- Blois Construction
- 2026
- 12
- 2
- 16.67%
- $135,969,618
- 1.25%
- 86.33%
- 28.85%
- $456,093,001

With only **$24M** remaining backlog on a 120-month project, monthly cash flow is limited to roughly **$200K**, providing minimal near-term revenue support. The 2026 bid wins totaling **$136M** have not yet mobilized, leaving operations dependent on slow burn from the single active contract.
Medium-term Outlook (6-12 months)
Improved 2026 success rate of 18.2% positions the firm for potential backlog expansion if additional lows convert to starts. However, the thin current pipeline risks revenue gaps unless new awards accelerate beyond the **$4.6M** secured in 2025.
Key Risk Period
The next 6-9 months represent the primary risk window due to historically low win rates and a backlog under **$24M**, which could trigger cash flow strain without immediate project mobilization.
Recommendations
Aggressively pursue additional bids to grow backlog above **$100M** while negotiating faster payment terms on the existing contract. Implement monthly cash flow forecasting tied to bid pipeline conversion.
- MacArthur Lake Stormwater Capture
- Los Angeles
- $29,312,706
- 9/2/26
- Miscellaneous Water Main Replacement I 153 190th St Prairie Ave Neighborhood
- Torrance
- $6,931,553
- 7/8/26
- 8071 City Trunk Line North Unit 2
- Los Angeles
- $94,064,912
- 6/16/26
- 562 Calleguas Ventura Interconnection
- Calleguas Municipal WD
- $29,988,450
- 5/19/26
- Sewer Main Replacement Glenaven Ave Orange Grove Ave Midwick Dr La Golondrina Ave Ross Ave
- Alhambra
- $4,392,828
- 4/23/26
- 45th Street East Sewer Storm Drain Street Improvements
- Palmdale
- $15,363,940
- 4/20/26
- Low Flow Storm Drain Diversion
- Agoura Hills
- $11,231,070
- 3/24/26
- RFB 26 019 Veolia Sycamore Ave Sewer Trunk Line
- Rialto
- $6,359,453
- 3/20/26
- 8003 North Hollywood Central Remediation Well Collector Line
- Los Angeles
- $105,981,168
- 3/14/26
- 05-1K5204 Santa Barbara County At Various Locations
- Caltrans
- $22,151,497
- 2/5/26
- Strathern Park North Stormwater Capture
- Los Angeles
- $31,349,636
- 1/22/26
- 8070 Western Trunk Line Phase 2A
- Los Angeles
- $98,965,788
- 1/8/26