- Palmetto Sitework Services Infrastructure
- 2026
- 23
- 3
- 13.04%
- $17,524,268
- 2.12%
- 37.39%
- 12.75%
- $65,537,665

With **$0** remaining backlog, the contractor faces immediate cash flow pressure and must secure new awards rapidly to sustain operations. Recent 2026 wins totaling **$14.9M** at only 1.92% average margin left offer limited buffer, while the 16.7% success rate on 12 bids signals inconsistent pipeline conversion.
Medium-term Outlook (6-12 months)
Bidding activity at **$33.7M** total in 2026 provides a foundation for recovery if the success rate improves from the current 16.7%, potentially rebuilding backlog beyond the **$10.4M** achieved in 2025. Sustained low win rates could extend revenue gaps into the following year.
Key Risk Period
The immediate period through mid-2026 represents the highest risk due to **$0** backlog and thin margins on recent low bids, exposing the firm to potential liquidity shortfalls without prompt contract wins.
Recommendations
Prioritize targeted bidding on higher-margin opportunities in SC infrastructure to lift success rates above 30% and rebuild backlog; implement stricter cost controls to protect the 1.92% margins observed on 2026 awards.
- 2026 Cedar Springs Road
- Kershaw County
- $2,631,316
- 9/10/26
- Elloree Waterline Replacement
- American Engineering Consultant Inc
- $2,452,816
- 9/10/26
- RFP 2027011 Alverson Road Bridge Replacement
- Spartanburg SC
- $4,268,461
- 9/10/26
- 090 Fairfield
- SCDOT
- $8,149,264
- 9/9/26
- 060 Calhoun
- SCDOT
- $2,584,739
- 9/9/26
- Old Spell Road Improvements Phase 2
- Dorchester County SC
- $1,417,540
- 8/18/26
- 25 161 01 Intersection Realignment
- Calhoun County SC
- $1,299,159
- 8/12/26
- 110 Spartanburg - BRIDGE REPLACEMENT S-234 OVER TRIBUTARY
- SCDOT
- $2,849,102
- 8/11/26
- 100 Orangeburg - REPLACEMENT OF 60 FOOT BRIDGE ON S-92
- SCDOT
- $3,130,640
- 8/11/26
- 080 Lexington - REPLACE CULVERT S-59 DEVILS BACKBONE RD
- SCDOT
- $1,798,308
- 8/11/26
- North Church Street Parking Lot
- Lexington SC
- $1,253,808
- 7/29/26
- 040 Lexington
- SCDOT
- $1,970,550
- 6/9/26
- 020 Berkeley
- SCDOT
- $2,077,182
- 5/12/26
- 050 Hampton
- SCDOT
- $2,215,299
- 5/12/26
- 060 Richland
- SCDOT
- $453,902
- 5/12/26
- 010 Aiken Culvert
- SCDOT
- $989,249
- 5/12/26
- Orangeburg Road Mallard Road Intersection Improvements
- Dorchester County SC
- $990,497
- 4/23/26
- 070 Orangeburg
- SCDOT
- $2,746,089
- 4/14/26
- 110 Greenwood Replacement Asset
- SCDOT
- $6,199,734
- 3/10/26
- Connelly Haynes Road Improvements
- Dorchester County SC
- $898,381
- 3/10/26
- Chapel Branch Water Crossing
- Santee SC
- $222,100
- 1/27/26
- 060 CHARLESTON
- SCDOT
- $9,459,145
- 1/13/26
- 030 BARNWELL
- SCDOT
- $5,480,384
- 1/13/26