- Granite Construction - AZ
- 2026
- 49
- 10
- 20.41%
- $52,626,649
- 5.21%
- 23.12%
- 7.42%
- $337,012,038
- Granite Construction - CA
- 2026
- 194
- 25
- 12.89%
- $142,792,796
- 5.20%
- 20.80%
- 10.15%
- $1,806,692,346
- Granite Construction - NV
- 2026
- 8
- 0
- 0.00%
- $0
- 0.00%
- 31.71%
- 11.46%
- $248,358,873
- Granite Construction - UT
- 2026
- 41
- 3
- 7.32%
- $5,763,482
- 2.40%
- 22.32%
- 9.28%
- $223,363,545
- Granite Construction - TX
- 2026
- 16
- 1
- 6.25%
- $10,965,650
- 4.77%
- 46.66%
- 22.10%
- $764,771,227
- Granite Construction - WA
- 2026
- 93
- 9
- 9.68%
- $22,916,302
- 9.70%
- 23.53%
- 8.39%
- $347,193,948
- Granite Construction - OR
- 2026
- 37
- 5
- 13.51%
- $8,107,084
- 6.28%
- 33.42%
- 14.67%
- $69,997,264
- Granite Construction - FL
- 2026
- 9
- 1
- 11.11%
- $6,294,664
- 6.29%
- 32.35%
- 10.24%
- $161,304,897

Granite Construction enters the period with a **$93.7M** remaining backlog from 20 low-bid awards concentrated in Q2 2026, supporting steady cash inflows as mobilization begins on projects averaging multi-year durations. Recent success rate of 15.5% on **$1.28B** in bids indicates consistent but selective wins that should sustain operations through year-end without immediate liquidity pressure.
Medium-term Outlook (6-12 months)
Execution of the **$93.7M** backlog will continue to generate revenue, though the 2026 win rate decline from 17% in 2024 signals potential slowdown in replenishment if bidding volume remains at 161 jobs. Cash flow stability hinges on converting a portion of the **$142.8M** 2026 low-bid total into new backlog before existing contracts wind down.
Key Risk Period
The 9-15 month window following depletion of the current **$93.7M** backlog represents the primary risk, as sustained 15.5% success rates may not offset the **$429.7M** prior-year award levels if market competition intensifies or margins compress below the 5.2% average left on low bids.
Recommendations
Prioritize targeted bidding on higher-margin paving and drainage packages to lift the success rate above 16% while actively managing the long-duration contracts to accelerate cash collections. Monitor monthly burn rate against the **$93.7M** backlog to trigger contingency bidding surges by Q4 2026.
- Capital Pavement Program Preservation Overlay
- Ukiah
- 6/23/26
- Reap 2 0 Drainage Improvements
- Palm Desert
- 6/23/26
- Abbott Street Sanitary Sewer Pavement Improvements
- Salinas
- 6/2/26
- Agricultural Road Crossing No 4 Fish Passage Tule Canal Yolo Bypass
- Department of Water Resources
- 5/27/26
- Willow Avenue Street Improvements
- Clovis
- 5/26/26
- California Redwood Coast Humboldt County Airport Relocate Taxiway A Taxiway A Lighting
- Humboldt County
- 5/21/26
- 25 025 Package 1 Roads Program CIP
- Turlock
- 5/8/26
- 05-1R7704 Monterey County San Lucas From 0.1 Mile West Route 101/198 Separation 0.9 Mile East Free
- Caltrans
- 5/7/26
- 05-1K0104 Monterey County Near Lucia At 0.4 Mile South Big Creek Bridge
- Caltrans
- 5/6/26
- Improvements Lampson Field Airport
- Lake County
- 5/5/26
- 10-1S7704 Mariposa County Near Bootjack At Various Locations
- Caltrans
- 4/30/26
- Taxilane G Repairs
- Ontario International Airport
- 4/27/26
- FY 25 26 South Central County Pavement Rehabilitation 1st 2nd 3rd Supervisorial Districts
- Santa Barbara County
- 4/24/26
- North GA Ramp Reconstruction
- Napa County
- 4/23/26
- 06-1E4204 Tulare County Orosi At Avenue 416
- Caltrans
- 4/16/26
- AC Overlay 2026 Phase B
- Sacramento County
- 4/16/26
