)1
- UDOT
- $13,953,216
- 1/22/26
- I 15 10600 S 9000 S F-I15-7(386)294
- UDOT
- $7,804,175
- 1/8/26
- SR 154 I 15 200 W F-0154(95)1
- UDOT
- $529,858
- 1/6/26