- Stapp Construction
- 2026
- 92
- 13
- 14.13%
- $27,702,617
- 4.62%
- 28.20%
- 11.27%
- $140,840,858

Recent 2026 awards including **$4.8M** BFP Sandy City and **$4.4M** UTN Shared Use Path projects leave **$14.1M** total backlog with most value still remaining. These contracts will drive initial mobilization and progress billings through year-end. Cash flow should stabilize as the four largest active projects advance from early stages.
Medium-term Outlook (6-12 months)
Execution of the **$14.1M** backlog across eight active contracts supports revenue recognition into 2027, aided by 12% success rate on **$120M** annual bid volume. Continued bidding at 75 jobs per year positions the firm to replenish backlog as shorter-duration work completes.
Key Risk Period
The 8-12% success rates in 2025-2026 combined with 5.46% average left on low bids create pressure on overhead recovery if new awards slow. Extended contract durations on the largest projects also defer substantial cash inflows beyond the next six months.
Recommendations
Prioritize bids that improve margin retention above the current 3.5-5.5% range and accelerate closeout on the four smallest active projects to boost near-term liquidity. Maintain bidding discipline at current volume while targeting at least two additional wins quarterly to sustain the **$14.1M** backlog.
- State Street 300 South 200 North F-1546(2)7
- UDOT
- 9/10/26
- Lower Provo River Parkway Improvements
- Utah County
- 9/9/26
- US 89 Wildlife Crossings Fencing MP 48 56 F-0089(619)48
- UDOT
- 9/3/26
- American Fork Art Dye Trail F-R399(293)
- UDOT
- 8/6/26
- BFP Carbon County Bridge Replacement 007027C F-LC07(16)
- UDOT
- 7/2/26
- UTN 3900 4100 South Shared Use Path Phase 1 S-TR02(4)
- UDOT
- 6/18/26
- NSL Main Street Sidewalk I 15 1001 North F-1384(2)1
- UDOT
- 6/18/26
- Staker Way Drainage Improvements 2700 E De Ville Drive Roadway Improvements
- Cottonwood Heights
- 5/21/26
- SR 224 MP 11 39 Dual Left Turns F-0224(55)11
- UDOT
- 5/7/26
- BFP Sandy City Bridge Replacements 4 F-R299(495)
- UDOT
- 4/30/26
- BFP Draper Sandy City Bridge Repl 035057F F-2049(1)1
- UDOT
- 4/30/26
- I 15 215 SR 154 186 201 85 WWD Ramp Upgrades F-R299(512)
- UDOT
- 2/12/26
- BFP Weber County Bridge Replacement 057038C F-LC57(53)
- UDOT
- 1/6/26
- State Street 300 South 200 North F-1546(2)7
- UDOT
- $1,465,401
- 9/10/26
- Lower Provo River Parkway Improvements
- Utah County
- $1,249,610
- 9/9/26
- Jefferson Sidewalks FY27
- Ogden
- $485,035
- 9/4/26
- US 89 Wildlife Crossings Fencing MP 48 56 F-0089(619)48
- UDOT
- $6,544,859
- 9/3/26
- Richfield City 100 E Bridge Replacement 041055A F-499(465)
- UDOT
- $599,280
- 9/1/26
- Pack Creek Pedestrian Bridge Replacement Channel Restoration
- Moab
- $647,382
- 9/1/26
- Mt Ogden Park Storm
- Ogden
- $433,019
- 8/27/26
- 1200 West Storm Drain Roadway Fill
- Tooele
- $505,205
- 8/27/26
- SR 198 Spanish Fork Main US 6 F-0198(46)12
- UDOT
- $3,659,576
- 8/20/26
- 2504 025 Sevier County Bike Path Bridges
- Sevier County
- $532,542
- 8/20/26
- 2026 Slate Canyon Storm Drain Improvements
- Provo
- $924,495
- 8/20/26
- 2027 Concrete
- Orem
- $675,127
- 8/19/26
- Center Park Dr 6200 S Trail Construction
- West Jordan
- $283,600
- 8/18/26
- SR 134 2200 South Improvements F-0134(37)2
- UDOT
- $659,875
- 8/11/26
- American Fork Art Dye Trail F-R399(293)
- UDOT
- $734,795
- 8/6/26
- US 89 State St 1870 N Intersection Lehi F-0089(640)353
- UDOT
- $732,340
- 8/6/26
- Scott Avenue South Sidewalk Improvements
- Millcreek