- 05-1R7604 San Luis Obispo County Creston From 0.1 Mile South Rocky Canyon Road Route 229/41 Separat
- Caltrans
- 4/9/26
- Avenal Cutoff SB 1 Roadway Improvements Phase III
- Kings County
- 4/2/26
- 2026 Streets Overlay
- El Centro
- 2/26/26
- 06-1H9304 Kern County Buttonwillow From 1.2 Miles South Route 5/43 Separation 0.1 Mile South Kern R
- Caltrans
- 2/25/26
- Esplanade Avenue Widening Phase 1 Warren Road Sanderson Avenue
- San Jacinto
- 2/19/26
- 05-1S6104 San Luis Obispo County About 26 Miles East Santa Maria From Cuyama River Bridge 0.3 Mile
- Caltrans
- 2/19/26
- 06-1H9704 Madera County Near Chowchilla From Route 59/152 Separation 0.1 Mile West Route 99/152 S
- Caltrans
- 2/3/26
- 03-0J4004 El Dorado County Placerville From 0.1 Mile West Carson Road Overcrossing 5 Mile Road 1.0
- Caltrans
- 1/14/26
- 06-1F7504 Tulare County At Pixley Davis Street Overcrossing East Court Avenue Overcrossing
- Caltrans
- 1/6/26
- Street Improvements 2024 2025 Gosford Road Panama Lane Berkshire Road
- Bakersfield
- $443,849
- 8/6/26
- CP26 405 Bob Hope Pavement Rehab
- Rancho Mirage
- $412,000
- 8/5/26
- Cass El Dorado Street Curb Ramp Road Rehabilitation CIP2604C
- Monterey
- $2,100,890
- 8/4/26
- Shaw Avenue Widening Phase 2
- Clovis
- $8,426,225
- 8/4/26
- Mission Canyon Road Storm Repairs DR4683 DR4769 1st Supervisorial District
- Santa Barbara County
- $2,231,563
- 7/31/26
- 02-2K0004 Shasta County Near Shasta From 0.4 Mile West Whiskey Creek Road 0.1 Mile East Lake Vista
- Caltrans
- $97,999,241
- 7/30/26
- Peyton Drive Pavement Rehabilitation
- Chino Hills
- $2,635,000
- 7/30/26
- 25STM3 1N27 Foothill Bridge Storm Repair 1st Supervisorial District
- Santa Barbara County
- $682,670
- 7/30/26
- 11-431854 San Diego County Near Fallbrook From 0.7 Mile 0.1 Mile South Mission Road Overcrossing
- Caltrans
- $1,444,213
- 7/23/26
- Entrada Way Culvert Slip Out Bank Stabilization
- San Mateo County
- $2,565,719
- 7/23/26
- El Camino Real Highway 41 Rehabilitation
- Atascadero
- $598,690
- 7/23/26
- Willow Keyes Corridor Improvements Federal No ATPL 5005 173
- San Jose
- $14,473,128
- 7/23/26
- 08-1N6104 Riverside County Corona From 0.2 Mile North Ontario Avenue Undercrossing Old Temescal Ro
- Caltrans
- $6,072,000
- 7/22/26
- Cemetery Pavement Preservation
- Monterey
- $363,747
- 7/21/26
- California Baker Street Reconstruction PW 26 04
- Coalinga
- $1,018,456
- 7/21/26
- ENG 41EG2020 Point Reyes Petaluma Nicasio Valley Road Turn Pocket
- Marin County
- $1,516,782
- 7/20/26
- Sierra College Blvd I 80 Resurfacing
- Rocklin
- $2,587,693
- 7/16/26
- Sunset Whitney Connector Bridge
- Rocklin
- $1,298,620
- 7/16/26
- Grove Street Neighborhood Plan Implementation Complete Streets No ST007
- Healdsburg
- $4,788,050
- 7/16/26
- 10-1K6204 Merced County Merced At Gerard Avenue
- Caltrans
- $3,885,420
- 7/16/26
- Residential Streets Rehabilitation Zone 3 Phase II
- Rialto
- $3,088,000
- 7/16/26
- 12-0K9704 Orange Riverside Counties Route 241 From 0.1 Mile South Santiago Creek Bridge Route 91 R
- Caltrans
- $296,120,407
- 7/16/26
- Road Rehabilitation Palm Avenue Jenkins Road
- Kern County
- $3,093,483
- 7/15/26
- Measure O 2026 Road Maintenance Surfacing Project Bald Hills Road
- Humboldt County
- $1,404,375
- 7/14/26
- 550 Wall Road Landslide Repairs
- Napa County
- $865,200
- 7/14/26
- West Side Road Repairs
- Paso Robles
- $3,264,348
- 7/9/26
- Rehabilitation Taxiway Alpha
- Paso Robles
- $4,040,995
- 7/9/26
- Avenue 53 Tot Lot Roundabout Improvements
- Coachella
- $2,004,000
- 7/9/26
- Shaw Ave Roadway Improvements Fruit Ave Palm Ave (REBID)
