Financial Health & Pipeline Brief
Analyzed On:  Aug 13, 2026
Dry Creek Structures (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
The **$110M** remaining backlog is dominated by the **$104M** on the SR 177 project awarded in April 2026, with initial cash flows supported by mobilization on the May 2026 awards. Shorter-duration projects such as the 90-month I-15 SR 232 (**$1.4M** remaining) will generate near-term revenue. Overall execution should remain stable given the **$123M** in 2026 low bids.

Medium-term Outlook (6-12 months)
Continued progress across the four active projects, including the **$7.8M** I-15 10600 S job, will sustain cash flow through the end of 2027. The upward trend in win rates to 26.7% and **$188M** total bids in 2026 support backlog replenishment. Revenue recognition will remain front-loaded on the large SR 177 contract.

Key Risk Period
The 850-month duration and **$104M** concentration in a single project create elevated exposure to schedule delays and cash flow variability beyond 12 months. Lower historical success rates (19% in 2024) increase the risk of backlog erosion if new awards slow.

Recommendations
Diversify bidding toward shorter-duration projects to reduce concentration risk in the **$111M** SR 177 contract. Maintain bidding volume above **$150M** annually while targeting success rates above 25%. Closely track monthly burn rates on the **$110M** backlog to preserve liquidity.
 
JOBS LOW
  • I 15 SR 232 SR 103 F-I15-7(388)332
  • UDOT
  • 5/14/26
  • 400 East 100 South Pages Lane F-1388(1)4
  • UDOT
  • 5/12/26
  • SR 177 SR 193 1800 N S-R199(381)
  • UDOT
  • 4/21/26
  • I 15 10600 S 9000 S F-I15-7(386)294
  • UDOT
  • 1/8/26
Bidjudge
JOBS BID
  • Lower Provo River Parkway Improvements
  • Utah County
  • $1,443,789
  • 9/9/26
  • US 40 Culvert Replacement MP 29 5 F-0040(235)29
  • UDOT
  • $2,218,145
  • 7/30/26
  • Gentile Street 2400 East 2600 East
  • Layton
  • $3,761,002
  • 6/30/26
  • UTN 3900 4100 South Shared Use Path Phase 1 S-TR02(4)
  • UDOT
  • $4,690,317
  • 6/18/26
  • I 15 SR 232 SR 103 F-I15-7(388)332
  • UDOT
  • $2,144,222
  • 5/14/26
  • Pioneer Road Improvements
  • Draper
  • $1,987,061
  • 5/13/26
  • 400 East 100 South Pages Lane F-1388(1)4
  • UDOT
  • $1,611,873
  • 5/12/26
  • 3600 West 2600 N 1975 N Plain City F-3370(1)0
  • UDOT
  • $3,527,371
  • 5/5/26
  • BFP American Fork City Bridge Replacements 2 F-LC49(203)
  • UDOT
  • $2,267,420
  • 4/30/26
  • SR 177 SR 193 1800 N S-R199(381)
  • UDOT
  • $111,423,791
  • 4/21/26
  • I 15 I 80 Concrete Repair Expansion Joints F-I15-7(389)
  • UDOT
  • $2,363,363
  • 4/14/26
  • 1300 West 9000 South 7800 South F-2066(4)7
  • UDOT
  • $5,974,505
  • 4/9/26
  • US 6 US 89 Grade Separation F-0006(257)
  • UDOT
  • $24,201,477
  • 3/19/26
  • Springville 1600 S Phase 3 1200 W SR-51 F-I15-6(276)1
  • UDOT
  • $13,953,216
  • 1/22/26
  • I 15 10600 S 9000 S F-I15-7(386)294
  • UDOT
  • $7,804,175
  • 1/8/26
  • SR 154 I 15 200 W F-0154(95)1
  • UDOT
  • $529,858
  • 1/6/26
Bidjudge
CASH FLOW
  • SR 154 I 15 200 W F-0154(95)1
  • UDOT
  • $111,423,791
  • 06/20/26
  • 850
  • 18.7%
  • $3,932,604
  • $90,580,988
  • SR 154 I 15 200 W F-0154(95)1
  • UDOT
  • $7,804,175
  • 03/09/26
  • 270
  • 97.0%
  • $867,131
  • $231,235
  • $4,799,735
  • $90,812,223