- Kerr Contractors - WA
- 2026
- 10
- 3
- 30.00%
- $20,885,651
- 6.76%
- 18.59%
- 8.84%
- $43,405,874

With only **$9.4M** in total remaining backlog across two long-duration projects, cash inflows will remain limited and spread over extended timelines. The 30% success rate achieved in 2026 on **$20.9M** of low bids offers modest momentum but does not yet translate to near-term revenue acceleration.
Medium-term Outlook (6-12 months)
Steady but modest progress on the **$6.3M** and **$3.1M** remaining balances will support baseline operations, assuming consistent execution. Sustained bidding volume at 2026 levels could begin replenishing backlog if win rates hold above prior-year levels.
Key Risk Period
Beyond 12 months, the minimal **$9.4M** backlog combined with the 2025 zero-win record creates elevated exposure to revenue gaps without additional contract awards.
Recommendations
Increase bid volume and target higher win rates to expand backlog above current levels. Validate contract duration data for accurate cash flow modeling and prioritize near-term project starts.
- NE 112th Ave Water Transmission Main
- Vancouver
- $3,177,119
- 7/21/26
- US 12 Eschbach Rd Ackley Rd Clover Ln I S Safety Improvements
- WSDOT
- $2,105,412
- 7/15/26
- Dike Road Reconstruction
- Cowlitz County
- $4,357,360
- 6/22/26
- I 5 I 205 Concrete Panel Rehabilitation
- WSDOT
- $3,976,384
- 6/17/26
- US 12 I 5 0 5 Mile East Harms Rd Paving
- WSDOT
- $6,228,230
- 6/3/26
- SR 14 W Camas Slough Bridge Deck Paving
- WSDOT
- $2,022,969
- 5/13/26
- I 5 1 2 Mi S Rogers Rd SR 505 Vic Paving
- WSDOT
- $8,546,344
- 5/13/26
- I 5 Koontz Rd S Alder St Exceptions
- WSDOT
- $3,207,781
- 4/15/26
- SR 500 I 5 39th St Corridor Connection
- WSDOT
- $652,749
- 4/8/26
- I 5 SB I 205 NE 179th St Concrete Pavement Rehabilitation
- WSDOT
- $9,131,526
- 1/28/26