Analyzed On:  Aug 13, 2026
Taylor Northwest (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
The contractor holds a total remaining backlog of **$3,849,286** across four active projects bid in early 2026, supporting limited but steady execution over the next several months. Recent 2026 awards totaling **$7,320,391** at a 40% success rate provide modest revenue flow, though the 120-month durations indicate slow progress billings that may constrain liquidity.

Medium-term Outlook (6-12 months)
Medium-term visibility remains constrained by the small **$3,849,286** backlog and reliance on continued bidding momentum from the **$37,428,931** total volume submitted in 2026. Improved win rates versus 2025's 33.3% could generate additional work, but extended contract timelines risk delaying cash inflows without new starts.

Key Risk Period
The key risk period occurs after mid-2027 once current backlog is exhausted, as the modest **$7,320,391** in 2026 awards and 5.69% average left on low leave little buffer for sustained operations.

Recommendations
Increase bid volume and target higher-margin work to rebuild backlog above **$10M** while tightening cost controls on long-duration projects. Implement monthly cash flow forecasting to address potential liquidity gaps from slow-burn contracts.
 
JOBS LOW
  • 15th Ferguson RAB Construction
  • Bend
  • 5/6/26
  • Jefferson Place Water Improvements
  • Bend
  • 4/8/26
  • Bend Bikeways Construction SE 9th Street NE Bear Creek Rd SE 15th Street North
  • Bend
  • 4/7/26
  • Main St Paving Stormwater Improvements
  • Prineville
  • 2/24/26
Bidjudge
JOBS BID
  • Bulter Market Phase 2 Improvements
  • Bend
  • $3,529,843
  • 10/28/26
  • Galveston Ave Pressure Reducing Valve Replacement Pedestrian Crossing
  • Bend
  • $466,873
  • 9/22/26
  • US97 Multi Use Trail US Forest Service Boundary Lava
  • ODOT
  • $7,575,830
  • 9/17/26
  • Bear Creek Site Preparation
  • Bend
  • $463,222
  • 9/8/26
  • 15th Ferguson RAB Construction
  • Bend
  • $3,413,687
  • 5/6/26
  • 2nd Street Water Improvements
  • Bend
  • $1,077,191
  • 4/30/26
  • Jefferson Place Water Improvements
  • Bend
  • $1,021,118
  • 4/8/26
  • Bend Bikeways Construction SE 9th Street NE Bear Creek Rd SE 15th Street North
  • Bend
  • $2,264,529
  • 4/7/26
  • US97 Earl St Colfax Ln Madras Section
  • ODOT
  • $24,346,202
  • 4/2/26
  • Fairmont Area Waterline
  • Prineville
  • $780,335
  • 3/10/26
  • Main St Paving Stormwater Improvements
  • Prineville
  • $621,057
  • 2/24/26
  • Azalia Windsor Sewer
  • Bend
  • $1,983,650
  • 2/24/26
  • King Hezekiah Fargo Sewer
  • Bend
  • $1,678,578
  • 2/3/26
  • Galveston Ave Pressure Reducing Valve Replacement
  • Bend
  • $242,583
  • 1/7/26