- Fresno
- $1,839,846
- 7/7/26
- Citywide Improvements
- Perris
- $7,012,543
- 7/7/26
- Mt Veeder Road MPM 4 3 MPM 3 25
- Napa County
- $1,549,756
- 7/7/26
- 07-354204 Los Angeles County Malibu From 0.1 Mile West Serra Road Ventura County LINE
- Caltrans
- $42,272,323
- 7/2/26
- Tajiguas Access Road Extension Site Improvements 2026
- Santa Barbara County
- $957,172
- 7/2/26
- Chrisman Road Resurfacing
- San Joaquin County
- $3,329,435
- 6/25/26
- C0724 Coyote Creek Flood Protection
- Santa Clara Valley WD
- $148,249,474
- 6/24/26
- Capital Pavement Program Preservation Overlay
- Ukiah
- $870,470
- 6/23/26
- Reap 2 0 Drainage Improvements
- Palm Desert
- $882,262
- 6/23/26
- Monterey Avenue Street Rehabilitation
- Palm Desert
- $2,302,178
- 6/23/26
- Neighborhood Street Resurfacing Cal Gisler
- Oxnard
- $4,876,693
- 6/23/26
- Herndon Avenue Street Improvements
- Clovis
- $1,488,643
- 6/23/26
- South Palm Canyon Road Reconfiguration
- Palm Springs
- $2,618,105
- 6/18/26
- FY 25 26 Surface Treatment Overlay MD 10 MD 13
- Madera County
- $2,481,055
- 6/17/26
- Storm Damage Repair Alderpoint Road F6B165 PM 7 90 81 5
- Humboldt County
- $1,201,484
- 6/16/26
- Citrus Redlands Connectivity
- Perris
- $708,000
- 6/15/26
- Wyda Way Sidewalk Improvements
- Sacramento County
- $1,198,688
- 6/11/26
- Higuera Corridor Complete Streets
- San Luis Obispo
- $12,636,081
- 6/11/26
- ST260 Pavement Improvements Zone 1 Cypress Avenue
- Chino
- $1,117,111
- 6/11/26
- Road Rehabilitation College Avenue Mount Vernon Avenue Montello Street
- Kern County
- $3,314,119
- 6/10/26
- Road Rehabilitation Columbus Street Loma Linda Drive Berkeley Street
- Kern County
- $876,180
- 6/10/26
- Schnoor Ave Sidewalk Construction City No R 58 CMAQ CML 5157 123
- Madera
- $646,011
- 6/9/26
- California Street Redlands Boulevard Intersection Widening
- Redlands
- $6,682,866
- 6/4/26
- Valley View Water Consolidation
- Coachella Valley Water District
- $19,343,439
- 6/4/26
- Pavement Rehabilitation 2025 2026 SB1 Hageman Road Old Farm Rd Calloway Dr Coffee Rd Knudsen Dr
- Bakersfield
- $8,804,974
- 6/4/26
- Citywide Curb Ramp Improvement FY 26
- Monterey
- $2,055,500
- 6/2/26
- Abbott Street Sanitary Sewer Pavement Improvements
- Salinas
- $13,114,821
- 6/2/26
- 10-1M2304 San Joaquin County French Camp At Mathews Road Undercrossing
- Caltrans
- $7,808,624
- 6/2/26
- 04-2X8104 Sonoma County Graton Sebastopol From Guerneville Road Cooper Road
- Caltrans
- $1,611,195
- 5/28/26
- 04-2X7904 Santa Clara County Gilroy From Santa Clara County LINE 0.3 Mile West Santa Teresa Boule
- Caltrans
- $1,085,913
- 5/28/26
- 08-1N6604 San Bernardino County Twentynine Palms From Athol Avenue Gopher Grove Lane
- Caltrans
- $3,892,609
- 5/28/26
- Pavement Rehabilitation 2025 2026 SB1
- Bakersfield
- $5,751,666
- 5/28/26
- Fiscal Year 2026 27 Street Rehabilitation
- Big Bear Lake
- $1,833,000
- 5/28/26
- 01-0L2204 Lake County From 0.2 Mile South C Street Road 141s 0.1 Mile North C Street Road 141s
- Caltrans
- $1,760,972
- 5/27/26
- Agricultural Road Crossing No 4 Fish Passage Tule Canal Yolo Bypass
- Department of Water Resources
- $4,029,851
- 5/27/26
- Willow Avenue Street Improvements
- Clovis
- $1,069,838
- 5/26/26
- California Redwood Coast Humboldt County Airport Relocate Taxiway A Taxiway A Lighting
- Humboldt County
- $12,384,494
- 5/21/26
- 04-2X7104 Solano County Dixon Route 80 At Pedrick Road Overcrossing Route 113 From Route 12 0.3 Mil
- Caltrans
- $1,210,995
- 5/20/26
- Roseville Parkway Widening Phase 1
- Roseville
- $4,022,000
