- Wildish Construction
- 2026
- 36
- 10
- 27.78%
- $13,396,210
- 3.14%
- 17.69%
- 7.39%
- $86,797,694

Wildish Construction enters the period with a **$26.8M** remaining backlog anchored by nine 2026 low bids totaling **$12.7M** at a **25.7%** success rate. Recent wins such as the **$4.96M** I-84 Bridges and multiple paving contracts bid between March and June 2026 should generate steady cash inflows assuming typical mobilization schedules.
Medium-term Outlook (6-12 months)
Bidding volume rose to **$86.1M** in 2026 from **$76.6M** the prior year, supporting potential backlog replenishment if the **25%** win rate persists. The eleven 2025 awards valued at **$14M** plus carryover work provide revenue visibility through late 2027, though 120-month durations will stretch recognition.
Key Risk Period
Extended 120-month contract terms on all listed projects create peak cash-flow and escalation risk during 2027–2028 execution windows. Margin compression to **3.21%** average left on low in 2026 heightens exposure if material or labor costs rise.
Recommendations
Tighten bid markup discipline to restore margins above **3.21%** and implement monthly cash-flow forecasting tied to the long-duration backlog. Diversify into shorter-cycle municipal work to reduce concentration in extended Oregon DOT contracts.
- R2 Paving RFB OR569 Coburg River Road On Off Ramp Paving
- ODOT
- 7/2/26
- I 84 Bridges Over North Spruce Street La Grande
- ODOT
- 6/11/26
- MBM 2026 I 5 Vets Bridge Multiuse Path Repair
- ODOT
- 6/2/26
- 25 26 07 Parking Lot Maintenance Inlay Paving
- Lane Community College
- 5/27/26
- NE 223rd Avenue Improvement
- Multnomah County
- 5/7/26
- OR99W Bethel Rd Polk County
- ODOT
- 4/23/26
- 2026 ITB 5 Bethel Dr Paving
- Eugene
- 4/9/26
- ITB 4 2026 Safe Routes School Prairie Mountain School Crossing
- Eugene
- 3/19/26
- Aspen Street Tamarack Centennial
- Springfield
- 2/26/26
- Multnomah County US30BY Bridge Over Private Driveway Portland
- ODOT
- 2/5/26
- R2 Paving RFB OR569 Coburg River Road On Off Ramp Paving
- ODOT
- $678,657
- 7/2/26
- 2026 ITB 15 River Road Paving Randy Pape Beltline Green Lane
- Eugene
- $1,657,127
- 6/18/26
- ITB 14 2026 Safe Routes School Awbrey Park Elementary Pedestrian Access
- Eugene
- $112,633
- 6/16/26
- ITB 20262031 Suzanne Arlie Park Trailhead Parking Road Widening
- Eugene
- $1,096,205
- 6/11/26
- Eastern Oregon 2024 2027 ADA Curb Ramps Phase 3
- ODOT
- $4,191,997
- 6/11/26
- I 84 Bridges Over North Spruce Street La Grande
- ODOT
- $4,964,298
- 6/11/26
- US30BY Curb Ramps Phase 2
- ODOT
- $6,752,317
- 6/11/26
- I 84 Rieth Interchange Umatilla River Bridges
- ODOT
- $7,898,808
- 6/4/26
- MBM 2026 I 5 Vets Bridge Multiuse Path Repair
- ODOT
- $188,954
- 6/2/26
- 25 26 07 Parking Lot Maintenance Inlay Paving
- Lane Community College
- $186,958
- 5/27/26
- 2026 ITB 7 Old Coburg Road Stormwater Retrofit
- Eugene
- $97,894
- 5/21/26
- 2026 ITB 6 Broadway Paving Phase 2
- Eugene
- $1,573,524
- 5/19/26
- 2026 41 Pavement Restoration Daisy Street Transmission Phase 1
- Springfield
