BidJudge.com - Projects
9796 Kent St.
Elk Grove OR
95624
916-686-2800
Health Breakdown
Avg Left
-10
Success
30
Avg Avg
5
Year Proj
50
2 Year Prior Proj
Qual Based
0
Cash Flow
50
 
125%
100%
Health
Financial Health & Pipeline Brief
Analyzed On:  Aug 13, 2026
Pacific Excavation Inc - OR (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
Pacific Excavation maintains a limited active backlog of **$4.3M** across eight long-duration projects, generating modest near-term cash flow from remaining values such as **$3.1M** on the W 23rd Ave water main. High 2026 bidding activity of **$145.7M** at a 15.1% success rate supports pipeline replenishment, though conversion timing will dictate revenue stability through mid-year.

Medium-term Outlook (6-12 months)
Sustained bidding momentum from 34-53 jobs annually positions the firm to expand beyond the current **$4.3M** backlog, building on 2025-2026 wins totaling **$15.5M**. Execution of multi-year contracts should stabilize operations if win rates hold near 17%.

Key Risk Period
The period immediately following depletion of the **$4.3M** backlog represents the primary exposure, as low per-project remainders and 15.1% success rates could create revenue gaps without accelerated wins.

Recommendations
Prioritize aggressive bidding on higher-value opportunities while monitoring burn rates on existing contracts to maintain positive cash flow. Target a backlog threshold of **$10M+** within 12 months through refined estimating to improve margins above the current 5.33% average left on low bids.
 
