Health Breakdown
Avg Left
20
Success
-20
Avg Avg
10
Year Proj
-30
2 Year Prior Proj
75
Qual Based
0
Cash Flow
50
 
105%
100%
Health
Financial Health & Pipeline Brief
Analyzed On:  Aug 13, 2026
DeSilva Gates Construction (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
DeSilva Gates enters the period with **$65.8M** remaining backlog, of which **$10.8M** and **$1.5M** are tied to the two 2026-awarded projects now mobilizing. Execution will be constrained by the sharp drop in 2026 wins to only **$18.2M** at a 5.7% success rate, limiting near-term revenue ramp.

Medium-term Outlook (6-12 months)
The **$53.5M** remaining on the Fresno Airport project will drive the majority of cash flow, yet its 617-month duration implies slow monthly burn rates. Without a rebound in win volume above the **$196M** achieved in 2025, backlog could fall below **$40M** by year-end 2026.

Key Risk Period
The 2026 bidding results signal the primary risk window, with total low-bid volume collapsing to **$18.2M** and average left-on-low tightening to 2.99%, indicating margin pressure and potential cash-flow gaps if new awards do not accelerate within the next two quarters.

Recommendations
Prioritize pursuit of shorter-duration projects to improve cash conversion cycles and target a minimum 10% success rate on bids exceeding **$500M** annually. Implement monthly backlog burn tracking tied to the three active contracts to identify liquidity shortfalls early.
 
