- Blount Construction Co Georgia
- 2026
- 82
- 12
- 14.63%
- $22,651,206
- 5.90%
- 25.04%
- 11.12%
- $230,812,468
The contractor holds a current active backlog of **$6.78M** across seven projects bid primarily in mid-2026, supporting steady execution and cash inflows through year-end. Recent awards such as the **$2.88M** DOT resurfacing and **$2.49M** Hall project provide immediate revenue visibility assuming standard progress billing cycles.
Medium-term Outlook (6-12 months)
Sustained activity hinges on converting the 15.6% success rate on **$117.6M** in 2026 bids into additional awards, as the existing backlog offers limited runway beyond initial projects. Performance improved from the prior year's **$26.3M** in low bids, but consistent wins will be required to maintain pipeline momentum into 2027.
Key Risk Period
The 12-month horizon represents the highest exposure, as the modest **$6.78M** backlog could deplete rapidly without higher win rates, creating potential cash flow gaps amid long-duration contracts with slow remaining burn.
Recommendations
Prioritize bid refinement to exceed the current 15.6% success rate and pursue larger-volume opportunities aligned with 2025 results. Implement monthly backlog tracking and cash flow forecasting tied to the **$6.78M** remaining value to optimize working capital.
- 2026 Lra Camp Road
- Lamar County
- 9/29/26
- 2026 Road Resurfacing Program
- Forsyth County
- 8/27/26
- IFB CON DOT 2604 1260182 2025 LMIG Street Resurfacing Associated Activities Group 3
- Atlanta
- 8/3/26
- ITB 26 02 Roadway Rehabilitation
- Dawsonville
- 7/22/26
- 26 40 Resurfacing Various County Roads 2026 Batch 1
- Henry County
- 7/10/26
- Mt Tabor Park Connectivity Additional Parking
- Paulding County
- 7/8/26
- 2026 Buford LMIG Roadway Paving
- Buford
- 6/25/26
- IFB CON DOT 2512 1260095 2025 LMIG Street Resurfacing Associated Activities Group
- Atlanta
- 6/19/26
- 2026 Resurfacing Pilgrim Mill Road
- Cumming
- 5/27/26
- IFB 26 005 Harris Road Full Depth Reclamation
- Fairburn
- 5/22/26
- Roadway Rehabilitation
- Dawsonville
- 5/12/26
- B1CBA2601539-0 Hall
- GDOT
- 3/20/26
- B3CBA2602682-0 Gwinnett
- GDOT
- $9,223,579
- 11/20/26
- 27-103BSW Tuxedo Lane and Smokerise Trace Drainage Improvements
- Peachtree City
- $424,665
- 11/17/26
- 2250 Lewis Street Public Parking Lot
- Kennesaw
- $660,820
- 11/13/26
- Roadway Resurfacing Project LMIG-2024-26558-SUP
- McDonough
- $1,207,240
- 11/6/26
- Wexford Downs Dallas Landing 2026 Milling Repaving
- Acworth GA
- $1,820,342
- 10/28/26
- 226-1027 Henderson RD
- Banks County
- $913,460
- 10/27/26
- Resurfacing Of Various City Streets
- Cartersville
- $2,056,377
- 10/19/26
- B3CBA2602643-0 Hall
- GDOT
- $3,525,328
- 10/16/26
- RFB2027-02 2027 TSPLOST PAVING
- Barrow County
- $18,238,849
- 10/15/26
- Asphaltic Concrete Pavement Preservation-2026
- Newnan
- $2,784,214
- 10/13/26
- Newton Drive Storm Drainage Improvements
- Covington GA
- $239,073
- 10/13/26
- Resurfacing Contract 2027-2 Local Roads Northeast B2933
- Cobb County
- $7,550,166
- 10/8/26