JOBS LOW
  • 14546 Jessie M Honeyman SP Water Intake Replacement
  • Oregon Parks
  • 11/2/26
  • 26 142 PW Hayden Bridge Lower Pond Improvements
  • EWEB
  • 10/13/26
  • EWEB ITB 26 139 PW Van Buren St Main Replacement
  • EWEB
  • 8/20/26
  • EWEB ITB 26 056 PW Arthur St Amazon Creek Bridge
  • Eugene Water & Electric Board
  • 5/19/26
  • ITB 26 075 PW W 23rd Ave Transmission Water Main Lincoln Willamette St
  • Eugene Water & Electric Board
  • 5/14/26
  • Red Rock Creek Waterline Improvements
  • Tigard
  • 4/29/26
  • Glenwood Ct Drainage Improvements
  • Lake Oswego
  • 4/14/26
  • SW Scholls Ferry Road Sidewalk Improvements SW Laurelwood Avenue SW 77th Avenue
  • Washington County - OR
  • 3/18/26
  • 26 032 PW Myoak Drive River Road Water Main
  • Eugene Water & Electric Board
  • 3/17/26
  • Highland Dr Grant Ave Walnut Blvd Street Improvements
  • Corvallis
  • 3/12/26
  • 256083 State Street Southside Sidewalk Improvements
  • Salem
  • 3/10/26
Bidjudge
JOBS BID
  • 14546 Jessie M Honeyman SP Water Intake Replacement
  • Oregon Parks
  • $567,105
  • 11/2/26
  • Erickson Ave Waterline Replacement 2nd St 5th St
  • Beaverton
  • $384,000
  • 10/21/26
  • Center Street Water Main Pavement Ramp Improvements
  • Tigard
  • $841,391
  • 10/13/26
  • 26 142 PW Hayden Bridge Lower Pond Improvements
  • EWEB
  • $815,400
  • 10/13/26
  • Northwest Oregon Pedestrian Crossing Enhancements 2027
  • ODOT
  • $1,678,194
  • 10/8/26
  • ITB 20272017 Rental Car Sidewalk
  • Eugene
  • $106,681
  • 10/6/26
  • US101 39th St Holmes Rd Lincoln City
  • ODOT
  • $774,316
  • 9/24/26
  • OR99W 3rd St 4th St Western Blvd
  • ODOT
  • $1,815,890
  • 9/17/26
  • 27 002 RFP Wilson Dr Ave Waterline Replacement
  • Beaverton
  • $346,700
  • 9/8/26
  • Wilson Dr Ave Waterline Replacement
  • Beaver
  • $1,088,000
  • 9/8/26
  • Central Ave Pedestrian Improvements Sutherlin
  • Douglas County - OR
  • $222,978
  • 9/3/26
  • ITB 20272001 Cuthbert Amphitheater Site Improvements
  • Eugene
  • $1,901,812
  • 9/1/26
  • P21205 Mohawk Paving ADA
  • Springfield
  • $290,716
  • 8/27/26
  • EWEB ITB 26 139 PW Van Buren St Main Replacement
  • EWEB
  • $360,350
  • 8/20/26
  • Walking Woods Drive New Storm System Pipe Connections
  • Lake Oswego
  • $288,000
  • 8/18/26
  • 2026 ITB 16 Patterson Street Safety Pilot E 18th Ave to E 24th Ave
  • Eugene
  • $128,313
  • 8/6/26
  • ITB 2026 14 Willamette Heights Tank No 4
  • Springfield
  • $5,772,040
  • 8/4/26
  • 116200 2026 Vadis Road Reconstruction
  • Washington County - OR
  • $288,000
  • 7/22/26
  • Sherwood Forest Watermain Replacement Phase1
  • Gladstone
  • $176,000
  • 7/22/26
  • 2026 50 Leland Beavercreek Intersection Improvements
  • Clackamas County
  • $289,000
  • 7/22/26
  • 26079 ITB SW Juniper Terrace Waterline Improvements
  • Beaverton
  • $341,900
  • 7/21/26
  • City View 1150 Pump Station Construction
  • Eugene Water & Electric Board
  • $2,105,705
  • 7/15/26
  • Pilkington Road Pathway
  • Lake Oswego
  • $362,000
  • 6/18/26
  • ITB 14 2026 Safe Routes School Awbrey Park Elementary Pedestrian Access
  • Eugene
  • $95,505
  • 6/16/26
  • ITB 20262031 Suzanne Arlie Park Trailhead Parking Road Widening
  • Eugene
  • $1,396,120
  • 6/11/26
  • 100821 Schmeltzer Rd Culvert Replacement
  • Washington County - OR
  • $498,000
  • 6/3/26
  • 12th Street Sewer Main Replacement
  • Gresham
  • $172,000
  • 5/27/26
  • EWEB ITB 26 056 PW Arthur St Amazon Creek Bridge
  • Eugene Water & Electric Board
  • $137,850
  • 5/19/26
  • Hydrant SE 469 Waterline Replacement
  • Hillsboro
  • $271,000
  • 5/19/26
  • ITB 26 075 PW W 23rd Ave Transmission Water Main Lincoln Willamette St
