BidJudge.com - Projects
publicworks@allamericanasphalt.com
400 E. 6th Street
Corona CA
951-736-7600
951-739-4671
Health Breakdown
Avg Left
50
Success
10
Avg Avg
10
Year Proj
-30
2 Year Prior Proj
75
Qual Based
0
Cash Flow
-15
 
100%
100%
Health
Financial Health & Pipeline Brief
Analyzed On:  Aug 12, 2026
All American Asphalt (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
The **$43.4M** remaining backlog, primarily from mid-2026 awards including the **$22.7M** Taxiway F and **$7.1M** MacArthur projects, provides near-term cash flow stability with multiple projects in active execution phases. Recent bid volume of **$364.8M** at a **13.1%** success rate supports modest replenishment, though lower margins at **3.45%** left on low bids may pressure immediate liquidity.

Medium-term Outlook (6-12 months)
Backlog burn from long-duration contracts averaging 100+ months will accelerate depletion of the **$43.4M** total, requiring sustained wins from the **$454.8M** 2025 pipeline to maintain operations. Success rates holding near **13%** indicate steady but reduced intake versus prior years' **$150.5M** lows.

Key Risk Period
The 9-15 month window poses the highest exposure as current backlog exhausts without corresponding new awards, exacerbated by the drop from **19.9%** to **13.1%** win rates and aging projects with minimal remaining value.

Recommendations
Prioritize aggressive bidding on high-volume pavement and rehabilitation opportunities while targeting margin improvements above **3.45%** to rebuild backlog above **$70M** annually. Monitor project burn rates closely to align cash inflows with the extended contract durations.
 
JOBS LOW
  • State College Boulevard Street Rehabilitation
  • Fullerton
  • 9/24/26
  • FY 2026 27 Arteral Roadway Rehabilitation
  • Placentia
  • 8/28/26
  • 2026 2027 Street Rehabilitation
  • Yucaipa
  • 8/27/26
  • CIP No 101 M Citywide Pavement Rehabilitation
  • Laguna Hills
  • 7/30/26
  • 2025 26 Citywide Residential Overlay
  • Westminster
  • 7/23/26
  • Citywide Improvements
  • Perris
  • 7/7/26
  • San Miguel Drive Pavement Rehabilitation
  • Newport Beach
  • 6/25/26
  • Cedar Street Rehabilitation Occidental Street Edinger Avenue
  • Santa Ana
  • 6/11/26
  • MacArthur Boulevard Pavement Rehabilitation Median Improvements
  • Newport Beach
  • 5/5/26
  • FY 2026 Street Rehabilitation Program
  • San Clemente
  • 4/23/26
  • Taxiway F Realignment Reconstruction Long Beach Airport
  • Long Beach
  • 4/16/26
  • Lone Hill Avenue Street Rehabilitation
  • Glendora
  • 4/16/26
  • Raitt Street Protected Buffered Bike Lane Rehabilitation
  • Santa Ana
  • 4/9/26
  • 12-0V5304 Orange County Laguna Beach Route 73 From 0.2 Mile South Route 73/133 Separation Route 73/
  • Caltrans
  • 3/26/26
  • Aliso Viejo Parkway Pavement Rehabilitation Between Enterprise Aliso Creek Road
  • Aliso Viejo
  • 3/25/26
  • FY 2026 Local Street Improvement Program
  • San Clemente
  • 3/12/26
  • Industrial Street Repair Program
  • Santa Ana
  • 3/5/26
  • 2025 26 Overlay Slurry Seal Program M0164 Overlay B
  • Santa Clarita
  • 3/4/26
