- McGuire & Hester
- 2026
- 57
- 5
- 8.77%
- $45,763,067
- 6.79%
- 22.06%
- 6.82%
- $291,369,133

Recent 2026 awards totaling **$45.8M** provide a solid start, with **$39.1M** in remaining backlog concentrated in large projects such as the **$32.5M** Mission Bay Ferry Landing. Cash flow should remain stable as work ramps on these long-duration contracts, though mobilization costs on the newest bids may create short-term outflows.
Medium-term Outlook (6-12 months)
Sustained execution of the **$39.1M** backlog will support revenue through mid-2027, but the low **9.4%** win rate and declining bid volume from **$397M** in 2025 signal potential gaps without new awards. Additional low bids from the current pipeline will be critical to maintain workload beyond the existing active projects.
Key Risk Period
The period beyond 12 months presents the highest risk, as the current **$39.1M** backlog could be substantially depleted given extended contract durations and historically modest annual wins averaging **$40M**.
Recommendations
Prioritize aggressive bidding on high-probability opportunities to rebuild backlog above **$60M** and improve win rates above **12%**. Monitor cash flow closely on long-duration projects to avoid liquidity strain from slow progress billings.
- Novato Boulevard Improvements
- Novato
- $19,319,200
- 8/19/26
- Lampasas Ave Rio Linda Blvd
- Sacramento
- $2,052,960
- 8/12/26
- Foxboro Pavement Rehabilitation Phase 1
- Hercules
- $830,315
- 8/11/26
- Joyce Drive Soil Remediation
- Grass Valley
- $1,989,550
- 7/30/26
- Willow Keyes Corridor Improvements Federal No ATPL 5005 173
- San Jose
- $12,567,506
- 7/23/26
- 2026 Street Resurfacing 01 26
- Pleasant Hill
- $4,364,553
- 7/22/26
- Sierra College Blvd I 80 Resurfacing
- Rocklin
- $2,336,633
- 7/16/26
- Sunset Whitney Connector Bridge
- Rocklin
- $798,997
- 7/16/26
- CIP 320 O Hara Avenue Widening 600 South Laurel Road 300 South Grapevine Lane
- Oakley
- $1,220,301
- 7/16/26
- Mills Crossing Right Of Way Infrastructure
- Rancho Cordova
- $4,563,142
- 7/16/26
- Pavement Management 2026
- San Ramon
- $5,309,047
- 7/15/26
- 1003980 East 12th St Bikeway
- Oakland
- $5,055,898
- 7/10/26
- 2025 26 Road Resurfacing Paving Program Construction
- Calaveras County
- $1,573,675
- 7/8/26
- 2026 Pavement Rehabilitation
- Belmont
- $2,946,245
- 7/8/26
- La Mancha Way Valley HI Drive Corridor Improvements
- Sacramento
- $2,023,774
- 6/24/26
- Wyda Way Sidewalk Improvements
- Sacramento County
- $1,019,999
- 6/11/26
- Pavement Rehabilitation
- Pinole
- $1,656,347
- 6/8/26
- Mission Bay Ferry Landing Phase 2B Agua Vista Park Citywide PLA
- San Francisco
- $33,018,200
- 6/3/26
- Annual Paving Phase 44 PW No 04 26 02
- Alameda County
- $1,762,350
- 6/3/26
- 2025 26 Annual Pavement Rehabilitation CIP No 4183 4190
- Orinda
- $3,849,700
- 6/2/26
- 2026 Citywide Pavement Rehabilitation
- Benicia
- $4,551,216
- 6/2/26
- Shake Ridge Road Rehabilitation
- Amador County
- $968,930
- 5/28/26
- Sycamore Valley Road Improvements Fiber Optic Cable Interconnect Improvements
- Danville
- $4,263,335
- 5/28/26
- Parkside Avenue Bridge Replacement
- Hillsborough
- $1,458,997
- 5/27/26
- Broadway Avenue Complete Street Corridor Improvements
- Seaside
- $15,876,109
