- Acme Construction - UT
- 2026
- 90
- 12
- 13.33%
- $31,959,325
- 12.96%
- 28.36%
- 11.83%
- $172,233,145

Acme Construction holds a current backlog of **$15M** with multiple 2026-awarded projects such as PCMC Bus Stop Improvements (**$4.1M** remaining) and 1300 West 9000 South (**$4.4M** remaining) driving near-term cash flow. Recent bid volume of **$154M** and **13.6%** success rate support modest revenue continuity over the next six months.
Medium-term Outlook (6-12 months)
The **$25.5M** in 2026 awards provides limited replenishment against long-duration contracts averaging 120+ months, requiring sustained bidding to avoid drawdown. Prior-year success rates of **24.1%** in 2025 indicate capacity to grow backlog if win rates improve.
Key Risk Period
Extended contract terms up to 330 months combined with reduced 2026 bid volume from **$435M** in 2025 create elevated cash flow risk beyond 12 months. The thin **$15M** remaining backlog heightens exposure to project delays or payment timing issues.
Recommendations
Increase bid submissions to restore 2025 volume levels while sharpening estimates to lift success rates above **13.6%**. Prioritize shorter-duration projects to accelerate cash conversion and reduce long-term liquidity strain.
- Provo River Trail Central Improvements Sewer Water Main
- Provo
- 8/24/26
- EMC SR 73 Ranches Pkwy Campus Drive Improvements
- Eagle Mountain
- 7/22/26
- Providence Safe Routes School FY26 F-R199(407)
- UDOT
- 6/23/26
- 3000 East BCC Trail Crosswalk
- Cottonwood Heights
- 5/28/26
- BFP American Fork City Bridge Replacements 2 F-LC49(203)
- UDOT
- 4/30/26
- BFP Midvale City Bridge Replacement 035035F F-2090(1)1
- UDOT
- 4/30/26
- I 15 I 80 Concrete Repair Expansion Joints F-I15-7(389)
- UDOT
- 4/14/26
- PCMC Bus Stop Improvements Phases 2 3 Construction
- Park City
- 4/14/26
- 1300 West 9000 South 7800 South F-2066(4)7
- UDOT
- 4/9/26
- Salt Lake City Airport Taxiway H1 Runway End 34R Rehabilitation
- Salt Lake
- 2/26/26
- SLCo PAR128099 Utah Salt Lake Canal Trail Phase 6 CONST
- Salt Lake County
- 2/18/26
- SR 154 I 15 200 W F-0154(95)1
- UDOT
- 1/6/26
- US 89 Wildlife Crossings Fencing MP 48 56 F-0089(619)48
- UDOT
- $7,982,559
- 9/3/26
- Fruit Heights City Harvey Park Pickleball Courts Construction
- Utah Division Purchasing
- $416,772
- 9/2/26
- Pack Creek Pedestrian Bridge Replacement Channel Restoration
- Moab
- $663,242
- 9/1/26
- City Hall Parking Lot Expansion
- Draper
- $187,532
- 8/31/26
- Provo River Trail Central Improvements Sewer Water Main
- Provo
- $6,434,898
- 8/24/26
- 2027 Concrete
- Orem
- $715,511
- 8/19/26
- UDOT270027CN Region 2 Pioneer Trail Improvements
- UDOT
- $570,761
- 8/12/26
- SR 134 2200 South Improvements F-0134(37)2
- UDOT
- $664,103
- 8/11/26
- American Fork Art Dye Trail F-R399(293)
- UDOT
- $919,870
- 8/6/26
- US 89 State St 1870 N Intersection Lehi F-0089(640)353
- UDOT
- $758,516
- 8/6/26
- Scott Avenue South Sidewalk Improvements
- Millcreek
- $259,205
- 8/5/26
- US 40 Culvert Replacement MP 29 5 F-0040(235)29
- UDOT
- $2,731,922
- 7/30/26
- EMC SR 73 Ranches Pkwy Campus Drive Improvements
- Eagle Mountain
- $1,412,362
- 7/22/26
- SR 68 Widening Pony Pioneer Saratoga Spgs F-0068(164)31
- UDOT
- $992,997
- 7/9/26
- SR 201 4 Structures Preservation F-R299(427)
- UDOT
- $828,690
- 7/9/26
- UTN Jordan River Pkwy Trail Connection 1300 W S-TR02(2)
- UDOT
- $485,962
- 7/9/26
- BFP Carbon County Bridge Replacement 007027C F-LC07(16)
