Financial Health & Pipeline Brief
Analyzed On:  Aug 12, 2026
Blois Construction (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
With only **$24M** remaining backlog on a 120-month project, monthly cash flow is limited to roughly **$200K**, providing minimal near-term revenue support. The 2026 bid wins totaling **$136M** have not yet mobilized, leaving operations dependent on slow burn from the single active contract.

Medium-term Outlook (6-12 months)
Improved 2026 success rate of 18.2% positions the firm for potential backlog expansion if additional lows convert to starts. However, the thin current pipeline risks revenue gaps unless new awards accelerate beyond the **$4.6M** secured in 2025.

Key Risk Period
The next 6-9 months represent the primary risk window due to historically low win rates and a backlog under **$24M**, which could trigger cash flow strain without immediate project mobilization.

Recommendations
Aggressively pursue additional bids to grow backlog above **$100M** while negotiating faster payment terms on the existing contract. Implement monthly cash flow forecasting tied to bid pipeline conversion.
 
JOBS LOW
  • 562 Calleguas Ventura Interconnection
  • Calleguas Municipal WD
  • 5/19/26
  • 8003 North Hollywood Central Remediation Well Collector Line
  • Los Angeles
  • 3/14/26
Bidjudge
JOBS BID
  • MacArthur Lake Stormwater Capture
  • Los Angeles
  • $29,312,706
  • 9/2/26
  • Miscellaneous Water Main Replacement I 153 190th St Prairie Ave Neighborhood
  • Torrance
  • $6,931,553
  • 7/8/26
  • 8071 City Trunk Line North Unit 2
  • Los Angeles
  • $94,064,912
  • 6/16/26
  • 562 Calleguas Ventura Interconnection
  • Calleguas Municipal WD
  • $29,988,450
  • 5/19/26
  • Sewer Main Replacement Glenaven Ave Orange Grove Ave Midwick Dr La Golondrina Ave Ross Ave
  • Alhambra
  • $4,392,828
  • 4/23/26
  • 45th Street East Sewer Storm Drain Street Improvements
  • Palmdale
  • $15,363,940
  • 4/20/26
  • Low Flow Storm Drain Diversion
  • Agoura Hills
  • $11,231,070
  • 3/24/26
  • RFB 26 019 Veolia Sycamore Ave Sewer Trunk Line
  • Rialto
  • $6,359,453
  • 3/20/26
  • 8003 North Hollywood Central Remediation Well Collector Line
  • Los Angeles
  • $105,981,168
  • 3/14/26
  • 05-1K5204 Santa Barbara County At Various Locations
  • Caltrans
  • $22,151,497
  • 2/5/26
  • Strathern Park North Stormwater Capture
  • Los Angeles
  • $31,349,636
  • 1/22/26
  • 8070 Western Trunk Line Phase 2A
  • Los Angeles
  • $98,965,788
  • 1/8/26
Bidjudge
CASH FLOW
  • 8070 Western Trunk Line Phase 2A
  • Calleguas Municipal WD
  • $29,988,450
  • 07/18/26
  • 120
  • 73.3%
  • $7,497,113
  • $7,996,920
  • $7,497,113
  • $7,996,920
Bidjudge