- 2026 LMIG Resurfacing Striping Milling
- Calhoun County
- $408,641
- 10/8/26
- 2026 Road Improvements Project Project No 261240
- Chattahoochee Hills
- $425,291
- 10/6/26
- 2026 Lra Camp Road
- Lamar County
- $440,188
- 9/29/26
- Additional 2026 Milling And Deep Patching 2026 05
- Walton County
- $504,310
- 9/22/26
- LRA Patching Milling Resurfacing Various Douglas County Roads
- Douglas County
- $2,367,168
- 9/21/26
- B3CBA2602621-0 HALL
- GDOT
- $6,482,215
- 9/18/26
- FY26 LMIG Resurfacing
- Sandy Springs
- $7,747,184
- 9/18/26
- Rockdale County SPLOST 5B Resurfacing Program
- Rockdale County
- $11,918,151
- 9/17/26
- Asphalt Resurfacing Multiple Roads
- Heard County
- $1,000,234
- 9/9/26
- 27018 B Grant Road 250 Culvert Replacement
- Fayette County
- $240,194
- 9/3/26
- 27011 B 115 105 Brandon Mill Circle 115120
- Fayette County
- $219,398
- 9/3/26
- 2026 18 LMIG LRA 1
- Covington GA
- $1,741,951
- 9/3/26
- 2026 Road Resurfacing Program
- Forsyth County
- $8,621,337
- 8/27/26
- 2026 15 LAS Culvert Replacement Phase 2
- Covington GA
- $334,421
- 8/25/26
- 2026 15 LAS Service Road Replacement Phase 2
- Covington GA
- $334,421
- 8/25/26
- M006182 Hall
- GDOT
- $1,863,126
- 8/21/26
- M006742 Gwinnett
- GDOT
- $2,698,043
- 8/21/26
- M006782 DeKalb
- GDOT
- $4,099,673
- 8/21/26
- M006823 Polk
- GDOT
- $2,045,690
- 8/21/26
- FY 2025 LMIG Leveling Overlay Stripping Various County Roads
- Jones County GA
- $1,620,539
- 8/13/26
- Streer Resurfacing College Park
- College Park GA
- $222,328
- 8/11/26
- 2026 0011 LMIG Stockbridge
- Stockbridge GA
- $3,381,500
- 8/11/26
- 2026 LMIG Roadway Improvements
- Hoschton
- $1,089,821
- 8/6/26
- IFB CON DOT 2604 1260182 2025 LMIG Street Resurfacing Associated Activities Group 3
- Atlanta
- $2,884,455
- 8/3/26
- ITB 26 02 Roadway Rehabilitation
- Dawsonville
- $174,042
- 7/22/26
- B3CBA2602468-0 DeKalb
- GDOT
- $2,089,744
- 7/17/26
- 27 001 FY27 Milling Resurfacing
- Alpharetta
- $4,178,961
- 7/16/26
- 26 40 Resurfacing Various County Roads 2026 Batch 1
- Henry County
- $3,275,264
- 7/10/26
- Mt Tabor Park Connectivity Additional Parking
- Paulding County
- $379,445
- 7/8/26
- LMIG 2026 Milling Patching Resurfacing
- Suwanee
- $1,390,904
- 7/6/26
- LAR Asphalt Leveling Resurfacing Various County Roads
- Lumpkin County
- $334,080
- 7/1/26
- Walton Drive Emergency Repair Corby Ln Justin Court Emily Ln Milling Asphalt Replacement
- Social Circle
- $123,620
- 6/30/26
- Woodehaven Drive Replacement Asphalt Paving
- Duluth
- $973,703
- 6/25/26
- 2026 Buford LMIG Roadway Paving
- Buford
- $1,212,811
- 6/25/26
- 2026 11 Station 21 Paving
- Covington GA
- $556,950
- 6/23/26
- IFB CON DOT 2512 1260095 2025 LMIG Street Resurfacing Associated Activities Group
- Atlanta
- $1,412,284
- 6/19/26
- Brookton Chase Court Brookton Downs Subdivision Asphalt Repaving
- Dacula GA
- $553,014
- 6/18/26
- 26 048 LH LRA Paving
- Bibb County
- $4,808,212
- 6/18/26
- 26 39 Jonesboro Road Resurfacing I 75 Rosebud Lane
- Gwinnett County
- $3,536,368
- 6/12/26
- RFB 2026 02 LMIG Asphalt Resurfacing
- Holly Springs
- $435,004
