BidJudge.com - Projects
info@acmeutah.com
170 S 1200 W
North Salt Lake UT
84054
801-280-1232
Health Breakdown
Avg Left
-20
Success
-20
Avg Avg
5
Year Proj
-30
2 Year Prior Proj
75
Qual Based
0
Cash Flow
50
 
60%
60%
Health
Financial Health & Pipeline Brief
Analyzed On:  Aug 13, 2026
Acme Construction - UT (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
Acme Construction holds a current backlog of **$15M** with multiple 2026-awarded projects such as PCMC Bus Stop Improvements (**$4.1M** remaining) and 1300 West 9000 South (**$4.4M** remaining) driving near-term cash flow. Recent bid volume of **$154M** and **13.6%** success rate support modest revenue continuity over the next six months.

Medium-term Outlook (6-12 months)
The **$25.5M** in 2026 awards provides limited replenishment against long-duration contracts averaging 120+ months, requiring sustained bidding to avoid drawdown. Prior-year success rates of **24.1%** in 2025 indicate capacity to grow backlog if win rates improve.

Key Risk Period
Extended contract terms up to 330 months combined with reduced 2026 bid volume from **$435M** in 2025 create elevated cash flow risk beyond 12 months. The thin **$15M** remaining backlog heightens exposure to project delays or payment timing issues.

Recommendations
Increase bid submissions to restore 2025 volume levels while sharpening estimates to lift success rates above **13.6%**. Prioritize shorter-duration projects to accelerate cash conversion and reduce long-term liquidity strain.
 
JOBS LOW
  • Provo River Trail Central Improvements Sewer Water Main
  • Provo
  • 8/24/26
  • EMC SR 73 Ranches Pkwy Campus Drive Improvements
  • Eagle Mountain
  • 7/22/26
  • Providence Safe Routes School FY26 F-R199(407)
  • UDOT
  • 6/23/26
  • 3000 East BCC Trail Crosswalk
  • Cottonwood Heights
  • 5/28/26
  • BFP American Fork City Bridge Replacements 2 F-LC49(203)
  • UDOT
  • 4/30/26
  • BFP Midvale City Bridge Replacement 035035F F-2090(1)1
  • UDOT
  • 4/30/26
  • I 15 I 80 Concrete Repair Expansion Joints F-I15-7(389)
  • UDOT
  • 4/14/26
  • PCMC Bus Stop Improvements Phases 2 3 Construction
  • Park City
  • 4/14/26
  • 1300 West 9000 South 7800 South F-2066(4)7
  • UDOT
  • 4/9/26
  • Salt Lake City Airport Taxiway H1 Runway End 34R Rehabilitation
  • Salt Lake
  • 2/26/26
  • SLCo PAR128099 Utah Salt Lake Canal Trail Phase 6 CONST
  • Salt Lake County
  • 2/18/26
  • SR 154 I 15 200 W F-0154(95)1
  • UDOT
  • 1/6/26
Bidjudge
JOBS BID
  • Lampton Road Waterway Removal 2026-032
  • South Jordan
  • $277,599
  • 11/19/26
  • Public Way Concrete Replacement 2027 RDW26075
  • Salt Lake
  • $870,115
  • 11/18/26
  • I-15 7200 S 5300 S F-I15-7(392)298
  • UDOT
  • $9,940,432
  • 11/17/26
  • I-80 Surplus Canal to I-15 F-I80-3(221)117
  • UDOT
  • $7,851,739
  • 11/10/26
  • West Haven 1800 S 2100 S Utility and Sidewalk Improvements RA27-133
  • West Haven
  • $1,155,415
  • 11/10/26
  • SR-87 Box Culvert Replacement S-0087(16)38
  • UDOT
  • $1,152,315
  • 11/5/26
  • BFP Taylorsville City Bridge Replacement 035218F F-LC35(338)
  • UDOT
  • $940,879
  • 11/3/26
  • SR-77 400 S 950 W Intersection Springville F-0077(22)8
  • UDOT
