- Sully Miller Contracting Co.
- 2026
- 44
- 10
- 22.73%
- $139,176,840
- 7.01%
- 17.60%
- 7.97%
- $968,232,646

Recent 2026 awards have built a **$31M** remaining backlog, anchored by the **$19.8M** Avalon Boulevard project and several smaller jobs bid in Q2 2026. This volume supports stable but limited cash flow through year-end as long-duration contracts (up to 120 months) advance at modest burn rates. Execution risk remains low given the high percentage already complete on older projects.
Medium-term Outlook (6-12 months)
Win rate recovery to 26.5% in 2026 versus 10.2% in 2025 positions the firm for potential backlog expansion if bidding volume holds near **$636M** annually. However, total 2026 awards of only **$73.5M** suggest cash flow may tighten absent additional wins before mid-2027. Sustained success on current bids could lift backlog above **$50M** within the period.
Key Risk Period
The steep drop in awarded volume from **$337M** in 2024 to **$22.5M** in 2025 creates a clear exposure window in the next 6-12 months if 2026 momentum stalls. With current backlog at just **$31M** and many projects already largely complete, revenue could decline sharply without improved hit rates.
Recommendations
Prioritize competitive bid strategies to lift success rate above 30% and target at least **$150M** in new awards over the next year. Monitor burn rates on the **$19.8M** Avalon project closely to optimize near-term cash collections.
- Broadway Manchester Active Transportation Equity Atpl 5006 895
- Los Angeles
- 9/30/26
- E1908427 Avalon Boulevard Improvements 56th Street Manchester Avenue
- Los Angeles
- 6/26/26
- Air Expressway Pavement Rehabilitation
- Adelanto
- 6/16/26
- Wilshire Boulevard Safety Improvement Phase 2B
- Santa Monica
- 6/3/26
- 08-1N8104 San Bernardino County Needles From 3.2 Miles East West Junction Route 95 0.1 Mile East E
- Caltrans
- 4/15/26
- Calabasas Road Roundabout Rebid
- Calabasas
- 3/23/26
- RDC0016346 Michillinda Avenue Intersection Improvements
- Los Angeles County
- 2/17/26
- 2026 Pavement Overlay Resurfacing Program
- Thousand Oaks
- 1/21/26
- West Calabasas Road Improvements
- Calabasas
- 1/16/26
- Street Rehabilitation FY 25 26
- Barstow
- 1/7/26
- Residential and Arterial Pavement Improvement I-159 I-139 B2026-19
- Torrance
- $15,414,809
- 11/18/26
- 12-086924 Orange County San Juan Capistrano Retaining Wall Sidewalk Hma Drainage Electrical
- Caltrans
- $41,354,156
- 11/17/26
- FY 25-26 Residential Street Rehab Project 2027-06
- West Covina
- $5,073,074
- 11/12/26
- 12-0K9824 Orange County Anaheim Orange Route 55 From 0.4 Mile South Route 91/55 Separation 0.2 Mile
- Caltrans
- $175,924,000
- 10/22/26
- 09-383804 Inyo County Lone Pine Hot Mix Asphalt Culvert Minor Concrete
- Caltrans
- $6,290,183
- 10/22/26
- Broadway Manchester Active Transportation Equity Atpl 5006 895
- Los Angeles
- $65,595,771
- 9/30/26
- Readiness Road Rehabilitation
- Victorville
- $597,450
- 9/23/26
- South Glendale Pavement Management Plan PMP
- Glendale - CA
- $9,871,234
- 8/12/26
- 10 10 1932 SHR Avialtion Flight Line Pavement Repl
- San Bernardino County
- $7,598,345
- 8/12/26
- Riverside Drive
- San Bernardino County
- $4,208,962
- 8/6/26
- Carmenita Road Rehabilitation 550 North Excelsior Drive Rosecrans Avenue CIP 7184
- Norwalk
- $4,222,000
- 7/29/26
- FY 2026 27 Annual Major Streets Rehabilitation Program Los Angeles Avenue First Street Erringer Roa
- Simi Valley
- $2,526,803
- 7/21/26
- San Pedro Waterfront Harbor Blvd Roadway 22nd St Parking Lot Improvements