- UDOT
- $2,071,970
- 7/2/26
- Copper Hills Parkway Parkstrip
- West Jordan
- $217,213
- 6/30/26
- Providence Safe Routes School FY24 F-1190(2)3
- UDOT
- $132,049
- 6/23/26
- Providence Safe Routes School FY26 F-R199(407)
- UDOT
- $384,133
- 6/23/26
- NSL Main Street Sidewalk I 15 1001 North F-1384(2)1
- UDOT
- $2,397,340
- 6/18/26
- UTN 3900 4100 South Shared Use Path Phase 1 S-TR02(4)
- UDOT
- $4,714,697
- 6/18/26
- Birch Street Reconstruction
- Clearfield
- $2,330,025
- 6/11/26
- SR 112 600 W S-0112(15)7
- UDOT
- $894,833
- 6/11/26
- Juniper Canyon Recreation Area Phase 3
- Herriman
- $1,681,020
- 6/9/26
- ITB 2026 12 12000 South Road Improvements
- Utah County
- $598,008
- 6/9/26
- 3000 East BCC Trail Crosswalk
- Cottonwood Heights
- $298,166
- 5/28/26
- Ida Cotten Park
- Salt Lake
- $687,415
- 5/27/26
- Pacific Ave Trail Road Improvements
- North Salt Lake
- $428,985
- 5/26/26
- 2026 Providence Dr Rehabilitation
- Saratoga Springs
- $225,897
- 5/26/26
- I 15 SR 232 SR 103 F-I15-7(388)332
- UDOT
- $2,417,357
- 5/14/26
- Pioneer Road Improvements
- Draper
- $2,054,613
- 5/13/26
- 400 East 100 South Pages Lane F-1388(1)4
- UDOT
- $1,994,381
- 5/12/26
- 2200 South Reconstruction
- Clearfield
- $1,049,012
- 5/7/26
- Springville Safe Routes School FY23 F-R399(435)0
- UDOT
- $203,427
- 5/7/26
- SR 224 MP 11 39 Dual Left Turns F-0224(55)11
- UDOT
- $773,821
- 5/7/26
- 3600 West 2600 N 1975 N Plain City F-3370(1)0
- UDOT
- $4,136,006
- 5/5/26
- Adams Avenue Sidewalk 40th Street 42nd Street F-3346(1)1
- UDOT
- $1,438,342
- 5/5/26
- BFP Draper Sandy City Bridge Repl 035057F F-2049(1)1
- UDOT
- $1,191,168
- 4/30/26
- BFP Midvale City Bridge Replacement 035035F F-2090(1)1
- UDOT
- $635,921
- 4/30/26
- BFP Sandy City Bridge Replacements 4 F-R299(495)
- UDOT
- $5,076,902
- 4/30/26
- BFP American Fork City Bridge Replacements 2 F-LC49(203)
- UDOT
- $2,188,106
- 4/30/26
- 2026 10400 N Road Improvement
- Highland
- $486,120
- 4/28/26
- NS26-127 Marriott Slaterville City 1200 W 1700 S Road Widening Reconstruction
- Marriott Slaterville
- $5,601,196
- 4/28/26
- SR 224 Marsac Roundabout SR 248 F-0224(24)5
- UDOT
- $1,450,899
- 4/23/26
- 2600 South Sidewalks 800 West Nibley Elementary School
- Nibley
- $369,171
- 4/23/26
- L Street Reconstruction
- Salt Lake
- $1,629,330
- 4/22/26
- 3000 W Roadway Signal
- Syracuse
- $780,627
- 4/21/26
- 9100 West Sidewalk
- Salt Lake
- $439,909
- 4/17/26
- RDW25038 Local Streets Reconstruction 2026 1
- Salt Lake
- $1,347,301
- 4/15/26
- I 15 I 80 Concrete Repair Expansion Joints F-I15-7(389)
- UDOT
- $1,609,751
- 4/14/26
- PCMC Bus Stop Improvements Phases 2 3 Construction
- Park City
- $8,142,320
- 4/14/26
- 1300 West 9000 South 7800 South F-2066(4)7
- UDOT
- $5,485,992
- 4/9/26
- West 300 South Trail
- Heber
- $468,194
- 4/9/26
- RDW25035 600 South Reconstruction
- Salt Lake
- $1,263,815
- 4/8/26
- 108 West Haven City 5100 W Roadway Widening
- West Haven
- $3,851,716
- 4/8/26
- BFP Wayne County Bridge Replacement F-LC55(3)
- UDOT
- $528,764
- 4/7/26
- Saratoga Road 145 North Widening
- Saratoga Springs
- $12,077,012
- 4/7/26
- 2026 Provo City 1600 W Sidewalk
- Provo
- $173,424
- 4/6/26
- 2026 Street Rebuild Scenic Hills Woodhill Oakwood Oak View
- North Salt Lake
- $769,196
- 3/31/26
- 200 South 300 West Roundabout
- American Fork
- $1,512,823
- 3/30/26
- SSL Fitts Park Improvements
- South Salt Lake
- $750,651
- 3/26/26
- SR 131 Harmon Day Drive SR 140 F-0131(4)1
- UDOT