- 5/19/26
- City Fresno Pave More Now Bid Package B2
- Fresno
- $15,643,084
- 5/19/26
- Hanford Airport Apron Reconstruction
- Hanford
- $2,800,040
- 5/14/26
- Taxiways E A3 A5 Pavement Reconstruction
- Santa Barbara County
- $12,592,657
- 5/14/26
- 08-0P0504 Riverside County Corona From Orange County LINE Route 15/91 Separation
- Caltrans
- $3,573,041
- 5/14/26
- Commerce Way Rehabilitation
- Paso Robles
- $1,247,083
- 5/14/26
- 2026 Pavement Rehabilitation
- Palm Springs
- $10,638,537
- 5/14/26
- Pauba Road Pavement Rehabilitation
- Temecula
- $2,783,872
- 5/14/26
- Merced Street Reconnection
- Fresno
- $1,441,010
- 5/12/26
- 01-0P5704 Mendocino County At Various Locations
- Caltrans
- $1,124,273
- 5/12/26
- 25 025 Package 1 Roads Program CIP
- Turlock
- $3,462,283
- 5/8/26
- 09-428604 Kern County Tehachapi From Summit Overhead 0.3 Mile East Summit Overhead
- Caltrans
- $703,687
- 5/7/26
- 05-1R7704 Monterey County San Lucas From 0.1 Mile West Route 101/198 Separation 0.9 Mile East Free
- Caltrans
- $4,049,375
- 5/7/26
- Storey Road Shoulder Paving City
- Madera
- $407,481
- 5/7/26
- Liberty Road Improvements 2026
- San Joaquin County
- $4,510,776
- 5/7/26
- 05-1K0104 Monterey County Near Lucia At 0.4 Mile South Big Creek Bridge
- Caltrans
- $9,974,339
- 5/6/26
- Pavement Rehabilitation Six Major Arterial Locations
- San Bernardino County
- $11,958,000
- 5/6/26
- 05-1R4404 San Luis Obispo County San Luis Obispo At Highland Drive
- Caltrans
- $1,726,587
- 5/6/26
- Improvements Lampson Field Airport
- Lake County
- $1,785,589
- 5/5/26
- Citywide Road Surface Repair FY26
- Monterey
- $4,174,330
- 5/5/26
- 10-1S7704 Mariposa County Near Bootjack At Various Locations
- Caltrans
- $1,623,491
- 4/30/26
- County Road 35 Bridge Replacement Wilson Creek
- Glenn County
- $4,720,725
- 4/30/26
- County Road 35 Bridge Replacement Walker Creek
- Glenn County
- $5,157,157
- 4/30/26
- 07-286304 Los Angeles County Llano Route 138 From 0.4 Mile West 190th Street East 0.7 Mile South 13
- Caltrans
- $34,415,415
- 4/28/26
- 09-428804 Inyo County At Little Lake From 1.2 Miles South Little Lake Road 1.2 Miles South Cinder
- Caltrans
- $3,139,062
- 4/28/26
- 05-1K0204 Monterey County Near Gorda From 0.8 Mile North Alder Creek Bridge 1.2 Miles North Alder
- Caltrans
- $4,442,989
- 4/28/26
- Taxilane G Repairs
- Ontario International Airport
- $2,373,510
- 4/27/26
- 2025 26 Overlay C
- Santa Clarita
- $2,136,535
- 4/27/26
- FY 25 26 South Central County Pavement Rehabilitation 1st 2nd 3rd Supervisorial Districts
- Santa Barbara County
- $4,727,838
- 4/24/26
- AC Overlay 2026 Phase C
- Sacramento County
- $7,387,790
- 4/23/26
- 04-2Q5004 Marin County Near Novato At Petaluma River Bridge
- Caltrans
- $27,809,285
- 4/23/26
- CIP 2295 17 Measure K 14 Street Rehabilitation Repair
- Grover Beach
- $2,925,739
- 4/23/26
- Santa Claus Lane Streetscape Coastal Access Improvements Phase 2
- Santa Barbara County
- $10,997,689
- 4/23/26
- Creston Road Corridor Improvements Phase 2
- Paso Robles
- $13,549,918
- 4/23/26
- North GA Ramp Reconstruction
- Napa County
- $3,011,143
- 4/23/26
- Miles Avenue Pavement Rehabilitation
- La Quinta
- $2,972,520
- 4/23/26
- McKinley Blythe Complete Streets
- Fresno
- $3,274,493
- 4/21/26
- 01-0P5304 Lake County At Clearlake Riviera From 0.2 Mile West Inca Way Route 29
- Caltrans
- $1,928,733
- 4/21/26
- 09-392304 Mono County Near Bridgeport From 0.1 Mile North Route 395 0.2 Mile North East Walker Rive
- Caltrans
- $7,357,972
- 4/21/26
- Cottonwood Creek Sewer Improvements