  • $753,106
  • 10/22/26
  • SR-77 Spanish Fork Main St US-89 Springville F-0077(23)7
  • UDOT
  • $1,354,527
  • 10/22/26
  • US-40 189 Mill Road S-0040(210)18
  • UDOT
  • $12,978,006
  • 10/20/26
  • Foothill-Canyon SD Phase 1 Crossing University Ave
  • Provo
  • $411,317
  • 10/14/26
  • Sr-39 I-15 Us-89 F-0039(59)4
  • UDOT
  • $4,607,797
  • 10/6/26
  • Kays Creek Trail Overpass Layton FrontRunner F-R199(350)
  • UDOT
  • $9,950,781
  • 10/6/26
  • SR-114 Queue Cutters Presignals F-0114(32)6
  • UDOT
  • $927,067
  • 10/1/26
  • SR-126 250 N Marriott-Slaterville F-0126(56)15
  • UDOT
  • $1,285,042
  • 10/1/26
  • US 89 3000 South To SR-91 F-0089(651)431
  • UDOT
  • $2,254,470
  • 9/29/26
  • Mapleton ADA Ramps 2026
  • Mapleton
  • $126,750
  • 9/24/26
  • Provo Safe Routes To School Fy24 Fy26 F-R399(496)
  • UDOT
  • $378,607
  • 9/24/26
  • Riverton Frontage Improvement 1776 W 11800 S CC26-473
  • Riverton
  • $134,849
  • 9/24/26
  • Draper CIP 21-18 2026-2027 Zone 5 Sidewalk Repair
  • Draper
  • $647,050
  • 9/22/26
  • US 6 Improve Ints Consumers Rd Carbonville Rd F-0006(267)235
  • UDOT
  • $4,542,870
  • 9/15/26
  • Harrisville City Complex Roadway 1750 N F-R199(403)
  • UDOT
  • $945,085
  • 9/15/26
  • US 89 Wildlife Crossings Fencing MP 48 56 F-0089(619)48
  • UDOT
  • $7,982,559
  • 9/3/26
  • Fruit Heights City Harvey Park Pickleball Courts Construction
  • Utah Division Purchasing
  • $416,772
  • 9/2/26
  • Pack Creek Pedestrian Bridge Replacement Channel Restoration
  • Moab
  • $663,242
  • 9/1/26
  • Richfield City 100 E Bridge Replacement 041055A F-499(465)
  • UDOT
  • $531,287
  • 9/1/26
  • City Hall Parking Lot Expansion
  • Draper
  • $187,532
  • 8/31/26
  • Provo River Trail Central Improvements Sewer Water Main
  • Provo
  • $6,434,898
  • 8/24/26
  • 2027 Concrete
  • Orem
  • $715,511
  • 8/19/26
  • UDOT270027CN Region 2 Pioneer Trail Improvements
  • UDOT
  • $570,761
  • 8/12/26
  • SR 134 2200 South Improvements F-0134(37)2
  • UDOT
  • $664,103
  • 8/11/26
  • US 89 State St 1870 N Intersection Lehi F-0089(640)353
  • UDOT
  • $758,516
  • 8/6/26
  • American Fork Art Dye Trail F-R399(293)
  • UDOT
  • $919,870
  • 8/6/26
  • Scott Avenue South Sidewalk Improvements
  • Millcreek
  • $259,205
  • 8/5/26
  • US 40 Culvert Replacement MP 29 5 F-0040(235)29
  • UDOT
  • $2,731,922
  • 7/30/26
  • EMC SR 73 Ranches Pkwy Campus Drive Improvements
  • Eagle Mountain
  • $1,412,362
  • 7/22/26
  • UTN Jordan River Pkwy Trail Connection 1300 W S-TR02(2)
  • UDOT
  • $485,962
  • 7/9/26
  • SR 201 4 Structures Preservation F-R299(427)
  • UDOT
  • $828,690
  • 7/9/26
  • SR 68 Widening Pony Pioneer Saratoga Spgs F-0068(164)31
  • UDOT
  • $992,997
  • 7/9/26
  • BFP Carbon County Bridge Replacement 007027C F-LC07(16)
  • UDOT
  • $2,071,970
  • 7/2/26
  • Copper Hills Parkway Parkstrip
  • West Jordan
  • $217,213
  • 6/30/26
  • Providence Safe Routes School FY26 F-R199(407)
  • UDOT
  • $384,133
  • 6/23/26
  • Providence Safe Routes School FY24 F-1190(2)3
  • UDOT
  • $132,049
  • 6/23/26
  • UTN 3900 4100 South Shared Use Path Phase 1 S-TR02(4)
  • UDOT
  • $4,714,697
  • 6/18/26