- $1,858,120
- 3/24/26
- SR 60 Round About Ritter Drive Riverdale F-LC57(45)
- UDOT
- $1,127,060
- 3/19/26
- UDOT I 70 Concrete Panel Replacement Sevier County
- UDOT
- $527,900
- 3/12/26
- SR 132 Improvements MP 38 1 Nebo Loop Rd F-0132(32)38
- UDOT
- $4,387,794
- 3/12/26
- Salt Lake City Airport 2300 West Realignment
- Salt Lake
- $1,076,174
- 3/5/26
- Salt Lake City Airport Taxiway H1 Runway End 34R Rehabilitation
- Salt Lake
- $3,793,073
- 2/26/26
- BFP Cache County Bridge Replacement 005034C F-1274(2)1
- UDOT
- $3,762,276
- 2/24/26
- Vineyard Regional Trail Enhancements F-R399(425)
- UDOT
- $1,062,204
- 2/19/26
- Salt Lake City Airport Terminal Drive Resurfacing
- Salt Lake
- $1,565,272
- 2/19/26
- SLCo PAR128099 Utah Salt Lake Canal Trail Phase 6 CONST
- Salt Lake County
- $1,118,884
- 2/18/26
- Taylorsville Park Phase 3
- Taylorsville
- $2,079,310
- 2/10/26
- City Hall Parking Lot Reconstruction
- West Valley
- $1,233,364
- 2/10/26
- SR 67 Widening S-R199(419)
- UDOT
- $1,124,942
- 2/5/26
- Three Gates Trail HAFB F-R199(399)
- UDOT
- $1,124,942
- 2/5/26
- Payson 100 South Improvements
- Payson UT
- $405,910
- 2/5/26
- RCUT US 91 SR 23 F-0091(109)16
- UDOT
- $4,826,006
- 2/3/26
- Pleasant Grove City Battle Creek Trailhead Parking Lot Improvements
- Pleasant Grove
- $1,179,411
- 1/29/26
- Salt Lake City Airport Economy Lot Pavement Rehabilitation
- Salt Lake
- $476,624
- 1/29/26
- RDW25039 Local Streets Reconstruction 2026 2
- Salt Lake
- $1,194,250
- 1/28/26
- Springville 1600 S Phase 3 1200 W SR-51 F-I15-6(276)1
- UDOT
- $13,847,983
- 1/22/26
- 450 East Widening Project Phase 2
- North Ogden
- $2,113,013
- 1/22/26
- BFP Riverton City Bridge Replacement 035003D F-2035(3)7
- UDOT
- $716,292
- 1/15/26
- 4000 South SRTS Rail Crossing 2550 W 2350 W F-3318(1)0
- UDOT
- $362,124
- 1/13/26
- 980 South Mill Rd Intersection Improvements 2025
- Heber
- $297,099
- 1/13/26
- Mitchell Hollow Trail
- Highland
- $1,998,610
- 1/8/26
- Chimes View Riverdale Rd Country Club Dr F-3354(4)0
- UDOT
- $2,593,691
- 1/8/26
- SR 154 I 15 200 W F-0154(95)1
- UDOT
- $455,719
- 1/6/26
- BFP Weber County Bridge Replacement 057038C F-LC57(53)
- UDOT
- $941,178
- 1/6/26
- Provo River Trail Central Improvements Sewer Water Main
- Provo
- $6,434,898
- 10/23/26
- 120
- 0%
- -
- $6,434,898
- EMC SR 73 Ranches Pkwy Campus Drive Improvements
- Eagle Mountain
- $1,412,362
- 09/20/26
- 120
- 0%
- -
- $1,412,362
- BFP Weber County Bridge Replacement 057038C F-LC57(53)
- UDOT
- $384,133
- 08/22/26
- 90
- 22.2%
- $128,044
- $298,770
- BFP Weber County Bridge Replacement 057038C F-LC57(53)
- Cottonwood Heights
- $298,166
- 07/27/26
- 120
- 38.3%
- $74,542
- $183,869
- BFP Weber County Bridge Replacement 057038C F-LC57(53)
- UDOT
- $2,188,106
- 06/29/26
- 140
- 52.9%
- $468,880
- $1,031,536
- BFP Weber County Bridge Replacement 057038C F-LC57(53)
- UDOT
- $635,921
- 06/29/26
- 140
- 52.9%
- $136,269
- $299,791
- BFP Weber County Bridge Replacement 057038C F-LC57(53)
- UDOT
- $1,609,751
- 06/13/26
- 120
- 75.0%
- $402,438
- $402,438
- BFP Weber County Bridge Replacement 057038C F-LC57(53)
- Park City
- $8,142,320
- 06/13/26
- 120
- 75.0%
- $2,035,580
- $2,035,580
- BFP Weber County Bridge Replacement 057038C F-LC57(53)
- UDOT
- $5,485,992
- 06/08/26
- 330
- 28.8%
- $498,727
- $3,906,691
- BFP Weber County Bridge Replacement 057038C F-LC57(53)
- UDOT
- $3,774,224
- 02/07/26
- 275
- 78.5%
- $411,734
- $809,743
- $4,156,214
- $16,815,678