- Compass Engineering Construction - NM
- 2026
- 2
- 1
- 50.00%
- $6,303,397
- 18.11%
- 0.00%
- 18.99%
- $7,653,979

With a total remaining backlog of **$0**, Compass Engineering faces immediate cash flow pressure and potential revenue gaps absent new project starts. The single 2026 win of **$6,303,397** at a 50% success rate provides limited near-term visibility and requires rapid conversion to active work.
Medium-term Outlook (6-12 months)
Bidding results from 2025 demonstrate stronger momentum with a 71.4% success rate and **$9,990,297** in awards, offering a pathway to rebuild backlog if volumes are sustained. Lower activity in 2024 and 2026, however, constrains pipeline depth and delays revenue stability beyond six months.
Key Risk Period
The next 3-6 months represent the primary risk window due to the **$0** backlog, where failure to secure additional awards could trigger cash flow shortfalls before 2025-level bidding trends take effect.
Recommendations
Increase bid submissions to match or exceed 2025 volumes while targeting improved win rates above 50%. Closely manage working capital to bridge the current zero-backlog period until new projects mobilize.

