BidJudge.com - Projects
info@trc-construction.com
789 NM Highway 516
Flora Vista NM
87415
505-334-8220
Health Breakdown
Avg Left
-20
Success
50
Avg Avg
0
Year Proj
-5
2 Year Prior Proj
75
Qual Based
0
Cash Flow
25
 
125%
100%
Health
Financial Health & Pipeline Brief
Analyzed On:  Aug 12, 2026
TRC Construction - NM (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
With a total remaining backlog of **$0**, TRC Construction faces immediate revenue shortfalls despite securing **$890,927** in 2026 low bids at a 50% success rate. Cash flow stability hinges on rapid mobilization of these recent wins to offset completed prior work.

Medium-term Outlook (6-12 months)
Bid volumes have contracted sharply from **$16,082,777** in 2024 to **$1,869,627** in 2026, though win rates rose to 50% from 16.7%. Rebuilding backlog will require scaling submissions while preserving the improved conversion efficiency seen in 2026.

Key Risk Period
The transition after exhausting 2024's **$7,591,577** in low bids represents the peak risk window, given the current **$0** backlog and sustained decline in total bids across 2025-2026.

Recommendations
Prioritize higher-volume bidding on projects with margins below the 16.05% average left on low to accelerate backlog recovery and stabilize cash flow within the next two quarters.
 
JOBS LOW
  • Summit Dr Waterline Replacement
  • Farmington
  • 2/11/26
  • N Dustin 8 Waterline Replacement 30th St 35th St
  • Farmington
  • 2/11/26
Bidjudge
JOBS BID
  • Riverview Ave Waterline Stormline Extensions
  • Aztec
  • $256,435
  • 7/6/26
  • WWTP Compost Pad Expansion
  • Farmington
  • $722,265
  • 3/3/26
  • Summit Dr Waterline Replacement
  • Farmington
  • $476,467
  • 2/11/26
  • N Dustin 8 Waterline Replacement 30th St 35th St
  • Farmington
  • $414,460
  • 2/11/26
Bidjudge
CASH FLOW
  • $0
  • $0
Bidjudge