- Encinitas
- $1,691,632
- 4/21/26
- Pedestrian Improvements Western Ave Main Street Hwy 86
- Brawley
- $225,000
- 4/20/26
- AC Overlay 2026 Phase B
- Sacramento County
- $13,958,767
- 4/16/26
- Rohnerville Airport Rehabilitate Runway 11 29
- Humboldt County
- $3,483,298
- 4/16/26
- 06-1E4204 Tulare County Orosi At Avenue 416
- Caltrans
- $833,290
- 4/16/26
- Taxiway F Realignment Reconstruction Long Beach Airport
- Long Beach
- $27,966,186
- 4/16/26
- 06-1A4704 Kern County Shafter From 0.2 Mile South Los Angeles Avenue 0.2 Mile North Los Angeles Ave
- Caltrans
- $8,090,665
- 4/15/26
- 06-1H9104 Madera County At Various Locations
- Caltrans
- $547,336
- 4/15/26
- 08-1N8104 San Bernardino County Needles From 3.2 Miles East West Junction Route 95 0.1 Mile East E
- Caltrans
- $7,314,000
- 4/15/26
- 03-3G6104 Yolo County At Zamora From 0.1 Mile South Adams Creek Bridge 0.2 Mile North Route 505/5 S
- Caltrans
- $5,631,800
- 4/14/26
- 06-1H9004 Fresno County At Various Locations
- Caltrans
- $741,883
- 4/14/26
- FY 25 26 Sunny Sands Neighborhood Cathedral Canyon Drive Pavement Rehabilitation
- Cathedral City
- $1,249,000
- 4/10/26
- AC Overlay 2026 Phase A
- Sacramento County
- $12,064,330
- 4/9/26
- Fair Oaks Boulevard Bicycle Pedestrian Mobility Phase 2
- Sacramento County
- $9,930,200
- 4/9/26
- SJC New Taxiway Victor Phase 3A
- San Jose
- $15,355,964
- 4/9/26
- 06-1E2304 Madera County Near Madera County Road 29 From 0.1 Mile Northwest Avenue 12 0.4 Mile Sou
- Caltrans
- $961,300
- 4/9/26
- 05-1R7604 San Luis Obispo County Creston From 0.1 Mile South Rocky Canyon Road Route 229/41 Separat
- Caltrans
- $1,561,987
- 4/9/26
- Extension Imperial Ave Danenberg Dr Manuel Ortiz Ave Phase III STPL 5169 063
- El Centro
- $3,564,038
- 4/9/26
- 03-3G7604 El Dorado County Near Cool From North Junction Route 49 0.2 Mile West Sliger Mine Road
- Caltrans
- $3,174,097
- 4/7/26
- 07-364904 Los Angeles County Near Lancaster Route 138 From 0.1 Mile West 0.2 Mile East 60th Street
- Caltrans
- $10,306,889
- 4/7/26
- 10-1S6304 Merced County Merced Livingston At Various Locations
- Caltrans
- $3,775,656
- 4/2/26
- Avenal Cutoff SB 1 Roadway Improvements Phase III
- Kings County
- $6,126,214
- 4/2/26
- Lower Beach Lake Berm Seepage Mitigation
- Sacramento
- $1,445,737
- 4/1/26
- Paving 2026
- Solano County
- $1,895,035
- 4/1/26
- Cedar Ave Roadway Improvements Herndon Ave Alluvial Ave
- Fresno
- $1,634,818
- 3/31/26
- Fremont Avenue Improvement
- Montclair
- $3,537,000
- 3/31/26
- 04-2X7404 Santa Clara County Near Los Gatos From Santa Clara County Line 0.1 Mile North Hebard Road
- Caltrans
- $3,720,600
- 3/26/26
- 03-3G7504 Butte County At Butte Valley From Route 70 Separation 0.2 Mile South Durham Pentz Road Fr
- Caltrans
- $4,576,604
- 3/26/26
- Safer Access Pajaro Valley High School Beyond
- Wilsonville
- $579,760
- 3/25/26
- 03-3G7804 Yuba County At Olivehurst From Route 65/70 Separation Yuba River Bridge
- Caltrans
- $4,241,512
- 3/25/26
- Road 225 Bike Pedestrian Transit Improvement North Fork
- Madera County
- $1,149,539
- 3/25/26
- Terminal Loop Road Rehabilitation BFL
- Kern County
- $1,320,300
- 3/25/26
- 06-1H9204 Fresno County Mendota From Belmont Avenue 0.3 Mile West Yuba Avenue
- Caltrans
- $1,393,091
- 3/24/26
- FY 2025 26 Street Improvements Program
- Chino Hills
- $2,245,592
- 3/19/26
- CIP T 5 Fryer Creek Drive Pickett Street Nash Street Pavement Rehab 2601
- Sonoma
- $598,227
- 3/19/26
- HSIP Cycle 11 Safety Improvements
- Kings County
- $828,164
- 3/19/26
- Livermore Community Park Phase V