  • Arterial Pavement Preservation Program S El Camino Real W Ave Gaviota W Ave San Antonio
  • San Clemente
  • 2/19/26
  • 12-0V5004 Orange County Huntington Beach From Newland Street Goldenwest Street
  • Caltrans
  • 2/4/26
Bidjudge
JOBS BID
  • FY 2027 Major Street Maintenance
  • San Clemente
  • $439,931
  • 10/1/26
  • Sixth Street Roadway Improvements Project
  • Ontario
  • $2,399,119
  • 9/30/26
  • Arterial Street Rehabilitation
  • Diamond Bar
  • $5,789,189
  • 9/28/26
  • State College Boulevard Street Rehabilitation
  • Fullerton
  • $2,379,112
  • 9/24/26
  • Fy26-27 Residential Slurry Seal
  • South Pasadena
  • $383,162
  • 9/23/26
  • Readiness Road Rehabilitation
  • Victorville
  • $884,160
  • 9/23/26
  • Brea Senior Center Parking Lot Resurfacing
  • Brea
  • $133,835
  • 9/17/26
  • 2026 Citywide Pavement Preservation Maintenance
  • Victorville
  • $1,891,788
  • 9/10/26
  • FY 2026 27 Arteral Roadway Rehabilitation
  • Placentia
  • $1,382,812
  • 8/28/26
  • SB1 Citywide Pavement Rehabilitation CIP 2511
  • Hemet
  • $2,489,112
  • 8/27/26
  • FY 2026 27 Residential Roadway Rehabilitation
  • Placentia
  • $2,099,112
  • 8/27/26
  • 2026 2027 Street Rehabilitation
  • Yucaipa
  • $2,489,463
  • 8/27/26
  • CDBG Funded Grind Overlay FY27
  • Glendora
  • $309,648
  • 8/27/26
  • Bay Ave Sidewalk Improvements CDBG Fiscal Year 24 25
  • Moreno Valley
  • $1,862,360
  • 8/26/26
  • Citywide Slurry Seal FY 2026 27
  • Temecula
  • $2,441,130
  • 8/26/26
  • NO 1753 University Drive Pavement Rehabilitation Avalon Blvd Wilmington Ave
  • Carson
  • $4,755,134
  • 8/24/26
  • 2025 2026 CDBG Street Improvements Randolph Street Improvements
  • Riverside
  • $3,868,112
  • 8/20/26
  • Pavement Rehabilitation Slurry Seal Method Prospect Ave Poplar St Loma Linda Dr
  • Loma Linda
  • $138,927
  • 8/18/26
  • South Glendale Pavement Management Plan PMP
  • Glendale - CA
  • $8,286,235
  • 8/12/26
  • Main St Parking Lots Resurfacing Restriping
  • Santa Ana
  • $501,153
  • 8/7/26
  • Riverside Drive
  • San Bernardino County
  • $2,755,904
  • 8/6/26
  • Residential Resurfacing Phase II Paving Improvements
  • Azusa
  • $1,620,000
  • 8/5/26
  • 07-389104 Los Angeles County City Industry At Various Locations
  • Caltrans
  • $951,450
  • 8/4/26
  • 2026 Pavement Overlay CIP No ST022
  • San Marcos - CA
  • $2,248,170
  • 8/4/26
  • Jefferson Avenue Clinton Keith Road Pavement Rehabilitation
  • Murrieta
  • $5,245,383
  • 7/30/26
  • FY27 CDBG Street Resurfacing ADA Improvement
  • Pasadena - CA
  • $1,344,443
  • 7/30/26
  • Peyton Drive Pavement Rehabilitation
  • Chino Hills
  • $2,059,959
  • 7/30/26
  • CIP No 101 M Citywide Pavement Rehabilitation
  • Laguna Hills
  • $5,036,681
  • 7/30/26
  • Rehabilitation Resurfacing Newhope Street Ward Street Ellis Avenue Slater Avenue
  • Fountain Valley
  • $3,518,112
  • 7/23/26
  • 2025 26 Citywide Residential Overlay
  • Westminster
  • $2,942,027
  • 7/23/26
  • FY 2026 27 Annual Major Streets Rehabilitation Program Los Angeles Avenue First Street Erringer Roa
  • Simi Valley
  • $2,246,708
  • 7/21/26
  • Residential Streets Rehabilitation Zone 3 Phase II
  • Rialto