  • NSL Main Street Sidewalk I 15 1001 North F-1384(2)1
  • UDOT
  • $2,397,340
  • 6/18/26
  • SR 112 600 W S-0112(15)7
  • UDOT
  • $894,833
  • 6/11/26
  • Birch Street Reconstruction
  • Clearfield
  • $2,330,025
  • 6/11/26
  • ITB 2026 12 12000 South Road Improvements
  • Utah County
  • $598,008
  • 6/9/26
  • Juniper Canyon Recreation Area Phase 3
  • Herriman
  • $1,681,020
  • 6/9/26
  • 3000 East BCC Trail Crosswalk
  • Cottonwood Heights
  • $298,166
  • 5/28/26
  • Ida Cotten Park
  • Salt Lake
  • $687,415
  • 5/27/26
  • Pacific Ave Trail Road Improvements
  • North Salt Lake
  • $428,985
  • 5/26/26
  • 2026 Providence Dr Rehabilitation
  • Saratoga Springs
  • $225,897
  • 5/26/26
  • I 15 SR 232 SR 103 F-I15-7(388)332
  • UDOT
  • $2,417,357
  • 5/14/26
  • Pioneer Road Improvements
  • Draper
  • $2,054,613
  • 5/13/26
  • 400 East 100 South Pages Lane F-1388(1)4
  • UDOT
  • $1,994,381
  • 5/12/26
  • SR 224 MP 11 39 Dual Left Turns F-0224(55)11
  • UDOT
  • $773,821
  • 5/7/26
  • Springville Safe Routes School FY23 F-R399(435)0
  • UDOT
  • $203,427
  • 5/7/26
  • 2200 South Reconstruction
  • Clearfield
  • $1,049,012
  • 5/7/26
  • Adams Avenue Sidewalk 40th Street 42nd Street F-3346(1)1
  • UDOT
  • $1,438,342
  • 5/5/26
  • 3600 West 2600 N 1975 N Plain City F-3370(1)0
  • UDOT
  • $4,136,006
  • 5/5/26
  • BFP Sandy City Bridge Replacements 4 F-R299(495)
  • UDOT
  • $5,076,902
  • 4/30/26
  • BFP American Fork City Bridge Replacements 2 F-LC49(203)
  • UDOT
  • $2,188,106
  • 4/30/26
  • BFP Midvale City Bridge Replacement 035035F F-2090(1)1
  • UDOT
  • $635,921
  • 4/30/26
  • BFP Draper Sandy City Bridge Repl 035057F F-2049(1)1
  • UDOT
  • $1,191,168
  • 4/30/26
  • 2026 10400 N Road Improvement
  • Highland
  • $486,120
  • 4/28/26
  • NS26-127 Marriott Slaterville City 1200 W 1700 S Road Widening Reconstruction
  • Marriott Slaterville
  • $5,601,196
  • 4/28/26
  • 2600 South Sidewalks 800 West Nibley Elementary School
  • Nibley
  • $369,171
  • 4/23/26
  • SR 224 Marsac Roundabout SR 248 F-0224(24)5
  • UDOT
  • $1,450,899
  • 4/23/26
  • L Street Reconstruction
  • Salt Lake
  • $1,629,330
  • 4/22/26
  • 3000 W Roadway Signal
  • Syracuse
  • $780,627
  • 4/21/26
  • 9100 West Sidewalk
  • Salt Lake
  • $439,909
  • 4/17/26
  • RDW25038 Local Streets Reconstruction 2026 1
  • Salt Lake
  • $1,347,301
  • 4/15/26
  • I 15 I 80 Concrete Repair Expansion Joints F-I15-7(389)
  • UDOT
  • $1,609,751
  • 4/14/26
  • PCMC Bus Stop Improvements Phases 2 3 Construction
  • Park City
  • $8,142,320
  • 4/14/26
  • 1300 West 9000 South 7800 South F-2066(4)7
  • UDOT
  • $5,485,992
  • 4/9/26
  • West 300 South Trail
  • Heber
  • $468,194
  • 4/9/26
  • 108 West Haven City 5100 W Roadway Widening
  • West Haven
  • $3,851,716
  • 4/8/26
  • RDW25035 600 South Reconstruction
  • Salt Lake
  • $1,263,815
  • 4/8/26
  • BFP Wayne County Bridge Replacement F-LC55(3)
  • UDOT
  • $528,764
  • 4/7/26
  • Saratoga Road 145 North Widening
  • Saratoga Springs
  • $12,077,012
  • 4/7/26
  • 2026 Provo City 1600 W Sidewalk
  • Provo
  • $173,424
  • 4/6/26
  • 2026 Street Rebuild Scenic Hills Woodhill Oakwood Oak View
  • North Salt Lake
