BidJudge.com - Projects
estimating@sully-miller.com
135 S. State College Blvd.
Brea CA
92821
714-578-9600
714-578-9672
Health Breakdown
Avg Left
-10
Success
40
Avg Avg
10
Year Proj
50
2 Year Prior Proj
75
Qual Based
0
Cash Flow
50
 
215%
100%
Health
Financial Health & Pipeline Brief
Analyzed On:  Aug 12, 2026
Sully Miller Contracting Co. (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
Recent 2026 awards have built a **$31M** remaining backlog, anchored by the **$19.8M** Avalon Boulevard project and several smaller jobs bid in Q2 2026. This volume supports stable but limited cash flow through year-end as long-duration contracts (up to 120 months) advance at modest burn rates. Execution risk remains low given the high percentage already complete on older projects.

Medium-term Outlook (6-12 months)
Win rate recovery to 26.5% in 2026 versus 10.2% in 2025 positions the firm for potential backlog expansion if bidding volume holds near **$636M** annually. However, total 2026 awards of only **$73.5M** suggest cash flow may tighten absent additional wins before mid-2027. Sustained success on current bids could lift backlog above **$50M** within the period.

Key Risk Period
The steep drop in awarded volume from **$337M** in 2024 to **$22.5M** in 2025 creates a clear exposure window in the next 6-12 months if 2026 momentum stalls. With current backlog at just **$31M** and many projects already largely complete, revenue could decline sharply without improved hit rates.

Recommendations
Prioritize competitive bid strategies to lift success rate above 30% and target at least **$150M** in new awards over the next year. Monitor burn rates on the **$19.8M** Avalon project closely to optimize near-term cash collections.
 