  • $2,538,522
  • 7/16/26
  • Residential Streets Rehabilitation Zone 3 Phase 1
  • Rialto
  • $1,833,908
  • 7/15/26
  • Slurry 2025 Various Locations Multi Year Contract
  • El Cajon
  • $1,531,037
  • 7/13/26
  • Asphalt Concrete Maintenance Services
  • Orange County
  • $3,060,870
  • 7/10/26
  • IFB 2026 08 Construction Street Rehabilitation Districts 2 3 Phase I
  • Pomona
  • $877,537
  • 7/7/26
  • Citywide Improvements
  • Perris
  • $6,198,886
  • 7/7/26
  • City Wide Street Rehabilitation Maintenance
  • Beaumont
  • $3,832,041
  • 7/7/26
  • Placing Slurry Seal On Various Streets
  • Bellflower
  • $780,897
  • 7/7/26
  • Candlewood Area Street Rehabilitation
  • Fullerton
  • $781,595
  • 7/2/26
  • 2025 26 Pavement Rehabilitation CIP 2516
  • Hemet
  • $605,080
  • 6/30/26
  • Citywide Resurfacing Reconstruction CIP 50106
  • Pico Rivera
  • $9,882,122
  • 6/30/26
  • Harbor Blvd Street Rehabilitation
  • Fullerton
  • $1,168,935
  • 6/30/26
  • San Miguel Drive Pavement Rehabilitation
  • Newport Beach
  • $2,668,112
  • 6/25/26
  • Pavement Rehabilitation Lawton Avenue New Jersey Street Prospect Avenue CIP 26 133
  • Loma Linda
  • $598,217
  • 6/24/26
  • 2026 Annual Street Maintenance
  • Malibu
  • $1,017,981
  • 6/18/26
  • South Palm Canyon Road Reconfiguration
  • Palm Springs
  • $2,556,768
  • 6/18/26
  • FY 2026 27 Annual Major Streets Rehabilitation Program Alamo St Erringer Rd Gage Ave CP60000018
  • Simi Valley
  • $648,965
  • 6/16/26
  • Cedar Street Rehabilitation Occidental Street Edinger Avenue
  • Santa Ana
  • $345,855
  • 6/11/26
  • ST260 Pavement Improvements Zone 1 Cypress Avenue
  • Chino
  • $881,892
  • 6/11/26
  • Knott Avenue Lincoln Avenue Artesia Boulevard 8th Street Rehabilitation
  • Buena Park
  • $5,064,664
  • 6/8/26
  • McFadden Ave Phase I Brookhurst St Bolsa Ave Phase II Street Improvement
  • Westminster
  • $3,739,339
  • 6/3/26
  • Raymond Avenue Rehabilitation
  • Fullerton
  • $1,426,307
  • 6/3/26
  • 2026 Residential Streets Rehabilitation
  • Garden Grove
  • $734,171
  • 6/2/26
  • 2026 Fall Pavement Rehabilitation
  • Ontario
  • $4,339,439
  • 6/1/26
  • Zone 4 Street Overlay Walkway Improvements
  • Laguna Beach
  • $739,293
  • 5/28/26
  • 08-1N6604 San Bernardino County Twentynine Palms From Athol Avenue Gopher Grove Lane
  • Caltrans
  • $3,898,849
  • 5/28/26
  • Fiscal Year 2026 27 Street Rehabilitation
  • Big Bear Lake
  • $2,209,161
  • 5/28/26
  • 2025 26 Citywide Slurry Seal CIP 2515
  • Hemet
  • $523,549
  • 5/26/26
  • Fiscal Year 2025 26 2026 27 Street Improvements
  • Agoura Hills
  • $1,295,154
  • 5/26/26
  • Canyon Hills North Slurry Seal
  • Lake Elsinore
  • $284,990
  • 5/26/26
  • Highway Safety Improvement Program HSIP Traffic Calming
  • Artesia
  • $1,223,023
  • 5/21/26
  • Local Street Preventative Maintenance FY 25 26
  • Santa Ana
  • $3,470,800
  • 5/21/26
  • CIP 107 Citywide Slurry Seal
  • Hermosa Beach
  • $354,455
  • 5/21/26
  • A Street Corridor Safety Improvements HSIPSL 5198 029
  • Perris
  • $796,501
  • 5/20/26
  • Sunny Hills Twilight E Las Palmas Area Street Rehabilitation
  • Fullerton
