BidJudge.com - Projects
  • CR Jackson
  • 2026
  • 36
  • 17
  • 47.22%
  • $107,438,823
  • 7.09%
  • 8.14%
  • 5.40%
  • $255,311,629
cwarren@crjackson.com
100 Independence Blvd
Columbia SC
29210
803-750-6070
Health Breakdown
Avg Left
-10
Success
50
Avg Avg
10
Year Proj
50
2 Year Prior Proj
Qual Based
0
Cash Flow
-15
 
85%
85%
Health
Financial Health & Pipeline Brief
Analyzed On:  Aug 13, 2026
CR Jackson (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
The **$20.4M** remaining backlog from five active projects provides limited near-term revenue visibility, with most contracts featuring extended durations that slow burn rates. Recent 2026 bidding activity totaling **$179M** at a **42.9%** success rate signals improved win momentum, yet cash inflows will remain constrained until new awards mobilize.

Medium-term Outlook (6-12 months)
Sustained bidding at **$165M–$179M** annually positions the firm to replenish backlog, but the current **$20.4M** level risks revenue gaps if win rates slip below **30%**. Extended project durations across the active portfolio will continue to defer substantial cash recognition into later periods.

Key Risk Period
The 6–12 month window represents the primary risk period, as the thin **$20.4M** backlog could exhaust before sufficient 2026 wins convert to billable work, amplifying cash flow pressure amid long-duration contracts.

Recommendations
Prioritize accelerating mobilization on the five active projects to improve near-term collections and target a minimum **$40M** backlog threshold within nine months through focused bid strategies.
 
