Financial Health & Pipeline Brief
Analyzed On:  Aug 13, 2026
Palmetto Sitework Services Infrastructure (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
With **$0** remaining backlog, the contractor faces immediate cash flow pressure and must secure new awards rapidly to sustain operations. Recent 2026 wins totaling **$14.9M** at only 1.92% average margin left offer limited buffer, while the 16.7% success rate on 12 bids signals inconsistent pipeline conversion.

Medium-term Outlook (6-12 months)
Bidding activity at **$33.7M** total in 2026 provides a foundation for recovery if the success rate improves from the current 16.7%, potentially rebuilding backlog beyond the **$10.4M** achieved in 2025. Sustained low win rates could extend revenue gaps into the following year.

Key Risk Period
The immediate period through mid-2026 represents the highest risk due to **$0** backlog and thin margins on recent low bids, exposing the firm to potential liquidity shortfalls without prompt contract wins.

Recommendations
Prioritize targeted bidding on higher-margin opportunities in SC infrastructure to lift success rates above 30% and rebuild backlog; implement stricter cost controls to protect the 1.92% margins observed on 2026 awards.
 
JOBS LOW
  • 060 Calhoun
  • SCDOT
  • 9/9/26
  • 060 CHARLESTON
  • SCDOT
  • 1/13/26
  • 030 BARNWELL
  • SCDOT
  • 1/13/26
Bidjudge
JOBS BID
  • 2026 Cedar Springs Road
  • Kershaw County
  • $2,631,316
  • 9/10/26
  • Elloree Waterline Replacement
  • American Engineering Consultant Inc
  • $2,452,816
  • 9/10/26
  • RFP 2027011 Alverson Road Bridge Replacement
  • Spartanburg SC
  • $4,268,461
  • 9/10/26
  • 090 Fairfield
  • SCDOT
  • $8,149,264
  • 9/9/26
  • 060 Calhoun
  • SCDOT
  • $2,584,739
  • 9/9/26
  • Old Spell Road Improvements Phase 2
  • Dorchester County SC
  • $1,417,540
  • 8/18/26
  • 25 161 01 Intersection Realignment
  • Calhoun County SC
  • $1,299,159
  • 8/12/26
  • 110 Spartanburg - BRIDGE REPLACEMENT S-234 OVER TRIBUTARY
  • SCDOT
  • $2,849,102
  • 8/11/26
  • 100 Orangeburg - REPLACEMENT OF 60 FOOT BRIDGE ON S-92
  • SCDOT
  • $3,130,640
  • 8/11/26
  • 080 Lexington - REPLACE CULVERT S-59 DEVILS BACKBONE RD
  • SCDOT
  • $1,798,308
  • 8/11/26
  • North Church Street Parking Lot
  • Lexington SC
  • $1,253,808
  • 7/29/26
  • 040 Lexington
  • SCDOT
  • $1,970,550
  • 6/9/26
  • 020 Berkeley
  • SCDOT
  • $2,077,182
  • 5/12/26
  • 050 Hampton
  • SCDOT
  • $2,215,299
  • 5/12/26
  • 060 Richland
  • SCDOT
  • $453,902
  • 5/12/26
  • 010 Aiken Culvert
  • SCDOT
  • $989,249
  • 5/12/26
  • Orangeburg Road Mallard Road Intersection Improvements
  • Dorchester County SC
  • $990,497
  • 4/23/26
  • 070 Orangeburg
  • SCDOT
  • $2,746,089
  • 4/14/26
  • 110 Greenwood Replacement Asset
  • SCDOT
  • $6,199,734
  • 3/10/26
  • Connelly Haynes Road Improvements
  • Dorchester County SC
  • $898,381
  • 3/10/26
  • Chapel Branch Water Crossing
  • Santee SC
  • $222,100
  • 1/27/26
  • 060 CHARLESTON
  • SCDOT
  • $9,459,145
  • 1/13/26
  • 030 BARNWELL
  • SCDOT
  • $5,480,384
  • 1/13/26
Bidjudge
CASH FLOW
  • $0
  • $2,584,739
Bidjudge