  • $2,792,580
  • 5/19/26
  • 2025 2026 Pavement Rehabilitation
  • Arcadia
  • $1,258,888
  • 5/19/26
  • Rehabilitation Resurfacing Euclid St Slater Ave Talbert Ave Talbert Ave Brookurst St Bushard St
  • Fountain Valley
  • $3,053,412
  • 5/14/26
  • FY 2025 26 Annual Minor Streets Rehabilitation Program Phase II Asphalt
  • Simi Valley
  • $2,094,464
  • 5/14/26
  • Pauba Road Pavement Rehabilitation
  • Temecula
  • $2,196,145
  • 5/14/26
  • Residential Roadway Rehabilitation 26002 Quadrant B4
  • Fountain Valley
  • $2,474,112
  • 5/13/26
  • Citywide Surface Treatment Package 4A 2
  • San Mateo
  • $1,488,485
  • 5/12/26
  • FY2026 Street Rehabilitation
  • West Hollywood
  • $1,274,914
  • 5/7/26
  • Pavement Rehabilitation Six Major Arterial Locations
  • San Bernardino County
  • $10,869,850
  • 5/6/26
  • RMDJOC6776 Pavement Preservation Seal Coats South Los Angeles County
  • Los Angeles County
  • $938,900
  • 5/5/26
  • MacArthur Boulevard Pavement Rehabilitation Median Improvements
  • Newport Beach
  • $7,099,118
  • 5/5/26
  • Arrow Highway Rehabilitation Traffic Signal Interconnect
  • Montclair
  • $5,489,809
  • 4/30/26
  • FY 25 26 Citywide Street Slurry Seal Asphalt Repair
  • Duarte
  • $193,120
  • 4/30/26
  • 2025 2026 Annual Slurry Seal
  • Arcadia
  • $827,730
  • 4/28/26
  • Apple Valley Runway 18 36 Taxiway Rehabilitation
  • San Bernardino County
  • $8,368,044
  • 4/28/26
  • Taxilane G Repairs
  • Ontario International Airport
  • $3,390,946
  • 4/27/26
  • 2025 26 Overlay C
  • Santa Clarita
  • $1,998,554
  • 4/27/26
  • FY 2026 Street Rehabilitation Program
  • San Clemente
  • $942,731
  • 4/23/26
  • 2026 Slurry Seal
  • Patterson
  • $528,618
  • 4/22/26
  • Citywide Pavement Rehabilitation Program Fiscal Year FY 2025 26
  • Moreno Valley
  • $4,998,112
  • 4/21/26
  • 12-0V5204 Orange County Garden Grove From Magnolia Street Undercrossing Euclid Street Undercrossing
  • Caltrans
  • $1,779,250
  • 4/21/26
  • Intersection Capacity Improvements Palos Verdes Drive North Dapplegray School Entrance
  • Rolling Hills Estates
  • $13,304,404
  • 4/17/26
  • 08-1K6304 San Bernardino County San Bernardino From 29th Street 0.2 Mile South Old Waterman Canyon
  • Caltrans
  • $4,446,520
  • 4/16/26
  • Comprehensive Pavement Rehabilitation High Maintenance Segments
  • Fontana
  • $2,555,268
  • 4/16/26
  • Taxiway F Realignment Reconstruction Long Beach Airport
  • Long Beach
  • $22,666,250
  • 4/16/26
  • Lone Hill Avenue Street Rehabilitation
  • Glendora
  • $1,550,040
  • 4/16/26
  • Heather Ridge Road Bike Lane
  • Laguna Niguel
  • $243,108
  • 4/13/26
  • FY 2025 26 Annual Major Streets Rehabilitation Program Madera Road Cochran Street Easy Street
  • Simi Valley
  • $469,514
  • 4/9/26
  • VoH Liberty Loop Patching Pavement Rehabilitation
  • Fontana
  • $3,160,130
  • 4/9/26
  • Raitt Street Protected Buffered Bike Lane Rehabilitation
  • Santa Ana
  • $7,848,499
  • 4/9/26
  • 4327 Almond Avenue Collins Avenue Street Improvements
  • Orange
  • $1,798,660
  • 4/9/26
  • Residential Street Rehabilitation Cycle 2 Phase 5
  • Redondo Beach
  • $3,871,318