- $247,510
- 8/5/26
- US 40 Culvert Replacement MP 29 5 F-0040(235)29
- UDOT
- $2,299,967
- 7/30/26
- Road Improvement 2026
- Independence
- $267,177
- 7/23/26
- NS26 160 Huntsville Town Water Transmission Line Replacement
- Huntsville UT
- $729,197
- 7/15/26
- UTN Jordan River Pkwy Trail Connection 1300 W S-TR02(2)
- UDOT
- $451,067
- 7/9/26
- SR 68 Widening Pony Pioneer Saratoga Spgs F-0068(164)31
- UDOT
- $890,492
- 7/9/26
- SR 201 4 Structures Preservation F-R299(427)
- UDOT
- $687,999
- 7/9/26
- 400 West Maintenance Partial Reconstruction F-2549(2)1
- UDOT
- $1,397,413
- 7/7/26
- US 89 Passing Lanes Near Hatch S-0089(571)117
- UDOT
- $10,494,096
- 7/7/26
- BFP Carbon County Bridge Replacement 007027C F-LC07(16)
- UDOT
- $1,568,381
- 7/2/26
- 300 West Reconstruction Riverdale Rd Northern City Limits
- Riverdale
- $930,950
- 7/2/26
- Copper Hills Parkway Parkstrip
- West Jordan
- $184,740
- 6/30/26
- NSL Main Street Sidewalk I 15 1001 North F-1384(2)1
- UDOT
- $2,194,135
- 6/18/26
- UTN 3900 4100 South Shared Use Path Phase 1 S-TR02(4)
- UDOT
- $4,379,753
- 6/18/26
- Apple Street Water Line Replacement
- Grantsville
- $504,092
- 6/17/26
- Birch Street Reconstruction
- Clearfield
- $2,453,215
- 6/11/26
- SR 112 600 W S-0112(15)7
- UDOT
- $871,096
- 6/11/26
- Juniper Canyon Recreation Area Phase 3
- Herriman
- $1,761,774
- 6/9/26
- US 89 Barrier Upgrades S-R399(499)
- UDOT
- $718,104
- 6/4/26
- NS26 145 500 West Reservoir Abandonment New Waterline
- Pleasant View
- $715,087
- 6/3/26
- NS26 136 Ballard City 1000 South Connector
- Ballard
- $3,977,966
- 6/1/26
- 3000 East BCC Trail Crosswalk
- Cottonwood Heights
- $357,066
- 5/28/26
- Suncrest Drive Transmission Line Improvements
- Draper
- $1,389,940
- 5/28/26
- Gary Way Water Line Replacement Street Rebuild
- North Salt Lake
- $241,435
- 5/26/26
- Pacific Ave Trail Road Improvements
- North Salt Lake
- $365,154
- 5/26/26
- Staker Way Drainage Improvements 2700 E De Ville Drive Roadway Improvements
- Cottonwood Heights
- $259,786
- 5/21/26
- Seventh Street Storm Drain Improvements 500 North Birch
- Tooele
- $1,215,382
- 5/14/26
- I 15 SR 232 SR 103 F-I15-7(388)332
- UDOT
- $2,238,627
- 5/14/26
- 2026 Overlay
- Sandy
- $999,817
- 5/13/26
- 400 East 100 South Pages Lane F-1388(1)4
- UDOT
- $1,997,484
- 5/12/26
- SR 224 MP 11 39 Dual Left Turns F-0224(55)11
- UDOT
- $614,869
- 5/7/26
- 3600 West 2600 N 1975 N Plain City F-3370(1)0
- UDOT
- $3,144,314
- 5/5/26
- Adams Avenue Sidewalk 40th Street 42nd Street F-3346(1)1
- UDOT
- $1,346,177
- 5/5/26
- BFP Sandy City Bridge Replacements 4 F-R299(495)
- UDOT
- $4,827,680
- 4/30/26
- BFP Draper Sandy City Bridge Repl 035057F F-2049(1)1
- UDOT
- $1,075,711
- 4/30/26
- BFP Midvale City Bridge Replacement 035035F F-2090(1)1
- UDOT
- $934,298
- 4/30/26
- BFP American Fork City Bridge Replacements 2 F-LC49(203)
- UDOT
- $2,259,408
- 4/30/26
- 2026 10400 N Road Improvement
- Highland
- $503,404
- 4/28/26
- 2026 ADA Ramps
- West Jordan
- $746,097
- 4/21/26
- RDW25038 Local Streets Reconstruction 2026 1
- Salt Lake
- $1,577,298
- 4/15/26
- I 15 I 80 Concrete Repair Expansion Joints F-I15-7(389)
- UDOT
- $1,659,881
- 4/14/26
- West 300 South Trail
- Heber
- $657,471
- 4/9/26
- 1300 West 9000 South 7800 South F-2066(4)7
- UDOT
- $5,580,304
- 4/9/26
- RDW25035 600 South Reconstruction
- Salt Lake
- $1,157,343
- 4/8/26
- 108 West Haven City 5100 W Roadway Widening
- West Haven
- $3,481,886
- 4/8/26
- BFP Wayne County Bridge Replacement F-LC55(3)
- UDOT
- $468,463
