- Riverside Construction Co.
- 2026
- 15
- 2
- 13.33%
- $103,708,810
- 3.60%
- 58.39%
- 25.17%
- $165,442,714

Riverside Construction faces constrained cash flow with only **$3.3M** in remaining backlog across two active projects. Minimal new awards in 2024 and 2026 limit near-term revenue, requiring immediate focus on converting bids to maintain operations.
Medium-term Outlook (6-12 months)
The **$27.1M** secured in 2025 provides some carryover, but the 0% success rate in adjacent years signals inconsistent pipeline replenishment. Sustained bidding activity at the **$138M** level seen in 2025 will be essential to stabilize workload beyond current projects.
Key Risk Period
The period through mid-2026 presents elevated risk due to near-zero backlog and repeated bidding failures, potentially triggering liquidity shortfalls without new contract wins.
Recommendations
Prioritize aggressive pursuit of high-probability bids while monitoring burn rates on the remaining **$3.3M** backlog; consider targeted cost controls and bonding capacity reviews to support growth.
- 08-1M0804 San Bernardino County Near Hesperia From 1.0 Mile East Wagon Train Road Hog Ranch Creek B
- Caltrans
- $7,882,219
- 10/15/26
- Third Street Grade Separation BNSF Railroad
- Riverside
- $54,998,989
- 9/9/26
- Avenue 50 Bridge Over Coachella Valley Stormwater Channel Improvement
- Coachella
- $48,709,821
- 9/3/26
- Etiwanda Ave Slover Ave Airport Drive Intersection Improvement
- Fontana
- $13,866,114
- 7/23/26
- 08-1N6104 Riverside County Corona From 0.2 Mile North Ontario Avenue Undercrossing Old Temescal Ro
- Caltrans
- $5,992,093
- 7/22/26
- Avenue 53 Tot Lot Roundabout Improvements
- Coachella
- $2,263,679
- 7/9/26
- Bartlett Parking Lot Extension
- Big Bear Lake
- $3,764,315
- 6/24/26
- California Street Redlands Boulevard Intersection Widening
- Redlands
- $8,387,183
- 6/4/26
- 08-1R4004 San Bernardino County Redlands At Lugonia Avenue Undercrossing
- Caltrans
- $590,961
- 5/28/26
- 08-1R8004 San Bernardino County Colton Route 215 At Route 10/215 Separation Highland Route 330 At R
- Caltrans
- $620,260
- 5/27/26
- Fremont Avenue Improvement
- Montclair
- $3,913,558
- 3/31/26
- Storm Drain Improvements W Hill Drive
- San Bernardino
- $1,292,050
- 3/25/26
- RFB 26 019 Veolia Sycamore Ave Sewer Trunk Line
- Rialto
- $4,326,400
- 3/20/26
- Cathedral Canyon Drive Sidewalk Improvement Between Paseo Azulejo Kiely Road
- Cathedral City
- $287,650
- 3/11/26
- Esplanade Avenue Widening Phase 1 Warren Road Sanderson Avenue
- San Jacinto
- $8,547,422
- 2/19/26
- Third Street Grade Separation BNSF Railroad
- Riverside
- $54,998,989
- 11/08/26
- 120
- 0%
- -
- $54,998,989
- Esplanade Avenue Widening Phase 1 Warren Road Sanderson Avenue
- Coachella
- $48,709,821
- 11/02/26
- 120
- 2.5%
- $12,177,455
- $47,492,075
- Esplanade Avenue Widening Phase 1 Warren Road Sanderson Avenue
- Caltrans
- $4,774,890
- 01/04/26
- 430
- 70.9%
- $333,132
- $1,388,049
- $12,510,587
- $103,879,113