- 5/21/26
- Citywide Street Rehabilitation Package 6 B2
- San Mateo
- $3,334,928
- 5/14/26
- H Street Temporary Repaving
- Davis
- $289,734
- 5/13/26
- Citywide Surface Treatment Package 4A 2
- San Mateo
- $1,665,303
- 5/12/26
- Storm Damage Repairs Buckeye Canyon Road Sites 2 3 4 Los Vaqueros Ponds D5 H6
- Contra Costa WD
- $1,784,390
- 5/8/26
- Fair Street Rehabilitation
- Chico
- $4,857,128
- 5/1/26
- Northeast Hangar Taxilanes Reconstruction Drainage Improvements Phase 2B
- Solano County
- $2,289,515
- 4/30/26
- Bayer Street Water Main
- Marina Coast WD
- $2,280,910
- 4/29/26
- St Lukes Detention Basin
- Sacramento
- $1,706,615
- 4/29/26
- 2026 Crockett Port Costa Overlays Curb Ramps
- Contra Costa County
- $2,029,198
- 4/28/26
- AC Overlay 2026 Phase C
- Sacramento County
- $6,345,645
- 4/23/26
- 2026 Rodeo Fiberized Slurry Seal Overlays Curb Ramps
- Contra Costa County
- $4,874,770
- 4/21/26
- Skyking Road Extension Phelan Drive
- Sacramento County
- $2,475,298
- 4/16/26
- San Marino Alley Pavement Rehabilitation Rebid
- Davis
- $509,247
- 4/16/26
- AC Overlay 2026 Phase B
- Sacramento County
- $16,234,470
- 4/16/26
- AC Overlay 2026 Phase A
- Sacramento County
- $12,497,803
- 4/9/26
- Fair Oaks Boulevard Bicycle Pedestrian Mobility Phase 2
- Sacramento County
- $9,428,728
- 4/9/26
- Devlin Road Paving
- Napa County
- $1,192,462
- 4/9/26
- Street Resurfacing 2026
- Milpitas
- $3,555,555
- 4/8/26
- FY 2026 Street Maintenance Rehabilitation
- Berkeley
- $11,056,648
- 4/2/26
- Paving 2026
- Solano County
- $2,085,360
- 4/1/26
- Sea Haven Community Park
- Marina
- $5,109,869
- 3/26/26
- 1007504 Stoneridge Court Sewer Repair
- Oakland
- $2,540,349
- 3/20/26
- Sacramento International Airport Terminal A Exit Road
- Sacramento County
- $16,840,649
- 3/12/26
- Residential Pavement Maintenance Phase F PJ 2611 2624
- Concord
- $4,894,704
- 3/5/26
- Laguna Creek Multi Functional Corridor
- Elk Grove
- $4,453,141
- 2/17/26
- 2025 Pavement Maintenance Overlay WPR025
- Elk Grove
- $6,081,594
- 2/12/26
- Citywide Street Reconstruction Phase 5
- San Mateo
- $5,732,848
- 2/5/26
- FY2025 26 Road Overlay SB1
- Sutter County
- $2,295,125
- 1/22/26
- 2026 Road Rehabilitation Ceanothus Avenue
- Chico
- $1,689,586
- 1/14/26
- Pomona Avenue Bridge Replacement
- Chico
- $7,035,400
- 1/14/26
- Page Mill Road Intersection Improvement El Camino Real
- Santa Clara County
- $4,266,466
- 1/8/26
- Street Resurfacing 2025 Dempsey Road Great Mall Parkway Phase II
- Milpitas
- $4,558,716
- 1/7/26
- Street Resurfacing 2025 Dempsey Road Great Mall Parkway Phase II
- Pinole
- $1,656,347
- 08/07/26
- 120
- 10.8%
- $414,087
- $1,476,909
- Street Resurfacing 2025 Dempsey Road Great Mall Parkway Phase II
- San Francisco
- $33,018,200
- 08/02/26
- 600
- 3.0%
- $1,650,910
- $32,027,654
- Street Resurfacing 2025 Dempsey Road Great Mall Parkway Phase II
- Davis
- $289,734
- 07/12/26
- 120
- 32.5%
- $72,434
- $195,570
- Street Resurfacing 2025 Dempsey Road Great Mall Parkway Phase II
- Sacramento County
- $6,345,645
- 06/22/26
- 120
- 49.2%
- $1,586,411
- $3,225,703
- Street Resurfacing 2025 Dempsey Road Great Mall Parkway Phase II
- Elk Grove
- $4,453,141
- 04/18/26
- 160
- 77.5%
- $834,964
- $1,001,957
- $4,558,806
- $37,927,793

