- GP Enterprises inc
- 2026
- 7
- 1
- 14.29%
- $20,489,827
- 20.58%
- 23.39%
- 10.28%
- $332,890,683
The contractor holds a thin active backlog of **$18.1M** from the single Jenkins project bid in March 2026. Cash flow will rely on progress billings from this award amid a 25% success rate on **$272.9M** in 2026 bids. Limited wins and 20.58% average left on low bids signal near-term margin and liquidity constraints.
Medium-term Outlook (6-12 months)
Bidding volume rose to **$272.9M** in 2026 from **$236.4M** in 2025, yet the 12.5–25% win rates have produced minimal backlog replenishment. The 730-month duration supports prolonged revenue but heightens exposure to gaps without new awards. Pipeline remains concentrated on one project.
Key Risk Period
The post-completion phase of the Jenkins project represents the primary risk window, as no additional backlog exists to sustain operations. Persistent low success rates and single-project dependency could trigger cash flow shortfalls within 12 months.
Recommendations
Increase bid submissions while tightening pre-bid reviews to lift win rates above 25%. Target at least two new awards within six months to rebuild backlog beyond **$18.1M**. Implement monthly cash flow forecasting tied to the current project’s billing cycle.
- B3CBA2602606-0 HALL
- GDOT
- $50,923,948
- 9/18/26
- 0017405 Gwinnett
- GDOT
- $3,710,343
- 8/21/26
- 0016351 Barrow
- GDOT
- $5,397,000
- 8/21/26
- B3CBA2602153-0 Houston, Twiggs
- GDOT
- $169,329,165
- 6/12/26
- B1CBA2601205-0 Jenkins
- GDOT
- $20,489,827
- 3/20/26
- B3CBA2601360-0 GREENE
- GDOT
- $38,297,000
- 2/20/26
- B3CBA2601210-0 Barrow, Gwinnett, Hall
- GDOT
- $44,743,400
- 1/23/26