BidJudge.com - Projects
1370 Bisti Hwy
Farmington NM
87401
505-324-3900
Health Breakdown
Avg Left
-20
Success
50
Avg Avg
0
Year Proj
2 Year Prior Proj
-30
Qual Based
0
Cash Flow
50
 
50%
50%
Health
Financial Health & Pipeline Brief
Analyzed On:  Jun 26, 2026
Four Corners Oldcastle SW Group - NM (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
The **$103M** backlog provides stable execution runway, anchored by recent 2026 awards including the **$393K** WWTP Compost Pad and **$114K** McKinley projects. Cash flow will depend on progress billings from active long-duration contracts, with minimal near-term disruption expected from the two low bids secured this year.

Medium-term Outlook (6-12 months)
Execution of the **$103M** backlog continues to support operations through multiple 120-month projects, though the 0% success rate in 2025 bidding signals limited pipeline replenishment. Revenue stability hinges on maintaining billings from the **$57M** San Juan contract and similar legacy work.

Key Risk Period
Extended contract durations of 120–200 months create prolonged cash flow strain from retention, mobilization, and slow recognition, with exposure peaking once current backlog burns off without new wins. The low 2025 bidding success rate amplifies this risk if no additional awards materialize by late 2026.

Recommendations
Target improved win rates above 50% through focused bidding on mid-sized opportunities. Accelerate billing cycles on the **$57M** San Juan and other active projects to optimize near-term liquidity. Strengthen prequalification processes to reduce exposure from extended-duration contracts.
 
JOBS LOW
  • 6101980 McKinley
  • NMDOT
  • 6/18/26
  • Rehabilitate Runway 7 25 Rehabilitate Runway 7 25 Lights
  • Farmington
  • 5/12/26
  • WWTP Compost Pad Expansion
  • Farmington
  • 3/3/26
Bidjudge
JOBS BID
  • 6101980 McKinley
  • NMDOT
  • $114,039
  • 6/18/26
  • Rehabilitate Runway 7 25 Rehabilitate Runway 7 25 Lights
  • Farmington
  • $3,780,970
  • 5/12/26
  • 5101175 San Juan
  • NMDOT
  • $34,136,509
  • 4/17/26
  • WWTP Compost Pad Expansion
  • Farmington
  • $392,558
  • 3/3/26
Bidjudge
CASH FLOW
  • WWTP Compost Pad Expansion
  • Farmington
  • $3,780,970
  • 07/11/26
  • 120
  • 6.7%
  • $945,243
  • $3,528,905
  • WWTP Compost Pad Expansion
  • Farmington
  • $392,558
  • 05/02/26
  • 120
  • 65.0%
  • $98,140
  • $137,395
  • $1,043,383
  • $3,780,339
Bidjudge