- 4/7/26
- 200 West Waterline Replacement 100 South Vine Street
- Tooele
- $417,670
- 4/7/26
- BFP Garfield County Bridge Replacements 3 F-R499(481)0
- UDOT
- $4,786,497
- 3/31/26
- Compton Waterline Replacement Phase 1
- Farmington - UT
- $436,370
- 3/26/26
- 2026 Sewer Replacement
- Orem
- $2,273,771
- 3/26/26
- WU015 Jefferson 33rd 36th St WTR
- Ogden
- $2,249,645
- 3/26/26
- SR 131 Harmon Day Drive SR 140 F-0131(4)1
- UDOT
- $1,775,090
- 3/24/26
- SR 60 Round About Ritter Drive Riverdale F-LC57(45)
- UDOT
- $1,174,403
- 3/19/26
- FY2026 Road Rehabilitation 100West 100 N 700 N Utility Phase 1
- American Fork
- $3,188,854
- 3/19/26
- 2026 Street Reconstruction
- Bountiful
- $1,095,028
- 3/17/26
- Salina Safe Routes School FY24 F-0050(36)159
- UDOT
- $316,541
- 3/10/26
- 2026 1700 S Utility
- Orem
- $4,388,246
- 3/5/26
- Salt Lake City Airport 2300 West Realignment
- Salt Lake
- $906,378
- 3/5/26
- CDBG ADA Ramp Replacement
- Taylorsville
- $132,561
- 3/3/26
- Vineyard Regional Trail Enhancements F-R399(425)
- UDOT
- $1,061,167
- 2/19/26
- SU010 Detention 1100 N Storm
- Ogden
- $1,287,428
- 2/19/26
- I 15 215 SR 154 186 201 85 WWD Ramp Upgrades F-R299(512)
- UDOT
- $1,862,332
- 2/12/26
- 2026 Replacement New Construction Sidewalk Curb Gutter Storm Drain Facilities Random Locations
- Bountiful
- $1,141,735
- 2/10/26
- City Hall Parking Lot Reconstruction
- West Valley
- $1,305,215
- 2/10/26
- Three Gates Trail HAFB F-R199(399)
- UDOT
- $1,644,796
- 2/5/26
- I 80 84 WWD Ramp Upgrades F-R299(513)
- UDOT
- $1,091,360
- 2/5/26
- SR 67 Widening S-R199(419)
- UDOT
- $1,644,796
- 2/5/26
- Pleasant Grove City 800 North Area Waterline Drainage Roadway Reconstruction
- Pleasant Grove
- $4,391,032
- 2/3/26
- Syracuse City SR 193 2500 West Intersection
- Syracuse
- $922,209
- 1/22/26
- WU015 4275 S Water Main Replacement
- Ogden
- $563,390
- 1/21/26
- BFP Riverton City Bridge Replacement 035003D F-2035(3)7
- UDOT
- $759,768
- 1/15/26
- 980 South Mill Rd Intersection Improvements 2025
- Heber
- $265,857
- 1/13/26
- 4000 South SRTS Rail Crossing 2550 W 2350 W F-3318(1)0
- UDOT
- $283,423
- 1/13/26
- Var Interchanges R4 WWD Signing Marking F-R499(513)
- UDOT
- $1,044,347
- 1/8/26
- BFP Weber County Bridge Replacement 057038C F-LC57(53)
- UDOT
- $925,305
- 1/6/26
- SR 154 I 15 200 W F-0154(95)1
- UDOT
- $549,997
- 1/6/26
- State Street 300 South 200 North F-1546(2)7
- UDOT
- $1,465,401
- 11/09/26
- 50
- 0%
- -
- $1,465,401
- Lower Provo River Parkway Improvements
- Utah County
- $1,249,610
- 11/08/26
- 120
- 0%
- -
- $1,249,610
- US 89 Wildlife Crossings Fencing MP 48 56 F-0089(619)48
- UDOT
- $6,544,859
- 11/02/26
- 440
- 0%
- -
- $6,544,859
- American Fork Art Dye Trail F-R399(293)
- UDOT
- $734,795
- 10/05/26
- 80
- 0%
- -
- $734,795
- SR 154 I 15 200 W F-0154(95)1
- UDOT
- $1,568,381
- 08/31/26
- 169
- 16.6%
- $278,411
- $1,308,531
- SR 154 I 15 200 W F-0154(95)1
- UDOT
- $2,194,135
- 08/17/26
- 120
- 35.0%
- $548,534
- $1,426,188
- SR 154 I 15 200 W F-0154(95)1
- UDOT
- $4,379,753
- 08/17/26
- 220
- 19.1%
- $597,239
- $3,543,618
- SR 154 I 15 200 W F-0154(95)1
- Cottonwood Heights
- $259,786
- 07/20/26
- 120
- 58.3%
- $64,947
- $108,244
- SR 154 I 15 200 W F-0154(95)1
- UDOT
- $614,869
- 07/06/26
- 110
- 76.4%
- $167,692
- $145,333
- SR 154 I 15 200 W F-0154(95)1
- UDOT
- $1,075,711
- 06/29/26
- 180
- 50.6%
- $179,285
- $531,879
- SR 154 I 15 200 W F-0154(95)1
- UDOT
- $4,827,680
- 06/29/26
- 300
- 30.3%
- $482,768
- $3,363,284
- $2,318,876
- $20,421,742