- Jr Davis Construction
- 2026
- 7
- 3
- 42.86%
- $255,068,846
- 3.67%
- 9.30%
- 6.74%
- $283,149,152

The **$239M** remaining backlog, concentrated in three active projects with bid dates in early-to-mid 2026, will drive initial revenue ramp-up and positive cash flow as mobilization begins. Strong 2026 bidding results, including **$255M** in low bids at a 42.9% success rate, position the firm to sustain near-term operations without immediate liquidity pressure.
Medium-term Outlook (6-12 months)
Continued execution on the **$239M** backlog, particularly the **$119M** E8V59 LAKE and **$89M** County Road 557 projects, should support steady cash inflows through the first half of 2027. Elevated 2026 bidding volume of **$283M** total, versus **$166M** in 2025, signals improving win momentum that can replenish work if conversion rates hold near 42%.
Key Risk Period
The 12-to-24-month window presents the primary risk as current long-duration contracts begin to wind down without confirmed follow-on awards, potentially creating a revenue gap if 2027 bidding success falls below historical levels.
Recommendations
Prioritize aggressive pursuit of additional Florida DOT and municipal work to maintain backlog above **$200M**, while tightening bid margins given the 3.67% average left on low in 2026. Implement monthly cash flow forecasting tied to the three active projects to mitigate duration-related timing risks.
- County Road 557 Widening
- Polk County
- $89,662,272
- 7/22/26
- North Donnelly Street Emergency Roadway Repair Permanent
- Mount Dora
- $2,414,354
- 3/16/26
- Thompson Nursery Road Extension Phase 1 Segment 1
- Polk County
- $33,273,440
- 3/4/26
- Resurfacing City Streets
- Orlando
- $13,211,061
- 1/30/26
- T5874 ORANGE
- FDOT
- $10,254,119
- 1/28/26
- E8V59 LAKE
- FDOT
- $132,133,134
- 1/27/26
- City Lake Mary Milling Paving
- Lake Mary
- $2,200,772
- 1/12/26
- County Road 557 Widening
- Polk County
- $89,662,272
- 09/20/26
- 120
- 0%
- -
- $89,662,272
- City Lake Mary Milling Paving
- Polk County
- $33,273,440
- 05/03/26
- 1033
- 9.8%
- $966,315
- $30,020,180
- City Lake Mary Milling Paving
- FDOT
- $132,133,134
- 03/28/26
- 1437
- 9.5%
- $2,758,521
- $119,535,890
- $3,724,836
- $239,218,342