- Folsom
- $1,399,827
- 3/18/26
- 10-1U0604 Stanislaus County Patterson From 1.1 Miles North Main Canal Bridge 0.2 Mile South Sperry
- Caltrans
- $3,656,688
- 3/18/26
- 06-1H9904 Tulare County Near Delano From Kern County Line 0.1 Mile South Avenue 56
- Caltrans
- $2,006,581
- 3/18/26
- 10-1U0804 Merced County At Santa Nella From 0.1 Mile North Mccabe Road The Intersection Sullivan Ro
- Caltrans
- $3,579,115
- 3/17/26
- 06-1H9504 Kern County Near Wheeler Ridge From 0.1 Mile North Route 5/99 Separation 0.2 Mile South O
- Caltrans
- $4,203,736
- 3/17/26
- Storm Damage Repair Alderpoint Road F6B165 PM 42 00 42 30
- Humboldt County
- $3,367,348
- 3/17/26
- 41st Avenue Multimodal Improvements Pavement Rehabilitation
- Capitola
- $1,896,271
- 3/16/26
- 2025 Albany St High St Princeton St Pavement Resurfacing Rehabilitation
- Delano
- $851,908
- 3/12/26
- 2026 Pavement Maintenance Pavement Repairs
- Elk Grove
- $1,935,007
- 3/12/26
- Cathedral Canyon Drive Sidewalk Improvement Between Paseo Azulejo Kiely Road
- Cathedral City
- $131,000
- 3/11/26
- 2026 DOT SLT Road Maintenance Pavement Rehabilitation
- El Dorado County
- $3,456,543
- 3/10/26
- Calistoga Road Pavement Rehabilitation Utility Improvements Montecito Boulevard Highway 12
- Santa Rosa
- $16,660,837
- 3/10/26
- 06-1J0304 Tulare Fresno County From Avenue 280 0.4 Mile North Bethel Avenue
- Caltrans
- $691,634
- 3/10/26
- 2025 26 Overlay Slurry Seal Program M0164 Overlay B
- Santa Clarita
- $3,603,316
- 3/4/26
- 2026 Streets Overlay
- El Centro
- $3,231,000
- 2/26/26
- 06-1H9304 Kern County Buttonwillow From 1.2 Miles South Route 5/43 Separation 0.1 Mile South Kern R
- Caltrans
- $4,637,585
- 2/25/26
- New Hope Road Bridge Grizzly Slough Replacement
- Sacramento County
- $5,072,524
- 2/19/26
- 23 068 Bid Package 3 Roads Program CIP
- Turlock
- $5,739,766
- 2/19/26
- 05-1S6104 San Luis Obispo County About 26 Miles East Santa Maria From Cuyama River Bridge 0.3 Mile
- Caltrans
- $2,866,777
- 2/19/26
- Esplanade Avenue Widening Phase 1 Warren Road Sanderson Avenue
- San Jacinto
- $8,083,808
- 2/19/26
- 06-0W81U4 Kern County Delano From Fremont Street 0.1 Mile West Browning Road
- Caltrans
- $15,343,475
- 2/18/26
- Laguna Creek Multi Functional Corridor
- Elk Grove
- $5,562,150
- 2/17/26
- 06-0S37U4 Kings Fresno Counties Near Lemoore From 0.3 Mile South Excelsior Avenue 1.0 Mile South Co
- Caltrans
- $55,606,770
- 2/12/26
- 2025 Pavement Maintenance Overlay WPR025
- Elk Grove
- $5,506,416
- 2/12/26
- Bella Canto Neighborhood Pavement Rehabilitation
- Coachella
- $529,000
- 2/12/26
- 04-3AA904 Marin County Tiburon At 0.1 Mile West Stewart Drive
- Caltrans
- $1,362,109
- 2/11/26
- 06-1E8804 Fresno County Kerman From Belmont Avenue Modoc Avenue From 0.2 Mile East Goldenrod Avenue
- Caltrans
- $1,490,545
- 2/11/26
- Road Resurfacing Wheeler Ridge Road Laval Road Santa Elena Drive
- Kern County
- $1,739,640
- 2/11/26
- 2025 CDBG Pavement Rehabilitation Project
- King City
- $2,429,924
- 2/5/26
- 06-0X9504 Kings County Near Kettleman City From 0.1 Mile South Bernard Drive 0.2 Mile North Bernard
- Caltrans
- $8,356,180
- 2/5/26
- 05-1K5204 Santa Barbara County At Various Locations
- Caltrans
- $20,346,690
- 2/5/26
- 06-1H9404 Kern County Maricopa From The San Luis Obispo County Line 0.1 Mile North Cadet Road
- Caltrans
- $4,524,849
- 2/4/26
- Whitewater Neighborhood Road Improvement Fiscal Year 2025 2026
- Cathedral City
- $817,718
- 2/4/26
- 03-3H5904 Placer County At Various Locations
- Caltrans
- $135,169,901
- 2/3/26