  • 4/8/26
  • McFadden Avenue Rehabilitation
  • Santa Ana
  • $1,768,667
  • 4/7/26
  • Firethorne Area Street Rehabilitation
  • Fullerton
  • $2,068,489
  • 4/7/26
  • Catawba Avenue Safe Routes Sschool
  • Fontana
  • $961,202
  • 4/2/26
  • Pacific Wanda Louise Walnut Area Street Rehabilitation
  • Fullerton
  • $607,761
  • 4/1/26
  • 12-0V5304 Orange County Laguna Beach Route 73 From 0.2 Mile South Route 73/133 Separation Route 73/
  • Caltrans
  • $1,644,076
  • 3/26/26
  • Cedarbrook Pavement Rehabilitation Between Glenwood Drive Aliso Viejo Parkway
  • Aliso Viejo
  • $898,144
  • 3/26/26
  • Palm Street Area Rehabilitation
  • Fullerton
  • $2,188,112
  • 3/26/26
  • First Avenue Rehabilitation
  • Arcadia
  • $1,718,118
  • 3/26/26
  • Aliso Viejo Parkway Pavement Rehabilitation Between Enterprise Aliso Creek Road
  • Aliso Viejo
  • $1,658,458
  • 3/25/26
  • Baker Avenue Rehabilitation
  • Fullerton
  • $572,970
  • 3/25/26
  • FY 24 25 Citywide Street Resurfacing
  • Stanton
  • $494,499
  • 3/25/26
  • FY 2025 26 Annual Major Streets Rehabilitation Program Tapo Canyon Rd Township Ave Avenida Simi
  • Simi Valley
  • $422,850
  • 3/24/26
  • Annual Alley Improvements FY25 26
  • Lynnwood
  • $754,847
  • 3/23/26
  • FY 2025 26 Street Improvements Program
  • Chino Hills
  • $2,169,629
  • 3/19/26
  • Annual Citywide Street Resurfacing ADA Improvement Program FY 2026
  • Pasadena - CA
  • $8,566,007
  • 3/19/26
  • Street Preservation Local Citywide FY 25 26 Worktag 68598
  • Pomona
  • $3,198,118
  • 3/16/26
  • FY 2026 Local Street Improvement Program
  • San Clemente
  • $571,934
  • 3/12/26
  • Industrial Street Repair Program
  • Santa Ana
  • $4,639,879
  • 3/5/26
  • Los Alisos Pavement Rehab
  • Rancho Santa Margarita
  • $539,935
  • 3/5/26
  • Santa Margarita Parkway Pavement Rehab
  • Rancho Santa Margarita
  • $995,589
  • 3/5/26
  • FY24 25 SR710 LATIP SB 1 Street Rehabilitation
  • Alhambra
  • $1,447,120
  • 3/5/26
  • On Call Street Rehabilitation Slurry Seal Contract
  • Irvine
  • $23,432,068
  • 3/5/26
  • Slurry Seal Program FY 2025 26
  • Newport Beach
  • $1,593,390
  • 3/5/26
  • Blake Street Other Roads Phase 1
  • San Bernardino County
  • $5,634,923
  • 3/5/26
  • FY 25 26 Annual Slurry Seal
  • Rancho Santa Margarita
  • $449,910
  • 3/5/26
  • 2025 26 Overlay Slurry Seal Program M0164 Overlay B
  • Santa Clarita
  • $1,898,545
  • 3/4/26
  • 2025 26 Overlay A
  • Santa Clarita
  • $8,114,939
  • 3/3/26
  • Business Area Road Improvements
  • Santa Ana
  • $1,169,726
  • 2/25/26
  • FY 25 26 Street Rehabilitation
  • Duarte
  • $996,771
  • 2/23/26
  • Arterial Pavement Preservation Program S El Camino Real W Ave Gaviota W Ave San Antonio
  • San Clemente
  • $332,218
  • 2/19/26
  • Esplanade Avenue Widening Phase 1 Warren Road Sanderson Avenue
  • San Jacinto
  • $9,070,045
  • 2/19/26
  • E Santa Fe Parking Lot Rehabilitation
  • Fullerton
  • $379,496
  • 2/12/26
  • Street Pavement Repair Program FY 2025 26
  • Newport Beach
  • $1,344,720
  • 2/10/26
  • FY24 25 Residential Street Rehabilitation
  • West Covina
  • $3,472,112
  • 2/9/26