  • $769,196
  • 3/31/26
  • 200 South 300 West Roundabout
  • American Fork
  • $1,512,823
  • 3/30/26
  • SSL Fitts Park Improvements
  • South Salt Lake
  • $750,651
  • 3/26/26
  • SR 131 Harmon Day Drive SR 140 F-0131(4)1
  • UDOT
  • $1,858,120
  • 3/24/26
  • SR 60 Round About Ritter Drive Riverdale F-LC57(45)
  • UDOT
  • $1,127,060
  • 3/19/26
  • UDOT I 70 Concrete Panel Replacement Sevier County
  • UDOT
  • $527,900
  • 3/12/26
  • SR 132 Improvements MP 38 1 Nebo Loop Rd F-0132(32)38
  • UDOT
  • $4,387,794
  • 3/12/26
  • Salt Lake City Airport 2300 West Realignment
  • Salt Lake
  • $1,076,174
  • 3/5/26
  • Salt Lake City Airport Taxiway H1 Runway End 34R Rehabilitation
  • Salt Lake
  • $3,793,073
  • 2/26/26
  • BFP Cache County Bridge Replacement 005034C F-1274(2)1
  • UDOT
  • $3,762,276
  • 2/24/26
  • Vineyard Regional Trail Enhancements F-R399(425)
  • UDOT
  • $1,062,204
  • 2/19/26
  • Salt Lake City Airport Terminal Drive Resurfacing
  • Salt Lake
  • $1,565,272
  • 2/19/26
  • SLCo PAR128099 Utah Salt Lake Canal Trail Phase 6 CONST
  • Salt Lake County
  • $1,118,884
  • 2/18/26
  • Taylorsville Park Phase 3
  • Taylorsville
  • $2,079,310
  • 2/10/26
  • City Hall Parking Lot Reconstruction
  • West Valley
  • $1,233,364
  • 2/10/26
  • SR 67 Widening S-R199(419)
  • UDOT
  • $1,124,942
  • 2/5/26
  • Three Gates Trail HAFB F-R199(399)
  • UDOT
  • $1,124,942
  • 2/5/26
  • Payson 100 South Improvements
  • Payson UT
  • $405,910
  • 2/5/26
  • RCUT US 91 SR 23 F-0091(109)16
  • UDOT
  • $4,826,006
  • 2/3/26
  • Pleasant Grove City Battle Creek Trailhead Parking Lot Improvements
  • Pleasant Grove
  • $1,179,411
  • 1/29/26
  • Salt Lake City Airport Economy Lot Pavement Rehabilitation
  • Salt Lake
  • $476,624
  • 1/29/26
  • RDW25039 Local Streets Reconstruction 2026 2
  • Salt Lake
  • $1,194,250
  • 1/28/26
  • 450 East Widening Project Phase 2
  • North Ogden
  • $2,113,013
  • 1/22/26
  • Springville 1600 S Phase 3 1200 W SR-51 F-I15-6(276)1
  • UDOT
  • $13,847,983
  • 1/22/26
  • BFP Riverton City Bridge Replacement 035003D F-2035(3)7
  • UDOT
  • $716,292
  • 1/15/26
  • 4000 South SRTS Rail Crossing 2550 W 2350 W F-3318(1)0
  • UDOT
  • $362,124
  • 1/13/26
  • 980 South Mill Rd Intersection Improvements 2025
  • Heber
  • $297,099
  • 1/13/26
  • Mitchell Hollow Trail
  • Highland
  • $1,998,610
  • 1/8/26
  • Chimes View Riverdale Rd Country Club Dr F-3354(4)0
  • UDOT
  • $2,593,691
  • 1/8/26
  • BFP Weber County Bridge Replacement 057038C F-LC57(53)
  • UDOT
  • $941,178
  • 1/6/26
  • SR 154 I 15 200 W F-0154(95)1
  • UDOT
  • $455,719
  • 1/6/26
Bidjudge
CASH FLOW
  • SR 154 I 15 200 W F-0154(95)1
  • Provo
  • $6,434,898
  • 10/23/26
  • 120
  • 25.0%
  • $1,608,725
  • $4,826,174
  • SR 154 I 15 200 W F-0154(95)1
  • Eagle Mountain
  • $1,412,362
  • 09/20/26
  • 120
  • 52.5%
  • $353,091
  • $670,872
  • SR 154 I 15 200 W F-0154(95)1
  • Cottonwood Heights
  • $298,166
  • 07/27/26
  • 120
  • 98.3%
  • $74,542
  • $4,969
  • SR 154 I 15 200 W F-0154(95)1
  • UDOT
  • $5,485,992
  • 06/08/26
  • 330
  • 50.6%
  • $498,727
  • $2,709,748
  • $2,535,085
  • $8,211,763
Bidjudge