- TRC Construction - NM
- 2026
- 4
- 2
- 50.00%
- $890,927
- 16.05%
- 25.05%
- 17.90%
- $1,869,627

With a total remaining backlog of **$0**, TRC Construction faces immediate revenue shortfalls despite securing **$890,927** in 2026 low bids at a 50% success rate. Cash flow stability hinges on rapid mobilization of these recent wins to offset completed prior work.
Medium-term Outlook (6-12 months)
Bid volumes have contracted sharply from **$16,082,777** in 2024 to **$1,869,627** in 2026, though win rates rose to 50% from 16.7%. Rebuilding backlog will require scaling submissions while preserving the improved conversion efficiency seen in 2026.
Key Risk Period
The transition after exhausting 2024's **$7,591,577** in low bids represents the peak risk window, given the current **$0** backlog and sustained decline in total bids across 2025-2026.
Recommendations
Prioritize higher-volume bidding on projects with margins below the 16.05% average left on low to accelerate backlog recovery and stabilize cash flow within the next two quarters.