JOBS LOW
  • Broadway Manchester Active Transportation Equity Atpl 5006 895
  • Los Angeles
  • 9/30/26
  • E1908427 Avalon Boulevard Improvements 56th Street Manchester Avenue
  • Los Angeles
  • 6/26/26
  • Air Expressway Pavement Rehabilitation
  • Adelanto
  • 6/16/26
  • Wilshire Boulevard Safety Improvement Phase 2B
  • Santa Monica
  • 6/3/26
  • 08-1N8104 San Bernardino County Needles From 3.2 Miles East West Junction Route 95 0.1 Mile East E
  • Caltrans
  • 4/15/26
  • Calabasas Road Roundabout Rebid
  • Calabasas
  • 3/23/26
  • RDC0016346 Michillinda Avenue Intersection Improvements
  • Los Angeles County
  • 2/17/26
  • 2026 Pavement Overlay Resurfacing Program
  • Thousand Oaks
  • 1/21/26
  • West Calabasas Road Improvements
  • Calabasas
  • 1/16/26
  • Street Rehabilitation FY 25 26
  • Barstow
  • 1/7/26
Bidjudge
JOBS BID
  • Residential and Arterial Pavement Improvement I-159 I-139 B2026-19
  • Torrance
  • $15,414,809
  • 11/18/26
  • 12-086924 Orange County San Juan Capistrano Retaining Wall Sidewalk Hma Drainage Electrical
  • Caltrans
  • $41,354,156
  • 11/17/26
  • FY 25-26 Residential Street Rehab Project 2027-06
  • West Covina
  • $5,073,074
  • 11/12/26
  • 12-0K9824 Orange County Anaheim Orange Route 55 From 0.4 Mile South Route 91/55 Separation 0.2 Mile
  • Caltrans
  • $175,924,000
  • 10/22/26
  • 09-383804 Inyo County Lone Pine Hot Mix Asphalt Culvert Minor Concrete
  • Caltrans
  • $6,290,183
  • 10/22/26
  • Broadway Manchester Active Transportation Equity Atpl 5006 895
  • Los Angeles
  • $65,595,771
  • 9/30/26
  • Readiness Road Rehabilitation
  • Victorville
  • $597,450
  • 9/23/26
  • South Glendale Pavement Management Plan PMP
  • Glendale - CA
  • $9,871,234
  • 8/12/26
  • 10 10 1932 SHR Avialtion Flight Line Pavement Repl
  • San Bernardino County
  • $7,598,345
  • 8/12/26
  • Riverside Drive
  • San Bernardino County
  • $4,208,962
  • 8/6/26
  • Carmenita Road Rehabilitation 550 North Excelsior Drive Rosecrans Avenue CIP 7184
  • Norwalk
  • $4,222,000
  • 7/29/26
  • FY 2026 27 Annual Major Streets Rehabilitation Program Los Angeles Avenue First Street Erringer Roa
  • Simi Valley
  • $2,526,803
  • 7/21/26
  • San Pedro Waterfront Harbor Blvd Roadway 22nd St Parking Lot Improvements
  • Los Angeles
  • $63,475,020
  • 7/16/26
  • 12-0K9704 Orange Riverside Counties Route 241 From 0.1 Mile South Santiago Creek Bridge Route 91 R
  • Caltrans
  • $274,780,000
  • 7/16/26
  • Local Street Rehabilitation Zones 5 6 CIP 7944
  • Norwalk
  • $5,789,000
  • 7/15/26
  • 07-354204 Los Angeles County Malibu From 0.1 Mile West Serra Road Ventura County LINE
  • Caltrans
  • $33,673,123
  • 7/2/26
  • E1908427 Avalon Boulevard Improvements 56th Street Manchester Avenue
  • Los Angeles
  • $19,789,084
  • 6/26/26
  • Air Expressway Pavement Rehabilitation
  • Adelanto
  • $1,895,875
  • 6/16/26
  • Wilshire Boulevard Safety Improvement Phase 2B
  • Santa Monica
  • $6,551,647
  • 6/3/26
  • Fiscal Year 2026 27 Street Rehabilitation
  • Big Bear Lake
  • $1,994,762
  • 5/28/26
  • FY 2025 26 Annual Minor Streets Rehabilitation Program Phase II Asphalt
  • Simi Valley
  • $2,259,434
  • 5/14/26
  • 07-286304 Los Angeles County Llano Route 138 From 0.4 Mile West 190th Street East 0.7 Mile South 13
  • Caltrans
  • $31,987,636
  • 4/28/26
  • Taxilane G Repairs
  • Ontario International Airport
  • $3,098,520
  • 4/27/26
  • 2025 26 Overlay C
  • Santa Clarita
  • $1,815,264
  • 4/27/26
  • Arterial Road Rehabilitation Palmdale Boulevard
  • Palmdale
  • $4,420,053
  • 4/20/26
  • Avenue R Phase 1 25th St Tackstem Avenue
  • Palmdale
  • $13,697,891
  • 4/20/26
  • Taxiway F Realignment Reconstruction Long Beach Airport
  • Long Beach
  • $26,609,995
  • 4/16/26
  • 08-1N8104 San Bernardino County Needles From 3.2 Miles East West Junction Route 95 0.1 Mile East E
  • Caltrans
  • $7,144,189
  • 4/15/26
  • 2025 Pavement Preventative Maintenance Rehabilitation Program
  • Lancaster
  • $10,082,260
  • 4/14/26
  • Residential Street Rehabilitation Cycle 2 Phase 5
  • Redondo Beach
  • $3,741,029
  • 4/8/26
  • 07-364904 Los Angeles County Near Lancaster Route 138 From 0.1 Mile West 0.2 Mile East 60th Street
  • Caltrans
  • $10,857,021
  • 4/7/26
  • Fremont Avenue Improvement
  • Montclair
  • $3,685,139
  • 3/31/26
  • Calabasas Road Roundabout Rebid
  • Calabasas
  • $1,000,000
  • 3/23/26
  • Annual Citywide Street Resurfacing ADA Improvement Program FY 2026
  • Pasadena - CA
  • $9,864,970
  • 3/19/26
  • 2025 26 Overlay Slurry Seal Program M0164 Overlay B
  • Santa Clarita
  • $2,205,434
  • 3/4/26
  • 2025 26 Overlay A
  • Santa Clarita
  • $6,106,515
  • 3/3/26
  • RDC0016346 Michillinda Avenue Intersection Improvements
  • Los Angeles County
  • $1,000,000
  • 2/17/26
  • FY24 25 Residential Street Rehabilitation
  • West Covina
  • $3,777,192
  • 2/9/26
  • 08-1G66U4 San Bernardino County San Bernardino Route 66 From Pepper Avenue H Street Route 215 At
  • Caltrans
  • $32,795,540
  • 2/5/26
  • 12-0V5004 Orange County Huntington Beach From Newland Street Goldenwest Street
  • Caltrans
  • $3,568,271
  • 2/4/26
  • 2026 Pavement Overlay Resurfacing Program
  • Thousand Oaks
  • $14,497,587
  • 1/21/26
  • West Calabasas Road Improvements
  • Calabasas
  • $5,388,900
  • 1/16/26
  • Street Rehabilitation FY 25 26
  • Barstow
  • $16,313,787
  • 1/7/26
  • MLK JR Street Improvements Main Street Avalon Boulevard
  • Carson
  • $5,690,721
  • 1/5/26
Bidjudge
CASH FLOW
  • MLK JR Street Improvements Main Street Avalon Boulevard
  • Los Angeles
  • $19,789,084
  • 08/25/26
  • 120
  • 75.0%
  • $4,947,271
  • $4,947,271
  • MLK JR Street Improvements Main Street Avalon Boulevard
  • Adelanto
  • $1,895,875
  • 08/15/26
  • 120
  • 82.5%
  • $473,969
  • $331,778
  • MLK JR Street Improvements Main Street Avalon Boulevard
  • Santa Monica
  • $6,551,647
  • 08/02/26
  • 460
  • 24.3%
  • $427,281
  • $4,956,463
  • $5,848,521
  • $75,831,283
Bidjudge