BidJudge.com - Projects
estimating@teichert.com
265 Val Dervin Parkway
Stockton CA
95206
209-983-2300
209-983-2375
Health Breakdown
Avg Left
-20
Success
30
Avg Avg
10
Year Proj
50
2 Year Prior Proj
-30
Qual Based
0
Cash Flow
25
 
65%
65%
Health
Financial Health & Pipeline Brief
Analyzed On:  Aug 12, 2026
A Teichert & Son Teichert Const (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
The **$160M** remaining backlog provides solid near-term support, anchored by the full **$20M** Roads Program award and active phases of multiple 2025-2026 projects. Cash inflows should remain steady given the long durations and partial remaining values on larger contracts. The **13.2%** 2026 success rate reflects disciplined bidding that sustains workload without overcommitment.

Medium-term Outlook (6-12 months)
Backlog conversion will draw from **$160M** total remaining, with meaningful contributions from the **$55M** Kings County and **$60M** Placer Parkway projects bid in early 2026. Annual award levels near **$141M** support replenishment if success rates stay above **13%**. Extended contract terms enable predictable but gradual revenue recognition through 2027.

Key Risk Period
The 2027-2028 window presents elevated risk as several 2024-2025 awards with 200-600 month durations approach completion, potentially creating gaps if new wins slow. Variable success rates (**10.7%-16.5%**) and high bid volumes amplify exposure to market or estimating shifts during this transition.

Recommendations
Target **$200M+** annual bid volume with focused pursuit of shorter-duration work to balance the long-term portfolio. Implement monthly backlog burn tracking and working-capital forecasting tied to the **$160M** remaining. Strengthen pre-bid qualification to lift success rates above **15%** and reduce concentration risk.
 