JOBS LOW
  • 150 Lee
  • SCDOT
  • 9/9/26
  • 270 Calhoun Orangeburg
  • SCDOT
  • 9/9/26
  • 240 Darlington Florence
  • SCDOT
  • 9/9/26
  • 190 Sumter
  • SCDOT
  • 9/9/26
  • 140 Lancaster
  • SCDOT
  • 9/9/26
  • 160 Lexington
  • SCDOT
  • 9/9/26
  • 170 Marion
  • SCDOT
  • 9/9/26
  • 25 25 26 CPSTIII Dirt Pave Districts 4 5 6
  • Florence County SC
  • 3/11/26
  • 070 Chesterfield
  • SCDOT
  • 3/10/26
  • 090 Darlington
  • SCDOT
  • 3/10/26
  • 100 Florence
  • SCDOT
  • 3/10/26
  • Roadway Improvements Project Group 12
  • Florence SC
  • 2/12/26
  • 160 MARLBORO
  • SCDOT
  • 1/13/26
  • 170 ORANGEBURG
  • SCDOT
  • 1/13/26
  • 020 BAMBERG
  • SCDOT
  • 1/13/26
  • 110 KERSHAW
  • SCDOT
  • 1/13/26
  • 130 LEXINGTON
  • SCDOT
  • 1/13/26
Bidjudge
JOBS BID
  • 150 Lee
  • SCDOT
  • $5,476,158
  • 9/9/26
  • 160 Lexington
  • SCDOT
  • $7,657,402
  • 9/9/26
  • 140 Lancaster
  • SCDOT
  • $7,988,636
  • 9/9/26
  • 130 Jasper
  • SCDOT
  • $9,994,217
  • 9/9/26
  • 170 Marion
  • SCDOT
  • $6,673,470
  • 9/9/26
  • 240 Darlington Florence
  • SCDOT
  • $6,181,144
  • 9/9/26
  • 270 Calhoun Orangeburg
  • SCDOT
  • $8,978,047
  • 9/9/26
  • 260 Allendale Hampton
  • SCDOT
  • $11,725,283
  • 9/9/26
  • 190 Sumter
  • SCDOT
  • $2,296,744
  • 9/9/26
  • Cpst Iii Resurfacing Project Districts 3 8
  • Florence County SC
  • $2,538,508
  • 9/2/26
  • 160 Orangeburg - SC OLD NUMBER SIX HWY ROAD DEPARTURE MITIGATION
  • SCDOT
  • $2,733,742
  • 8/11/26
  • 150 Lexington - S-73 FISH HATCHERY ROAD ROADWAY DEPARTURE MITIGATION
  • SCDOT
  • $943,764
  • 8/11/26
  • 090 Marlboro - 2026 MARLBORO CTC RESURFACING
  • SCDOT
  • $1,824,822
  • 8/11/26
  • 020 Clarendon - 2026 CLARENDON CTC RESURFACING
  • SCDOT
  • $377,856
  • 8/11/26
  • 010 Florence
  • SCDOT
  • $2,877,691
  • 6/9/26
  • Pineview Road Widening
  • Richland County SC
  • $6,851,121
  • 6/8/26
  • 24144 0021 East Montclair Way Extension Freedom Boulevard US Highway 301
  • Florence County SC
  • $1,075,025
  • 5/26/26
  • 31 25 26 Buddys Lane Full Depth Asphalt Patching Asphalt Surface
  • Florence County SC
  • $45,400
  • 5/6/26
  • 050 Lexington
  • SCDOT
  • $65,904,453
  • 4/14/26
  • 29 25 26 CPSTIII Resurfacing District 9 8
  • Florence County SC
  • $2,813,100
  • 4/1/26
  • Resurfacing Package V
  • Richland County SC
  • $4,746,391
  • 3/26/26
  • 25 25 26 CPSTIII Dirt Pave Districts 4 5 6
  • Florence County SC
  • $1,448,663
  • 3/11/26
  • 200 Richland
  • SCDOT
  • $7,733,348
  • 3/10/26
  • 170 Orangeburg
  • SCDOT
  • $7,224,874
  • 3/10/26
  • 150 Lancaster
  • SCDOT
  • $8,821,665
  • 3/10/26
  • 100 Florence
  • SCDOT
  • $5,335,850
  • 3/10/26
  • 090 Darlington
  • SCDOT
  • $8,368,916
  • 3/10/26
  • 070 Chesterfield
  • SCDOT
  • $5,659,513
  • 3/10/26
  • Roadway Improvements Project Group 12
  • Florence SC
  • $895,423
  • 2/12/26
  • 160 MARLBORO
  • SCDOT
  • $6,847,280
  • 1/13/26
  • 170 ORANGEBURG
  • SCDOT
  • $10,322,958
  • 1/13/26
  • 140 MARION
  • SCDOT
  • $6,151,555
  • 1/13/26
  • 020 BAMBERG
  • SCDOT
  • $6,299,359
  • 1/13/26
  • 100 JASPER
  • SCDOT
  • $3,489,991
  • 1/13/26
  • 110 KERSHAW
  • SCDOT
  • $8,115,647
  • 1/13/26
  • 130 LEXINGTON
  • SCDOT
  • $8,893,613
  • 1/13/26
Bidjudge
CASH FLOW
  • 150 Lee
  • SCDOT
  • $5,476,158
  • 11/08/26
  • 365
  • 0%
  • -
  • $5,476,158
  • 130 LEXINGTON
  • SCDOT
  • $5,335,850
  • 05/09/26
  • 365
  • 38.1%
  • $438,563
  • $3,303,841
  • 130 LEXINGTON
  • SCDOT
  • $8,368,916
  • 05/09/26
  • 500
  • 27.8%
  • $502,135
  • $6,042,357
  • 130 LEXINGTON
  • SCDOT
  • $5,659,513
  • 05/09/26
  • 365
  • 38.1%
  • $465,165
  • $3,504,246
  • 130 LEXINGTON
  • SCDOT
  • $8,889,365
  • 11/08/25
  • 669
  • 48.0%
  • $398,626
  • $4,624,064
  • $1,804,489
  • $62,726,109
Bidjudge