- 6/5/26
- 26 015 Stormwater
- Commerce
- $159,335
- 5/28/26
- RFB2026 16 2026 TSPLOST Paving
- Barrow County
- $5,068,547
- 5/28/26
- FY 2026 LMIG Roadway Resurfacing
- Berrien County
- $1,576,954
- 5/28/26
- 2026 Resurfacing Pilgrim Mill Road
- Cumming
- $883,719
- 5/27/26
- IFB 26 005 Harris Road Full Depth Reclamation
- Fairburn
- $369,725
- 5/22/26
- IFB 26 004 Roadway Improvements Various Roads
- Fairburn
- $2,412,779
- 5/22/26
- Technology Parkway AV Lane Reconfiguration
- Peachtree Corners
- $2,274,501
- 5/19/26
- 2026 Roadway Resurfacing Patching Facilities Paving
- Johns Creek
- $1,576,954
- 5/15/26
- 26 008 2026 Road Resurfacing Improvements
- Flowery Branch
- $944,156
- 5/14/26
- Roadway Rehabilitation
- Dawsonville
- $512,266
- 5/12/26
- 2026 Resurfacing Phase 3 85708
- Cherokee County SC
- $4,747,998
- 5/8/26
- 2026 LMIG Resurfacing
- Lawrenceville
- $1,479,850
- 4/30/26
- Peachtree City Paving 2026
- Peachtree City
- $7,804,935
- 4/22/26
- 2026 01 2026 Resurfacing
- Lowndes County
- $6,699,874
- 4/21/26
- Patching Milling Resurfacing Various Douglas County Roads
- Douglas County
- $2,864,802
- 4/20/26
- B3CBA2601739-0 Gwinnett
- GDOT
- $7,849,326
- 4/17/26
- B1CBA2601748-0 Walton
- GDOT
- $1,692,247
- 4/17/26
- 2026 13 2026 LMIG Non LMIG Paving
- Barrow County
- $3,584,926
- 4/9/26
- Full Depth Reclamation Resurfacing Ten 10 Streets
- Clayton County
- $2,028,802
- 4/7/26
- 2026 Resurfacing Phase 1 85708
- Cherokee County
- $6,699,874
- 4/6/26
- 2026 Resurfacing Phase 2 85708
- Cherokee County
- $5,393,704
- 4/6/26
- FY 2026 Asphalt Resurfacing Contract I
- Paulding County
- $8,766,926
- 3/27/26
- B1CBA2601539-0 Hall
- GDOT
- $2,485,670
- 3/20/26
- FY 2026 Bridge Barrier
- Paulding County
- $1,119,242
- 3/18/26
- 6880 Riverside Drive Detention Pond Improvements
- Sandy Springs
- $101,755
- 3/9/26
- T6026 5 Glen Errol Sidewalk
- Sandy Springs
- $62,375
- 2/27/26
- 2026 SPLOST Milling Resurfacing Various Streets Districts 1 4
- Clayton County
- $9,883,321
- 2/19/26
- 2026 Resurfacing LMIG
- Marietta
- $3,856,456
- 2/6/26
- SR 124 Scenic Hwy Longleaf Dr Maple Wood Dr
- Lawrenceville
- $145,338
- 2/3/26
- B1CBA2601212-0 Hall
- GDOT
- $997,313
- 1/23/26
- 2026 Lra Camp Road
- Lamar County
- $440,188
- 11/28/26
- 0
- 0%
- -
- $440,188
- B1CBA2601212-0 Hall
- Forsyth County
- $8,621,337
- 10/26/26
- 120
- 23.3%
- $2,155,334
- $6,609,692
- B1CBA2601212-0 Hall
- Atlanta
- $2,884,455
- 10/02/26
- 120
- 43.3%
- $721,114
- $1,634,525
- B1CBA2601212-0 Hall
- Dawsonville
- $174,042
- 09/20/26
- 120
- 54.2%
- $43,511
- $79,769
- B1CBA2601212-0 Hall
- Henry County
- $3,275,264
- 09/08/26
- 120
- 63.3%
- $818,816
- $1,200,930
- B1CBA2601212-0 Hall
- Paulding County
- $379,445
- 09/06/26
- 120
- 65.8%
- $94,861
- $129,644
- B1CBA2601212-0 Hall
- Buford
- $1,212,811
- 08/24/26
- 120
- 76.7%
- $303,203
- $282,989
- B1CBA2601212-0 Hall
- Atlanta
- $1,412,284
- 08/18/26
- 120
- 80.8%
- $353,071
- $270,688
- B1CBA2601212-0 Hall
- GDOT
- $2,485,670
- 05/19/26
- 365
- 51.5%
- $204,302
- $1,205,380
- $4,694,212
- $11,853,805