- Los Angeles
- $63,475,020
- 7/16/26
- 12-0K9704 Orange Riverside Counties Route 241 From 0.1 Mile South Santiago Creek Bridge Route 91 R
- Caltrans
- $274,780,000
- 7/16/26
- Local Street Rehabilitation Zones 5 6 CIP 7944
- Norwalk
- $5,789,000
- 7/15/26
- 07-354204 Los Angeles County Malibu From 0.1 Mile West Serra Road Ventura County LINE
- Caltrans
- $33,673,123
- 7/2/26
- E1908427 Avalon Boulevard Improvements 56th Street Manchester Avenue
- Los Angeles
- $19,789,084
- 6/26/26
- Air Expressway Pavement Rehabilitation
- Adelanto
- $1,895,875
- 6/16/26
- Wilshire Boulevard Safety Improvement Phase 2B
- Santa Monica
- $6,551,647
- 6/3/26
- Fiscal Year 2026 27 Street Rehabilitation
- Big Bear Lake
- $1,994,762
- 5/28/26
- FY 2025 26 Annual Minor Streets Rehabilitation Program Phase II Asphalt
- Simi Valley
- $2,259,434
- 5/14/26
- 07-286304 Los Angeles County Llano Route 138 From 0.4 Mile West 190th Street East 0.7 Mile South 13
- Caltrans
- $31,987,636
- 4/28/26
- Taxilane G Repairs
- Ontario International Airport
- $3,098,520
- 4/27/26
- 2025 26 Overlay C
- Santa Clarita
- $1,815,264
- 4/27/26
- Arterial Road Rehabilitation Palmdale Boulevard
- Palmdale
- $4,420,053
- 4/20/26
- Avenue R Phase 1 25th St Tackstem Avenue
- Palmdale
- $13,697,891
- 4/20/26
- Taxiway F Realignment Reconstruction Long Beach Airport
- Long Beach
- $26,609,995
- 4/16/26
- 08-1N8104 San Bernardino County Needles From 3.2 Miles East West Junction Route 95 0.1 Mile East E
- Caltrans
- $7,144,189
- 4/15/26
- 2025 Pavement Preventative Maintenance Rehabilitation Program
- Lancaster
- $10,082,260
- 4/14/26
- Residential Street Rehabilitation Cycle 2 Phase 5
- Redondo Beach
- $3,741,029
- 4/8/26
- 07-364904 Los Angeles County Near Lancaster Route 138 From 0.1 Mile West 0.2 Mile East 60th Street
- Caltrans
- $10,857,021
- 4/7/26
- Fremont Avenue Improvement
- Montclair
- $3,685,139
- 3/31/26
- Calabasas Road Roundabout Rebid
- Calabasas
- $1,000,000
- 3/23/26
- Annual Citywide Street Resurfacing ADA Improvement Program FY 2026
- Pasadena - CA
- $9,864,970
- 3/19/26
- 2025 26 Overlay Slurry Seal Program M0164 Overlay B
- Santa Clarita
- $2,205,434
- 3/4/26
- 2025 26 Overlay A
- Santa Clarita
- $6,106,515
- 3/3/26
- RDC0016346 Michillinda Avenue Intersection Improvements
- Los Angeles County
- $1,000,000
- 2/17/26
- FY24 25 Residential Street Rehabilitation
- West Covina
- $3,777,192
- 2/9/26
- 08-1G66U4 San Bernardino County San Bernardino Route 66 From Pepper Avenue H Street Route 215 At
- Caltrans
- $32,795,540
- 2/5/26
- 12-0V5004 Orange County Huntington Beach From Newland Street Goldenwest Street
- Caltrans
- $3,568,271
- 2/4/26
- 2026 Pavement Overlay Resurfacing Program
- Thousand Oaks
- $14,497,587
- 1/21/26
- West Calabasas Road Improvements
- Calabasas
- $5,388,900
- 1/16/26
- Street Rehabilitation FY 25 26
- Barstow
- $16,313,787
- 1/7/26
- MLK JR Street Improvements Main Street Avalon Boulevard
- Carson
- $5,690,721
- 1/5/26
- Broadway Manchester Active Transportation Equity Atpl 5006 895
- Los Angeles
- $65,595,771
- 11/29/26
- 0
- 0%
- -
- $65,595,771
- MLK JR Street Improvements Main Street Avalon Boulevard
- Los Angeles
- $19,789,084
- 08/25/26
- 120
- 75.0%
- $4,947,271
- $4,947,271
- MLK JR Street Improvements Main Street Avalon Boulevard
- Adelanto
- $1,895,875
- 08/15/26
- 120
- 82.5%
- $473,969
- $331,778
- MLK JR Street Improvements Main Street Avalon Boulevard
- Santa Monica
- $6,551,647
- 08/02/26
- 460
- 24.3%
- $427,281
- $4,956,463
- $5,848,521
- $75,831,283