- 06-1H9704 Madera County Near Chowchilla From Route 59/152 Separation 0.1 Mile West Route 99/152 S
- Caltrans
- $4,647,238
- 2/3/26
- 05-1H6104 Santa Barbara County Orcutt Guadalupe From Solomon Road Route 166
- Caltrans
- $20,468,978
- 1/29/26
- AB617 Roadway Improvements Derby St Comanche Dr
- Arvin
- $5,050,500
- 1/28/26
- 01-0J8014 Humboldt County Near Blue Lake From 0.9 Mile 2.1 Miles East Blue Lake Boulevard
- Caltrans
- $80,294,126
- 1/27/26
- 01-0P6404 Humboldt County About 10 Miles South Klamath From 2.7 Miles North Boyes Creek Viaduct 2.7
- Caltrans
- $2,612,723
- 1/27/26
- Hopper Ave Corridor Fire Recovery Improvements
- Santa Rosa
- $5,750,551
- 1/27/26
- Pier Avenue Multi Modal Betterments
- San Luis Obispo County
- $917,917
- 1/26/26
- March Avenue Reconstruction Pedestrian Upgrades
- Healdsburg
- $3,344,614
- 1/22/26
- 2026 Pavement Overlay Resurfacing Program
- Thousand Oaks
- $19,936,228
- 1/21/26
- Fresno Pave More Now Bid Package B 1
- Fresno
- $9,503,940
- 1/20/26
- Avenue 16 1 2 Bridge Replacement Dry Creek
- Madera County
- $2,474,418
- 1/15/26
- 03-0J4004 El Dorado County Placerville From 0.1 Mile West Carson Road Overcrossing 5 Mile Road 1.0
- Caltrans
- $32,884,274
- 1/14/26
- Dana Circle Extension
- Kings County
- $1,118,265
- 1/13/26
- 06-0Y1804 Madera County Madera From 0.1 Mile South Avenue 13 0.1 Mile South East Madera Underpas
- Caltrans
- $18,519,297
- 1/13/26
- Lower Mission Creek Flood Control Reach 4
- Santa Barbara County
- $13,099,889
- 1/7/26
- 05-1E0304 Santa Barbara County Guadalupe Route 1 From Route 166 0.1 Mile South Santa Maria River Br
- Caltrans
- $8,096,248
- 1/7/26
- Street Rehabilitation FY 25 26
- Barstow
- $17,915,972
- 1/7/26
- 01-0B22U4 Mendocino County Fort Bragg From Route 20 Pudding Creek Bridge
- Caltrans
- $9,015,269
- 1/6/26
- 06-1F7504 Tulare County At Pixley Davis Street Overcrossing East Court Avenue Overcrossing
- Caltrans
- $602,552
- 1/6/26
- Capital Pavement Program Preservation Overlay
- Ukiah
- $870,470
- 08/22/26
- 120
- 0%
- -
- $870,470
- Reap 2 0 Drainage Improvements
- Palm Desert
- $882,262
- 08/22/26
- 120
- 0%
- -
- $882,262
- 06-1F7504 Tulare County At Pixley Davis Street Overcrossing East Court Avenue Overcrossing
- Salinas
- $13,114,821
- 08/01/26
- 120
- 6.7%
- $3,278,705
- $12,240,500
- 06-1F7504 Tulare County At Pixley Davis Street Overcrossing East Court Avenue Overcrossing
- Department of Water Resources
- $4,029,851
- 07/26/26
- 120
- 11.7%
- $1,007,463
- $3,559,702
- 06-1F7504 Tulare County At Pixley Davis Street Overcrossing East Court Avenue Overcrossing
- Clovis
- $1,069,838
- 07/25/26
- 120
- 12.5%
- $267,460
- $936,108
- 06-1F7504 Tulare County At Pixley Davis Street Overcrossing East Court Avenue Overcrossing
- Humboldt County
- $12,384,494
- 07/20/26
- 120
- 16.7%
- $3,096,124
- $10,320,412
- 06-1F7504 Tulare County At Pixley Davis Street Overcrossing East Court Avenue Overcrossing
- Turlock
- $3,462,283
- 07/07/26
- 120
- 27.5%
- $865,571
- $2,510,155
- 06-1F7504 Tulare County At Pixley Davis Street Overcrossing East Court Avenue Overcrossing
- Caltrans
- $4,049,375
- 07/06/26
- 50
- 68.0%
- $2,429,625
- $1,295,800
- 06-1F7504 Tulare County At Pixley Davis Street Overcrossing East Court Avenue Overcrossing
- Caltrans
- $9,974,339
- 07/05/26
- 590
- 5.9%
- $507,170
- $9,382,641
- 06-1F7504 Tulare County At Pixley Davis Street Overcrossing East Court Avenue Overcrossing
- Lake County
- $1,785,589
- 07/04/26
- 120
- 30.0%
- $446,397
- $1,249,912
- 06-1F7504 Tulare County At Pixley Davis Street Overcrossing East Court Avenue Overcrossing