JOBS LOW
  • Sacramento Last Mile Project Package 3 B27151111002
  • Sacramento
  • 9/23/26
  • Pavement Installation Repair Services
  • Santa Clara County
  • 8/31/26
  • 23 052 Roads Program CIP
  • Turlock
  • 7/28/26
  • 06-0S37U4 Kings Fresno Counties Near Lemoore From 0.3 Mile South Excelsior Avenue 1.0 Mile South Co
  • Caltrans
  • 2/12/26
  • Placer Parkway Phase 1 Construction
  • Placer County
  • 2/10/26
  • 2025 CDBG Pavement Rehabilitation Project
  • King City
  • 2/5/26
  • Citywide Street Reconstruction Phase 5
  • San Mateo
  • 2/5/26
Bidjudge
JOBS BID
  • 06-0H22U4 Madera County Madera From San Joaquin River Bridge 0.6 Mile North Avenue 12 Overcrossing
  • Caltrans
  • $85,174,000
  • 10/22/26
  • Vasco Road Safety Improvements Phase 2 0662-6R4411
  • Contra Costa County Public Works
  • $22,737,099
  • 9/24/26
  • Sacramento Last Mile Project Package 3 B27151111002
  • Sacramento
  • $2,535,000
  • 9/23/26
  • Pavement Installation Repair Services
  • Santa Clara County
  • $80,454
  • 8/31/26
  • Salinas Municipal Airport Improvements FAA AIP No 03 06 0206 37
  • Salinas
  • $1,160,832
  • 8/20/26
  • 04-1W7104 Alameda County Fremont From 0.3 Mile North Scott Creek Road Undercrossing 1.0 Mile South
  • Caltrans
  • $3,456,437
  • 8/18/26
  • 05-1S5904 Monterey County At Various Locations
  • Caltrans
  • $4,211,323
  • 8/11/26
  • 23 052 Roads Program CIP
  • Turlock
  • $20,280,558
  • 7/28/26
  • 10-1K6204 Merced County Merced At Gerard Avenue
  • Caltrans
  • $3,977,473
  • 7/16/26
  • Mills Crossing Right Of Way Infrastructure
  • Rancho Cordova
  • $4,408,393
  • 7/16/26
  • Pavement Management 2026
  • San Ramon
  • $5,222,294
  • 7/15/26
  • 2026 Pavement Preservation
  • San Mateo County
  • $2,305,562
  • 6/4/26
  • 10-1M2304 San Joaquin County French Camp At Mathews Road Undercrossing
  • Caltrans
  • $7,106,444
  • 6/2/26
  • Abbott Street Sanitary Sewer Pavement Improvements
  • Salinas
  • $14,906,957
  • 6/2/26
  • City Fresno Pave More Now Bid Package B2
  • Fresno
  • $15,454,000
  • 5/19/26
  • Citywide Street Rehabilitation Package 6 B2
  • San Mateo
  • $3,132,702
  • 5/14/26
  • Citywide Road Surface Repair FY26
  • Monterey
  • $4,039,001
  • 5/5/26
  • 6B E Street Waterline Replacement 9th St Improvements
  • Patterson
  • $10,899,800
  • 4/30/26
  • FY26 Street Resurfacing
  • Palo Alto
  • $3,626,688
  • 4/22/26
  • AC Overlay 2026 Phase B
  • Sacramento County
  • $15,155,538
  • 4/16/26
  • 2026 Major Streets Resurfacing 2
  • San Jose
  • $8,520,305
  • 4/16/26
  • 03-3G6104 Yolo County At Zamora From 0.1 Mile South Adams Creek Bridge 0.2 Mile North Route 505/5 S
  • Caltrans
  • $5,619,814
  • 4/14/26
  • Fair Oaks Boulevard Bicycle Pedestrian Mobility Phase 2
  • Sacramento County
  • $9,689,776
  • 4/9/26
  • AC Overlay 2026 Phase A
  • Sacramento County
  • $12,664,172
  • 4/9/26
  • SJC New Taxiway Victor Phase 3A
  • San Jose
  • $13,802,400
  • 4/9/26
  • 2521 Slurry Seal Resurfacing Portions Various Roadways
  • Alameda County
  • $4,271,264
  • 4/7/26
  • 10-1S6304 Merced County Merced Livingston At Various Locations
  • Caltrans
  • $3,084,248
  • 4/2/26
  • 03-3G7504 Butte County At Butte Valley From Route 70 Separation 0.2 Mile South Durham Pentz Road Fr
  • Caltrans
  • $4,359,888
  • 3/26/26
  • 03-3G7804 Yuba County At Olivehurst From Route 65/70 Separation Yuba River Bridge
  • Caltrans
  • $3,662,824
  • 3/25/26
  • 10-1U0604 Stanislaus County Patterson From 1.1 Miles North Main Canal Bridge 0.2 Mile South Sperry
  • Caltrans
  • $3,828,400
  • 3/18/26
  • 10-1U0804 Merced County At Santa Nella From 0.1 Mile North Mccabe Road The Intersection Sullivan Ro
  • Caltrans
  • $3,717,037
  • 3/17/26
  • FY26 Pavement Improvement
  • Alameda County
  • $11,203,198
  • 3/17/26
  • 2026 DOT SLT Road Maintenance Pavement Rehabilitation
  • El Dorado County
  • $3,484,214
  • 3/10/26
  • 2043 Zone 7 Pavement Management Phase 1
  • Pittsburg
  • $3,590,351
  • 2/26/26
  • Grayson Walnut Creeks Levee Improvement CCCSD Treatment Plant
  • Contra Costa County
  • $8,312,882
  • 2/17/26
  • 2025 Pavement Maintenance Overlay WPR025
  • Elk Grove
  • $5,440,602
  • 2/12/26
  • 06-0S37U4 Kings Fresno Counties Near Lemoore From 0.3 Mile South Excelsior Avenue 1.0 Mile South Co
  • Caltrans
  • $54,562,400
  • 2/12/26
  • 10-1U0404 San Joaquin County Near Stockton From 0.3 Mile West Oro Avenue 0.9 Mile West Murray Road
  • Caltrans
  • $3,956,233
  • 2/12/26
  • Placer Parkway Phase 1 Construction
  • Placer County
  • $59,648,964
  • 2/10/26
  • 2025 CDBG Pavement Rehabilitation Project
  • King City
  • $2,197,060
  • 2/5/26
  • Citywide Street Reconstruction Phase 5
  • San Mateo
  • $4,274,912
  • 2/5/26
  • 06-1H9704 Madera County Near Chowchilla From Route 59/152 Separation 0.1 Mile West Route 99/152 S
  • Caltrans
  • $5,012,000
  • 2/3/26
  • Fresno Pave More Now Bid Package B 1
  • Fresno
  • $9,689,200
  • 1/20/26
  • 03-0J4004 El Dorado County Placerville From 0.1 Mile West Carson Road Overcrossing 5 Mile Road 1.0
  • Caltrans
  • $35,972,744
  • 1/14/26
  • 06-0Y1804 Madera County Madera From 0.1 Mile South Avenue 13 0.1 Mile South East Madera Underpas
  • Caltrans
  • $20,994,400
  • 1/13/26
Bidjudge
CASH FLOW
  • 06-0Y1804 Madera County Madera From 0.1 Mile South Avenue 13 0.1 Mile South East Madera Underpas
  • Turlock
  • $20,280,558
  • 09/26/26
  • 120
  • 25.8%
  • $5,070,140
  • $15,041,414
  • 06-0Y1804 Madera County Madera From 0.1 Mile South Avenue 13 0.1 Mile South East Madera Underpas
  • Caltrans
  • $54,562,400
  • 04/13/26
  • 585
  • 33.7%
  • $2,798,072
  • $36,188,395
  • 06-0Y1804 Madera County Madera From 0.1 Mile South Avenue 13 0.1 Mile South East Madera Underpas
  • Placer County
  • $59,648,964
  • 04/11/26
  • 400
  • 49.8%
  • $4,473,672
  • $29,973,604
  • 06-0Y1804 Madera County Madera From 0.1 Mile South Avenue 13 0.1 Mile South East Madera Underpas
  • Caltrans
  • $29,830,200
  • 02/16/26
  • 380
  • 66.6%
  • $2,355,016
  • $9,969,567
  • 06-0Y1804 Madera County Madera From 0.1 Mile South Avenue 13 0.1 Mile South East Madera Underpas
  • Caltrans
  • $8,130,810
  • 02/09/26
  • 595
  • 43.7%
  • $409,957
  • $4,577,851
  • 06-0Y1804 Madera County Madera From 0.1 Mile South Avenue 13 0.1 Mile South East Madera Underpas
  • Caltrans
  • $14,122,511
  • 01/18/26
  • 605
  • 46.6%
  • $700,290
  • $7,539,787
  • 06-0Y1804 Madera County Madera From 0.1 Mile South Avenue 13 0.1 Mile South East Madera Underpas
  • Caltrans
  • $53,123,992
  • 10/13/25
  • 530
  • 71.5%
  • $3,007,018
  • $15,135,326
  • $18,814,165
  • $121,041,398
Bidjudge