JOBS LOW
  • 06-0H22U4 Madera County Madera From San Joaquin River Bridge 0.6 Mile North Avenue 12 Overcrossing
  • Caltrans
  • 10/22/26
  • 03-2J9804 Sutter County Near Knights Landing From 0.4 Mile North Cranmore Road 0.3 Mile North Knigh
  • Caltrans
  • 8/13/26
  • Willow Keyes Corridor Improvements Federal No ATPL 5005 173
  • San Jose
  • 7/23/26
  • Street Resurfacing 2026
  • Milpitas
  • 4/8/26
  • Street Resurfacing 2025 Dempsey Road Great Mall Parkway Phase II
  • Milpitas
  • 1/7/26
Bidjudge
JOBS BID
  • 06-0H22U4 Madera County Madera From San Joaquin River Bridge 0.6 Mile North Avenue 12 Overcrossing
  • Caltrans
  • $77,277,277
  • 10/22/26
  • Hazel Avenue At US 50 Interchange Improvement Project Segment 1
  • Sacramento County
  • $22,525,239
  • 10/1/26
  • Vasco Road Safety Improvements Phase 2 0662-6R4411
  • Contra Costa County Public Works
  • $23,071,071
  • 9/24/26
  • 03-0N4504 Sacramento County Sacramento From 0.1 Mile North Fulton Avenue Overcrossing Auburn Boulev
  • Caltrans
  • $4,272,739
  • 9/9/26
  • Dyer Street Pavement Rehabilitation
  • Union City
  • $591,195
  • 9/8/26
  • 03-4J9004 Sacramento County Thornton From Lost Slough Bridge Dierssen Road Overcrossing
  • Caltrans
  • $4,079,143
  • 9/3/26
  • 03-2J9804 Sutter County Near Knights Landing From 0.4 Mile North Cranmore Road 0.3 Mile North Knigh
  • Caltrans
  • $2,758,572
  • 8/13/26
  • 05-1S5904 Monterey County At Various Locations
  • Caltrans
  • $3,912,219
  • 8/11/26
  • 23 052 Roads Program CIP
  • Turlock
  • $25,334,334
  • 7/28/26
  • Willow Keyes Corridor Improvements Federal No ATPL 5005 173
  • San Jose
  • $10,802,000
  • 7/23/26
  • 2026 Street Resurfacing 01 26
  • Pleasant Hill
  • $4,190,000
  • 7/22/26
  • Sierra College Blvd I 80 Resurfacing
  • Rocklin
  • $2,420,500
  • 7/16/26
  • Mills Crossing Right Of Way Infrastructure
  • Rancho Cordova
  • $3,121,121
  • 7/16/26
  • Pavement Management 2026
  • San Ramon
  • $5,313,313
  • 7/15/26
  • OBAG 2 Cherry Ave Federal No STPL 5005 177
  • San Jose
  • $1,165,561
  • 7/9/26
  • 2026 Pavement Rehabilitation
  • Belmont
  • $2,781,801
  • 7/8/26
  • 2025 26 Annual Pavement Rehabilitation CIP No 4183 4190
  • Orinda
  • $2,999,999
  • 6/2/26
  • 10-1M2304 San Joaquin County French Camp At Mathews Road Undercrossing
  • Caltrans
  • $6,407,407
  • 6/2/26
  • 04-2X7304 Santa Clara County San Jose From 0.5 Mile North Bernal Road Undercrossing Coyote Creek Br
  • Caltrans
  • $702,300
  • 6/2/26
  • 2026 Citywide Pavement Rehabilitation
  • Benicia
  • $4,273,466
  • 6/2/26
  • 04-2X7904 Santa Clara County Gilroy From Santa Clara County LINE 0.3 Mile West Santa Teresa Boule
  • Caltrans
  • $1,263,263
  • 5/28/26
  • Central Expressway Pavement Rehabilitation Between Bowers Ave And Scott Blvd
  • Santa Clara County
  • $8,397,516
  • 5/21/26
  • 04-2X7104 Solano County Dixon Route 80 At Pedrick Road Overcrossing Route 113 From Route 12 0.3 Mil
  • Caltrans
  • $1,460,460
  • 5/20/26
  • 2026 Pavement Preservation
  • Yolo County
  • $4,963,369
  • 5/14/26
  • Citywide Street Rehabilitation Package 6 B2
  • San Mateo
  • $3,156,156
  • 5/14/26
  • 2025 2026 Street Rehabilitation
  • Moraga
  • $1,807,708
  • 5/6/26
  • AC Overlay 2026 Phase C
  • Sacramento County
  • $6,822,822
  • 4/23/26
  • North GA Ramp Reconstruction
  • Napa County
  • $3,104,475
  • 4/23/26
  • 2026 Local Streets Resurfacing South Pavement Measure T
  • San Jose
  • $5,900,577
  • 4/23/26
  • FY26 Street Resurfacing
  • Palo Alto
  • $3,646,996
  • 4/22/26
  • Skyking Road Extension Phelan Drive
  • Sacramento County
  • $2,249,249
  • 4/16/26
  • AC Overlay 2026 Phase B
  • Sacramento County
  • $15,388,388
  • 4/16/26
  • 2026 Major Streets Resurfacing 2
  • San Jose
  • $8,169,169
  • 4/16/26
  • 03-3G6104 Yolo County At Zamora From 0.1 Mile South Adams Creek Bridge 0.2 Mile North Route 505/5 S
  • Caltrans
  • $5,123,456
  • 4/14/26
  • AC Overlay 2026 Phase A
  • Sacramento County
  • $11,861,685
  • 4/9/26
  • Fair Oaks Boulevard Bicycle Pedestrian Mobility Phase 2
  • Sacramento County
  • $9,523,521
  • 4/9/26
  • SJC New Taxiway Victor Phase 3A
  • San Jose
  • $13,777,776
  • 4/9/26
  • Street Resurfacing 2026
  • Milpitas
  • $3,342,338
  • 4/8/26
  • 2519 Resurfacing Portions Various Roadways Castro Valley Area
  • Alameda County
  • $877,240
  • 4/7/26
  • 2520 Resurfacing Portions Various Roadways Eden Area
  • Alameda County
  • $1,174,688
  • 4/7/26
  • 2521 Slurry Seal Resurfacing Portions Various Roadways
  • Alameda County
  • $4,539,665
  • 4/7/26
  • 03-3G7504 Butte County At Butte Valley From Route 70 Separation 0.2 Mile South Durham Pentz Road Fr
  • Caltrans
  • $4,334,334
  • 3/26/26
  • 04-2X7404 Santa Clara County Near Los Gatos From Santa Clara County Line 0.1 Mile North Hebard Road
  • Caltrans
  • $4,247,247
  • 3/26/26
  • 03-3G7804 Yuba County At Olivehurst From Route 65/70 Separation Yuba River Bridge
  • Caltrans
  • $3,329,329
  • 3/25/26
  • Annual Street Overlay Rehabilitation 2019 21 Phase III
  • San Leandro
  • $4,064,064
  • 3/19/26
  • 10-1U0604 Stanislaus County Patterson From 1.1 Miles North Main Canal Bridge 0.2 Mile South Sperry
  • Caltrans
  • $3,574,886
  • 3/18/26
  • 10-1U0804 Merced County At Santa Nella From 0.1 Mile North Mccabe Road The Intersection Sullivan Ro
  • Caltrans
  • $3,888,888
  • 3/17/26
  • FY26 Pavement Improvement
  • Alameda County
  • $10,792,815
  • 3/17/26
  • Sacramento International Airport Terminal A Exit Road
  • Sacramento County
  • $16,046,046
  • 3/12/26
  • 2026 DOT SLT Road Maintenance Pavement Rehabilitation
  • El Dorado County
  • $3,744,744
  • 3/10/26
  • Residential Pavement Maintenance Phase F PJ 2611 2624
  • Concord
  • $5,043,275
  • 3/5/26
  • 2025 Pavement Maintenance Overlay WPR025
  • Elk Grove
  • $5,361,361
  • 2/12/26
  • 06-0S37U4 Kings Fresno Counties Near Lemoore From 0.3 Mile South Excelsior Avenue 1.0 Mile South Co
  • Caltrans
  • $62,770,770
  • 2/12/26
  • Placer Parkway Phase 1 Construction
  • Placer County
  • $61,711,711
  • 2/10/26
  • Citywide Street Reconstruction Phase 5
  • San Mateo
  • $4,973,973
  • 2/5/26
  • 03-3H5904 Placer County At Various Locations
  • Caltrans
  • $118,023,110
  • 2/3/26
  • Off System Roadway Rehabilitation 2026
  • Paradise
  • $7,043,777
  • 1/26/26
  • FY2025 26 Road Overlay SB1
  • Sutter County
  • $1,836,836
  • 1/22/26
  • 03-0J4004 El Dorado County Placerville From 0.1 Mile West Carson Road Overcrossing 5 Mile Road 1.0
  • Caltrans
  • $39,133,733
  • 1/14/26
  • Street Resurfacing 2025 Dempsey Road Great Mall Parkway Phase II
  • Milpitas
  • $4,091,695
  • 1/7/26
Bidjudge
CASH FLOW
  • Street Resurfacing 2025 Dempsey Road Great Mall Parkway Phase II
  • Caltrans
  • $2,758,572
  • 10/12/26
  • 45
  • 33.3%
  • $1,839,048
  • $1,839,048
  • Street Resurfacing 2025 Dempsey Road Great Mall Parkway Phase II
  • San Jose
  • $10,802,000
  • 09/21/26
  • 120
  • 30.0%
  • $2,700,500
  • $7,561,400
  • Street Resurfacing 2025 Dempsey Road Great Mall Parkway Phase II
  • Fresno
  • $98,888,888
  • 11/02/25
  • 617
  • 58.2%
  • $4,808,212
  • $41,350,621
  • $9,347,760
  • $128,028,346
Bidjudge