  • Montecito Drive Transit Access Improvements (REBID)
  • Chino Hills
  • $678,493
  • 2/5/26
  • FY 2026 As Needed Street Improvement Program Pavement Repairs
  • San Clemente
  • $681,407
  • 2/5/26
  • Civic Center Rehabilitation Bristol Shelton
  • Santa Ana
  • $424,915
  • 2/5/26
  • 12-0V5004 Orange County Huntington Beach From Newland Street Goldenwest Street
  • Caltrans
  • $2,813,978
  • 2/4/26
  • Whitewater Neighborhood Road Improvement Fiscal Year 2025 2026
  • Cathedral City
  • $889,262
  • 2/4/26
  • 2025 CDBG Residential Street Overlay
  • Westminster
  • $778,218
  • 2/3/26
  • 2026 Spring CDBG Maintenance Slurry Seal Pavement Management
  • Ontario
  • $665,283
  • 1/29/26
  • 12-0V5104 Orange County Irvine Orange At Various Locations
  • Caltrans
  • $589,794
  • 1/27/26
  • Commercial Street Improvement DInard Ave Maryton Ave Marquardt Ave Park Street Pike St
  • Santa Fe Springs
  • $2,457,917
  • 1/22/26
  • Citywide Pavement Rehabilitation
  • Fontana
  • $4,784,399
  • 1/22/26
  • Old Waterman Canyon Road Other Roads
  • San Bernardino County
  • $1,049,261
  • 1/22/26
  • 2026 Pavement Slurry Program MI 2661 MI 2626
  • Thousand Oaks
  • $2,765,482
  • 1/21/26
  • 2026 Pavement Overlay Resurfacing Program
  • Thousand Oaks
  • $14,997,453
  • 1/21/26
  • 12-0S5204 Orange County Orange At 0.2 Mile East Main Street Overcrossing
  • Caltrans
  • $877,430
  • 1/21/26
  • Grand Avenue Rehabilitation Edinger Avenue McFadden Avenue 23-6700
  • Santa Ana
  • $1,139,119
  • 1/9/26
  • FY 2026 Major Street Maintenance FY 2026 Pavement Preservation Program
  • San Clemente
  • $1,199,242
  • 1/8/26
  • 2024 25 Citywide Slurry Seal CIP 2410
  • Hemet
  • $810,060
  • 1/7/26
  • Pavement Rehabilitation Auto Plaza Drive
  • Loma Linda
  • $409,886
  • 1/6/26
  • MLK JR Street Improvements Main Street Avalon Boulevard
  • Carson
  • $5,437,793
  • 1/5/26
Bidjudge
CASH FLOW
  • MLK JR Street Improvements Main Street Avalon Boulevard
  • Laguna Hills
  • $5,036,681
  • 09/28/26
  • 120
  • 11.7%
  • $1,259,170
  • $4,449,068
  • MLK JR Street Improvements Main Street Avalon Boulevard
  • Westminster
  • $2,942,027
  • 09/21/26
  • 120
  • 18.3%
  • $735,507
  • $2,402,655
  • MLK JR Street Improvements Main Street Avalon Boulevard
  • Perris
  • $6,198,886
  • 09/05/26
  • 43
  • 86.0%
  • $4,324,804
  • $864,961
  • MLK JR Street Improvements Main Street Avalon Boulevard
  • Newport Beach
  • $2,668,112
  • 08/24/26
  • 70
  • 71.4%
  • $1,143,477
  • $762,318
  • MLK JR Street Improvements Main Street Avalon Boulevard
  • Newport Beach
  • $7,099,118
  • 07/04/26
  • 180
  • 56.1%
  • $1,183,186
  • $3,115,724
  • MLK JR Street Improvements Main Street Avalon Boulevard
  • Long Beach
  • $22,666,250
  • 06/15/26
  • 120
  • 99.2%
  • $5,666,563
  • $188,885
  • MLK JR Street Improvements Main Street Avalon Boulevard
  • Santa Ana
  • $7,848,499
  • 06/08/26
  • 170
  • 74.1%
  • $1,385,029
  • $2,031,376
  • MLK JR Street Improvements Main Street Avalon Boulevard
  • Long Beach
  • $904,904
  • 11/20/16
  • 32767
  • 11.0%
  • $828
  • $805,126
  • $15,698,564
  • $20,871,500
Bidjudge