- Caltrans
- $1,623,491
- 06/29/26
- 95
- 43.2%
- $512,681
- $922,826
- 06-1F7504 Tulare County At Pixley Davis Street Overcrossing East Court Avenue Overcrossing
- Ontario International Airport
- $2,373,510
- 06/26/26
- 120
- 36.7%
- $593,378
- $1,503,223
- 06-1F7504 Tulare County At Pixley Davis Street Overcrossing East Court Avenue Overcrossing
- Santa Barbara County
- $4,727,838
- 06/23/26
- 65
- 72.3%
- $2,182,079
- $1,309,247
- 06-1F7504 Tulare County At Pixley Davis Street Overcrossing East Court Avenue Overcrossing
- Napa County
- $3,011,143
- 06/22/26
- 120
- 40.0%
- $752,786
- $1,806,686
- 06-1F7504 Tulare County At Pixley Davis Street Overcrossing East Court Avenue Overcrossing
- Sacramento County
- $13,958,767
- 06/15/26
- 120
- 45.8%
- $3,489,692
- $7,560,999
- 06-1F7504 Tulare County At Pixley Davis Street Overcrossing East Court Avenue Overcrossing
- Caltrans
- $833,290
- 06/15/26
- 60
- 91.7%
- $416,645
- $69,441
- 06-1F7504 Tulare County At Pixley Davis Street Overcrossing East Court Avenue Overcrossing
- Kings County
- $6,126,214
- 06/01/26
- 120
- 58.3%
- $1,531,554
- $2,552,589
- 06-1F7504 Tulare County At Pixley Davis Street Overcrossing East Court Avenue Overcrossing
- El Centro
- $3,231,000
- 04/27/26
- 120
- 86.7%
- $807,750
- $430,800
- 06-1F7504 Tulare County At Pixley Davis Street Overcrossing East Court Avenue Overcrossing
- San Jacinto
- $8,083,808
- 04/20/26
- 185
- 60.0%
- $1,310,888
- $3,233,523
- 06-1F7504 Tulare County At Pixley Davis Street Overcrossing East Court Avenue Overcrossing
- Caltrans
- $32,884,274
- 03/15/26
- 250
- 58.8%
- $3,946,113
- $13,548,321
- 06-1F7504 Tulare County At Pixley Davis Street Overcrossing East Court Avenue Overcrossing
- Caltrans
- $19,064,615
- 02/09/26
- 450
- 40.2%
- $1,270,974
- $11,396,403
- 06-1F7504 Tulare County At Pixley Davis Street Overcrossing East Court Avenue Overcrossing
- Caltrans
- $6,627,017
- 02/08/26
- 750
- 24.3%
- $265,081
- $5,018,861
- 06-1F7504 Tulare County At Pixley Davis Street Overcrossing East Court Avenue Overcrossing
- Caltrans
- $72,328,657
- 01/05/26
- 750
- 28.8%
- $2,893,146
- $51,498,004
- 06-1F7504 Tulare County At Pixley Davis Street Overcrossing East Court Avenue Overcrossing
- Caltrans
- $147,515,937
- 12/20/25
- 980
- 23.7%
- $4,515,794
- $112,593,797
- 06-1F7504 Tulare County At Pixley Davis Street Overcrossing East Court Avenue Overcrossing
- Palo Alto
- $9,399,787
- 07/12/25
- 450
- 87.3%
- $626,652
- $1,190,640
- 06-1F7504 Tulare County At Pixley Davis Street Overcrossing East Court Avenue Overcrossing
- Caltrans
- $87,942,000
- 02/08/25
- 675
- 81.0%
- $3,908,533
- $16,676,409
- 06-1F7504 Tulare County At Pixley Davis Street Overcrossing East Court Avenue Overcrossing
- Caltrans
- $38,224,000
- 01/20/25
- 1050
- 53.9%
- $1,092,114
- $17,619,444
- 06-1F7504 Tulare County At Pixley Davis Street Overcrossing East Court Avenue Overcrossing
- Caltrans
- $78,658,036
- 12/15/24
- 917
- 65.6%
- $2,573,327
- $27,019,936
- 06-1F7504 Tulare County At Pixley Davis Street Overcrossing East Court Avenue Overcrossing
- Caltrans
- $72,398,200
- 06/26/23
- 1335
- 85.4%
- $1,626,926
- $10,575,018
- 06-1F7504 Tulare County At Pixley Davis Street Overcrossing East Court Avenue Overcrossing
- Caltrans
- $86,000,000
- 10/27/21
- 2100
- 83.2%
- $1,228,571
- $14,415,238
- 06-1F7504 Tulare County At Pixley Davis Street Overcrossing East Court Avenue Overcrossing
- Caltrans
- $6,845,845
- 04/03/21
- 2000
- 97.7%
- $102,688
- $157,454
- $47,545,887
- $344,346,821