BidJudge.com - Projects
3600 Wildish Ln
Eugene OR
97408
541-485-1700
Health Breakdown
Avg Left
20
Success
40
Avg Avg
10
Year Proj
50
2 Year Prior Proj
Qual Based
0
Cash Flow
-40
 
80%
80%
Health
Financial Health & Pipeline Brief
Analyzed On:  Aug 13, 2026
Wildish Construction (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
Wildish Construction holds **$12.2M** in remaining backlog, with multiple projects bid in mid-2026 (including **$4.9M** I-84 Bridges and **$2.0M** City View Pump Station) expected to drive active cash inflows. The improved 2026 success rate of **27.3%** and lower **2.99%** average left on low bids support timely project starts and positive near-term liquidity.

Medium-term Outlook (6-12 months)
Bidding volume rose to **$97.2M** in 2026 from **$76.6M** the prior year, positioning the firm for sustained backlog replenishment beyond the current **$12.2M** level. Ongoing 120-month contracts with partial remaining values (such as **$1.1M** on NE 223rd Avenue) will continue generating revenue while new wins convert.

Key Risk Period
Extended 120-month durations on most active projects create exposure to cost escalation and payment delays between 9-18 months out, particularly if 2026 wins experience mobilization slippage. The modest **$12.2M** backlog relative to annual low-bid volume heightens sensitivity to any near-term bid losses.

Recommendations
Prioritize acceleration of high-remaining projects bid after May 2026 to lock in cash flow. Maintain bidding discipline at the current **27.3%** success rate while targeting shorter-duration work to reduce long-term risk concentration.
 
