- Blois Construction
- 2026
- 9
- 2
- 22.22%
- $135,969,618
- 1.25%
- 91.51%
- 30.12%
- $325,783,830

Blois enters execution on two recently awarded contracts totaling **$136M**, including the **$106M** North Hollywood project with a 12-month duration that will drive immediate cash inflows. The **$198M** remaining backlog provides solid near-term revenue visibility, though mobilization costs on the long-duration **$30M** Calleguas project may pressure short-term liquidity.
Medium-term Outlook (6-12 months)
The **$106M** project will reach substantial completion within this window, converting backlog into cash while the **$30M** interconnection advances. Historical win rates below 25% suggest limited new backlog additions, requiring disciplined cost control to sustain positive cash flow through project wind-down.
Key Risk Period
The 12- to 24-month horizon presents the greatest exposure once the short-duration **$106M** contract concludes, leaving primarily long-duration work and a thin pipeline given 2024–2025 success rates of 0–8%.
Recommendations
Prioritize aggressive cash collection and subcontractor negotiations on the **$106M** project to build reserves ahead of the post-completion gap; actively pursue at least two to three additional wins in the next bidding cycle to replenish backlog above **$150M**.
- 562 Calleguas Ventura Interconnection
- Calleguas Municipal WD
- $29,988,450
- 5/19/26
- Sewer Main Replacement Glenaven Ave Orange Grove Ave Midwick Dr La Golondrina Ave Ross Ave
- Alhambra
- $4,392,828
- 4/23/26
- 45th Street East Sewer Storm Drain Street Improvements
- Palmdale
- $15,363,940
- 4/20/26
- Low Flow Storm Drain Diversion
- Agoura Hills
- $11,231,070
- 3/24/26
- RFB 26 019 Veolia Sycamore Ave Sewer Trunk Line
- Rialto
- $6,359,453
- 3/20/26
- 8003 North Hollywood Central Remediation Well Collector Line
- Los Angeles
- $105,981,168
- 3/14/26
- 05-1K5204 Santa Barbara County At Various Locations
- Caltrans
- $22,151,497
- 2/5/26
- Strathern Park North Stormwater Capture
- Los Angeles
- $31,349,636
- 1/22/26
- 8070 Western Trunk Line Phase 2A
- Los Angeles
- $98,965,788
- 1/8/26