  • Eugene Water & Electric Board
  • $4,084,318
  • 5/14/26
  • Copper Creek Outfall Stabilization
  • Tigard
  • $744,000
  • 5/12/26
  • NE Cleveland Ave SE Stark St NE Burnside
  • Gresham
  • $3,764,000
  • 5/11/26
  • EWEB ITB 26 083 PW E 23rd Ave Alder St Emerald St Transmission Main
  • Eugene Water & Electric Board
  • $5,687,902
  • 5/7/26
  • NE 223rd Avenue Improvement
  • Multnomah County
  • $1,484,000
  • 5/7/26
  • Red Rock Creek Waterline Improvements
  • Tigard
  • $325,000
  • 4/29/26
  • Steve Street Park
  • Tigard
  • $1,674,000
  • 4/28/26
  • 100700 S W Bonita Road SW Sequoia Parkway Intersection Improvements
  • Washington County - OR
  • $458,000
  • 4/22/26
  • Parkview Loop Waterline Replacement
  • Beaverton
  • $1,598,000
  • 4/21/26
  • 2026 Safe Routes Schools Improvement
  • West Linn
  • $643,000
  • 4/16/26
  • Glenwood Ct Drainage Improvements
  • Lake Oswego
  • $88,000
  • 4/14/26
  • McEwan Road New Sidewalk Stormwater Management Facilities
  • Lake Oswego
  • $598,000
  • 4/7/26
  • Brown Road Improvements
  • Wilsonville
  • $5,194,000
  • 3/31/26
  • Gaarde Street Waterline Extension
  • Tigard
  • $279,000
  • 3/31/26
  • 100315 NW Walker Road NW 185th Ave NW 173rd Ave
  • Washington County - OR
  • $18,472,000
  • 3/25/26
  • ITB 4 2026 Safe Routes School Prairie Mountain School Crossing
  • Eugene
  • $481,552
  • 3/19/26
  • SW Scholls Ferry Road Sidewalk Improvements SW Laurelwood Avenue SW 77th Avenue
  • Washington County - OR
  • $1,738,000
  • 3/18/26
  • 256111 Imperial Drive NE Waterline Replacement
  • Salem
  • $189,017
  • 3/17/26
  • 26 032 PW Myoak Drive River Road Water Main
  • Eugene Water & Electric Board
  • $276,074
  • 3/17/26
  • Highland Dr Grant Ave Walnut Blvd Street Improvements
  • Corvallis
  • $1,206,296
  • 3/12/26
  • Bay Blvd Sidewalk Improvements
  • Newport City
  • $268,770
  • 3/11/26
  • 256083 State Street Southside Sidewalk Improvements
  • Salem
  • $196,498
  • 3/10/26
  • SE 33rd Avenue Waterline Improvement
  • Hillsboro
  • $1,017,000
  • 3/5/26
  • FY23 FY25 Annual Pedestrian Enhancements
  • Wilsonville
  • $522,000
  • 3/3/26
  • 11th Street 12th Street Improvements Main Applegate
  • Philomath
  • $866,817
  • 2/25/26
  • 100742 SW Kinnaman Road Sidewalk 194th Ct 196th Ave
  • Washington County - OR
  • $566,000
  • 2/25/26
  • 36th Street Main Street Commercial Ave
  • Springfield
  • $729,242
  • 2/24/26
  • 100238 SW Walker Road SW Murray Boulevard Intersection Improvements
  • Washington County - OR
  • $39,188,000
  • 2/11/26
  • 11th Crow Utility Extension
  • Eugene
  • $15,132,227
  • 2/3/26
  • 2026 ITB 2 West 11th Avenue Crow Road Utility Extension
  • Eugene
  • $15,132,227
  • 2/3/26
  • Redfern Ave Drainage Improvements
  • Lake Oswego
  • $832,000
  • 2/3/26
  • 4J School District Pavement Repair
  • Eugene School District 4J
  • $924,500
  • 1/29/26
  • 2026 ITB 1 Willamette Street W 52nd Avenue Parking Lot
  • Eugene
  • $421,166
  • 1/27/26
  • 2026 Street Maintenance 4014
  • Wilsonville
  • $1,551,000
  • 1/27/26
  • 22nd Street Hart Road Waterline Sewer Rehab
  • Beaverton
  • $1,659,545
  • 1/20/26
  • EWEB Concrete ITB 25 213 PW
  • Eugene Water & Electric Board
  • $898,465
  • 1/15/26
  • 100816 26 27 ADA Ramps 4
  • Washington County
  • $1,125,000
  • 1/14/26
  • McVey Pump Station Replacement
  • Lake Oswego
  • $3,575,000
  • 1/8/26
  • OR38 Elkton Marked Crosswalk Edgeview Dr
  • ODOT
  • $37,670
  • 1/7/26
Bidjudge
CASH FLOW
  • OR38 Elkton Marked Crosswalk Edgeview Dr
  • EWEB
  • $360,350
  • 10/19/26
  • 120
  • 24.2%
  • $90,088
  • $273,265
  • $90,088
  • $1,655,770
Bidjudge