JOBS LOW
  • OR99W 3rd St 4th St Western Blvd
  • ODOT
  • 9/17/26
  • I 84 Eastbound M P 258 83 Median Barrier Repair
  • ODOT
  • 9/2/26
  • R2 Paving RFB OR58 MP40 50 44 30 Overlay Paving
  • ODOT
  • 8/10/26
  • City View 1150 Pump Station Construction
  • Eugene Water & Electric Board
  • 7/15/26
  • R2 Paving RFB OR569 Coburg River Road On Off Ramp Paving
  • ODOT
  • 7/2/26
  • I 84 Bridges Over North Spruce Street La Grande
  • ODOT
  • 6/11/26
  • MBM 2026 I 5 Vets Bridge Multiuse Path Repair
  • ODOT
  • 6/2/26
  • 25 26 07 Parking Lot Maintenance Inlay Paving
  • Lane Community College
  • 5/27/26
  • NE 223rd Avenue Improvement
  • Multnomah County
  • 5/7/26
  • OR99W Bethel Rd Polk County
  • ODOT
  • 4/23/26
  • 2026 ITB 5 Bethel Dr Paving
  • Eugene
  • 4/9/26
  • ITB 4 2026 Safe Routes School Prairie Mountain School Crossing
  • Eugene
  • 3/19/26
  • Aspen Street Tamarack Centennial
  • Springfield
  • 2/26/26
  • Multnomah County US30BY Bridge Over Private Driveway Portland
  • ODOT
  • 2/5/26
Bidjudge
JOBS BID
  • OR99W 3rd St 4th St Western Blvd
  • ODOT
  • $1,615,571
  • 9/17/26
  • US101 Gold Beach Rogue River Bridge
  • ODOT
  • $42,980,190
  • 9/17/26
  • Buxton Road Pedestrian Improvements
  • Multnomah County
  • $467,191
  • 9/15/26
  • I 84 Eastbound M P 258 83 Median Barrier Repair
  • ODOT
  • $72,845
  • 9/2/26
  • ITB 20272001 Cuthbert Amphitheater Site Improvements
  • Eugene
  • $2,289,323
  • 9/1/26
  • P21205 Mohawk Paving ADA
  • Springfield
  • $226,332
  • 8/27/26
  • Douglas Ave Deer Creek Bridge Roseburg
  • ODOT
  • $6,082,612
  • 8/13/26
  • R2 Paving RFB OR58 MP40 50 44 30 Overlay Paving
  • ODOT
  • $1,119,478
  • 8/10/26
  • 2026 ITB 16 Patterson Street Safety Pilot E 18th Ave to E 24th Ave
  • Eugene
  • $93,807
  • 8/6/26
  • All Roads Transportation Safety Wasco County
  • ODOT
  • $997,169
  • 8/6/26
  • Intermittent Overlay Paving
  • ODOT
  • $1,721,716
  • 8/5/26
  • OR228 MP Overlay Paving
  • ODOT
  • $1,179,625
  • 8/4/26
  • MBM District 3 Joint Replacement
  • ODOT
  • $435,022
  • 8/4/26
  • US20 Harney St Moore Dr Newport
  • ODOT
  • $2,845,840
  • 7/23/26
  • City View 1150 Pump Station Construction
  • Eugene Water & Electric Board
  • $2,021,969
  • 7/15/26
  • R2 Paving RFB OR569 Coburg River Road On Off Ramp Paving
  • ODOT
  • $678,657
  • 7/2/26
  • 2026 ITB 15 River Road Paving Randy Pape Beltline Green Lane
  • Eugene
  • $1,657,127
  • 6/18/26
  • ITB 14 2026 Safe Routes School Awbrey Park Elementary Pedestrian Access
  • Eugene
  • $112,633
  • 6/16/26
  • ITB 20262031 Suzanne Arlie Park Trailhead Parking Road Widening
  • Eugene
  • $1,096,205
  • 6/11/26
  • Eastern Oregon 2024 2027 ADA Curb Ramps Phase 3
  • ODOT
  • $4,191,997
  • 6/11/26
  • I 84 Bridges Over North Spruce Street La Grande
  • ODOT
  • $4,964,298
  • 6/11/26
  • US30BY Curb Ramps Phase 2
  • ODOT
  • $6,752,317
  • 6/11/26
  • I 84 Rieth Interchange Umatilla River Bridges
  • ODOT
  • $7,898,808
  • 6/4/26
  • MBM 2026 I 5 Vets Bridge Multiuse Path Repair
  • ODOT
  • $188,954
  • 6/2/26
  • 25 26 07 Parking Lot Maintenance Inlay Paving
  • Lane Community College
  • $186,958
  • 5/27/26
  • 2026 ITB 7 Old Coburg Road Stormwater Retrofit
  • Eugene
  • $97,894
  • 5/21/26
  • EWEB ITB 26 056 PW Arthur St Amazon Creek Bridge
  • Eugene Water & Electric Board
  • $140,300
  • 5/19/26
  • 2026 41 Pavement Restoration Daisy Street Transmission Phase 1
  • Springfield
  • $421,580
  • 5/19/26
  • 2026 ITB 6 Broadway Paving Phase 2
  • Eugene
  • $1,573,524
  • 5/19/26
  • NE Cleveland Ave SE Stark St NE Burnside
  • Gresham
  • $4,042,712
  • 5/11/26
  • NE 223rd Avenue Improvement
  • Multnomah County
  • $1,402,116
  • 5/7/26
  • Gresham Fairview Trail Phase 4
  • Gresham
  • $2,254,309
  • 4/23/26
  • OR99W Bethel Rd Polk County
  • ODOT
  • $1,946,966
  • 4/23/26
  • Tyson Park Redevelopment
  • Willamalane Park Rec District
  • $830,000
  • 4/22/26
  • I 84 Eastbound Rieth Road OR11 Section
  • ODOT
  • $448,525
  • 4/16/26
  • 2026 ITB 5 Bethel Dr Paving
  • Eugene
  • $1,946,966
  • 4/9/26
  • 100315 NW Walker Road NW 185th Ave NW 173rd Ave
  • Washington County - OR
  • $18,747,293
  • 3/25/26
  • ITB 4 2026 Safe Routes School Prairie Mountain School Crossing
  • Eugene
  • $305,731
  • 3/19/26
  • 26 032 PW Myoak Drive River Road Water Main
  • Eugene Water & Electric Board
  • $278,536
  • 3/17/26
  • Highland Dr Grant Ave Walnut Blvd Street Improvements
  • Corvallis
  • $1,334,626
  • 3/12/26
  • 2026 MIM I5 SB MP 301 13 300 89 Rut Repair
  • ODOT
  • $926,501
  • 3/10/26
  • 2026 18 Pavement Restoration W N St Rainbow Dr
  • Springfield
  • $168,980
  • 3/4/26
  • Aspen Street Tamarack Centennial
  • Springfield
  • $877,120
  • 2/26/26
  • 36th Street Main Street Commercial Ave
  • Springfield
  • $670,165
  • 2/24/26
  • Polk County OR22 Perrydale Rd Kings Valley Highway Section Willamina
  • ODOT
  • $7,796,112
  • 2/19/26
  • Jackson County OR62 Lost Creek Lake Bridge
  • ODOT
  • $3,262,907
  • 2/5/26
  • Multnomah County US30BY Bridge Over Private Driveway Portland
  • ODOT
  • $898,444
  • 2/5/26
  • 4J School District Pavement Repair
  • Eugene School District 4J
  • $973,000
  • 1/29/26
  • 2026 ITB 1 Willamette Street W 52nd Avenue Parking Lot
  • Eugene
  • $409,301
  • 1/27/26
  • I5 N Umpqua R Corp NB SB Bridges Winchester
  • ODOT
  • $6,123,152
  • 1/15/26
  • NB Boone Bridge I 5 Over Willamette River MP 283 11 Joint Rehabilitation
  • ODOT
  • $1,971,950
  • 1/14/26
  • OR38 Elkton Marked Crosswalk Edgeview Dr
  • ODOT
  • $51,030
  • 1/7/26
Bidjudge
CASH FLOW
  • OR38 Elkton Marked Crosswalk Edgeview Dr
  • Eugene Water & Electric Board
  • $2,021,969
  • 09/13/26
  • 120
  • 10.0%
  • $505,492
  • $1,819,772
  • OR38 Elkton Marked Crosswalk Edgeview Dr
  • ODOT
  • $678,657
  • 08/31/26
  • 120
  • 20.8%
  • $169,664
  • $537,270
  • OR38 Elkton Marked Crosswalk Edgeview Dr
  • ODOT
  • $4,964,298
  • 08/10/26
  • 120
  • 38.3%
  • $1,241,075
  • $3,061,317
  • OR38 Elkton Marked Crosswalk Edgeview Dr
  • ODOT
  • $188,954
  • 08/01/26
  • 120
  • 45.8%
  • $47,239
  • $102,350
  • OR38 Elkton Marked Crosswalk Edgeview Dr
  • Lane Community College
  • $186,958
  • 07/26/26
  • 120
  • 50.8%
  • $46,740
  • $91,921
  • OR38 Elkton Marked Crosswalk Edgeview Dr
  • Multnomah County
  • $1,402,116
  • 07/06/26
  • 120
  • 67.5%
  • $350,529
  • $455,688
  • OR38 Elkton Marked Crosswalk Edgeview Dr
  • ODOT
  • $1,946,966
  • 06/22/26
  • 120
  • 79.2%
  • $486,742
  • $405,618
  • OR38 Elkton Marked Crosswalk Edgeview Dr
  • Eugene
  • $1,946,966
  • 06/08/26
  • 120
  • 90.8%
  • $486,742
  • $178,472
  • $3,334,223
  • $9,460,302
Bidjudge