- $421,580
- 5/19/26
- EWEB ITB 26 056 PW Arthur St Amazon Creek Bridge
- Eugene Water & Electric Board
- $140,300
- 5/19/26
- NE Cleveland Ave SE Stark St NE Burnside
- Gresham
- $4,042,712
- 5/11/26
- NE 223rd Avenue Improvement
- Multnomah County
- $1,402,116
- 5/7/26
- OR99W Bethel Rd Polk County
- ODOT
- $1,946,966
- 4/23/26
- Gresham Fairview Trail Phase 4
- Gresham
- $2,254,309
- 4/23/26
- I 84 Eastbound Rieth Road OR11 Section
- ODOT
- $448,525
- 4/16/26
- 2026 ITB 5 Bethel Dr Paving
- Eugene
- $1,946,966
- 4/9/26
- 100315 NW Walker Road NW 185th Ave NW 173rd Ave
- Washington County - OR
- $18,747,293
- 3/25/26
- ITB 4 2026 Safe Routes School Prairie Mountain School Crossing
- Eugene
- $305,731
- 3/19/26
- 26 032 PW Myoak Drive River Road Water Main
- Eugene Water & Electric Board
- $278,536
- 3/17/26
- Highland Dr Grant Ave Walnut Blvd Street Improvements
- Corvallis
- $1,334,626
- 3/12/26
- 2026 MIM I5 SB MP 301 13 300 89 Rut Repair
- ODOT
- $926,501
- 3/10/26
- 2026 18 Pavement Restoration W N St Rainbow Dr
- Springfield
- $168,980
- 3/4/26
- Aspen Street Tamarack Centennial
- Springfield
- $877,120
- 2/26/26
- 36th Street Main Street Commercial Ave
- Springfield
- $670,165
- 2/24/26
- Polk County OR22 Perrydale Rd Kings Valley Highway Section Willamina
- ODOT
- $7,796,112
- 2/19/26
- Jackson County OR62 Lost Creek Lake Bridge
- ODOT
- $3,262,907
- 2/5/26
- Multnomah County US30BY Bridge Over Private Driveway Portland
- ODOT
- $898,444
- 2/5/26
- 4J School District Pavement Repair
- Eugene School District 4J
- $973,000
- 1/29/26
- 2026 ITB 1 Willamette Street W 52nd Avenue Parking Lot
- Eugene
- $409,301
- 1/27/26
- I5 N Umpqua R Corp NB SB Bridges Winchester
- ODOT
- $6,123,152
- 1/15/26
- NB Boone Bridge I 5 Over Willamette River MP 283 11 Joint Rehabilitation
- ODOT
- $1,971,950
- 1/14/26
- OR38 Elkton Marked Crosswalk Edgeview Dr
- ODOT
- $51,030
- 1/7/26
- R2 Paving RFB OR569 Coburg River Road On Off Ramp Paving
- ODOT
- $678,657
- 08/31/26
- 120
- 0%
- -
- $678,657
- I 84 Bridges Over North Spruce Street La Grande
- ODOT
- $4,964,298
- 08/10/26
- 120
- 0%
- -
- $4,964,298
- MBM 2026 I 5 Vets Bridge Multiuse Path Repair
- ODOT
- $188,954
- 08/01/26
- 120
- 0%
- -
- $188,954
- 25 26 07 Parking Lot Maintenance Inlay Paving
- Lane Community College
- $186,958
- 07/26/26
- 120
- 0%
- -
- $186,958
- OR38 Elkton Marked Crosswalk Edgeview Dr
- Multnomah County
- $1,402,116
- 07/06/26
- 120
- 5.0%
- $350,529
- $1,332,010
- OR38 Elkton Marked Crosswalk Edgeview Dr
- ODOT
- $1,946,966
- 06/22/26
- 120
- 16.7%
- $486,742
- $1,622,472
- OR38 Elkton Marked Crosswalk Edgeview Dr
- Eugene
- $1,946,966
- 06/08/26
- 120
- 28.3%
- $486,742
- $1,395,326
- OR38 Elkton Marked Crosswalk Edgeview Dr
- Eugene
- $305,731
- 05/18/26
- 120
- 45.8%
- $76,433
- $165,604
- OR38 Elkton Marked Crosswalk Edgeview Dr
- Springfield
- $877,120
- 04/27/26
- 120
- 63.3%
- $219,280
- $321,611
- OR38 Elkton Marked Crosswalk Edgeview Dr
- ODOT
- $898,444
- 04/06/26
- 120
- 80.8%
- $224,611
- $172,202
- $1,844,337
- $11,028,092