Financial Health & Pipeline Brief
Analyzed On:  Aug 13, 2026
MidMountain Contractors (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
MidMountain Contractors faces immediate cash flow pressure with only **$1,088,843** in remaining backlog from its single active project. The **5.9%** success rate in 2026 limits new revenue inflows, while the 140-month contract duration suggests slow burn on the existing **$5,863,000** award.

Medium-term Outlook (6-12 months)
Backlog replenishment remains uncertain as 2026 bidding volume of **$79M** has yielded just one win versus four in 2025. Without improved conversion, total backlog could stay below **$2M**, constraining operations through year-end.

Key Risk Period
The 6-12 month window presents the highest risk as the current project nears completion with no visible pipeline of additional awards.

Recommendations
Prioritize bid strategy refinement to lift the success rate above **18%** and target at least three new wins in the next quarter to restore backlog above **$10M**.
 
JOBS LOW
  • Eastrail NE Spring Boulevard Trail Link
  • Bellevue
  • 10/1/26
  • XE3690 I 5 NWR South 23 25 Pavement Repair
  • WSDOT
  • 2/19/26
Bidjudge
JOBS BID
  • 1st Ave NE Shared Use Path N 120th To N 130th PW 2026-005
  • Seattle
  • $2,994,000
  • 10/28/26
  • Eastrail NE Spring Boulevard Trail Link
  • Bellevue
  • $5,104,000
  • 10/1/26
  • SR 906 Hyak Vicinity Emergency Washout Restoration
  • WSDOT
  • $1,869,000
  • 9/23/26
  • SS4A Package 1 STM Scope
  • Seattle
  • $2,493,730
  • 9/16/26
  • Water Main Rehab Package 6 North
  • Seattle
  • $6,342,000
  • 8/5/26
  • 44th Avenue West Underpass Pedestrian Bicycle Improvement
  • Lynnwood
  • $8,624,951
  • 7/21/26
  • Curb Ramps Sidewalk Contract 4
  • Seattle
  • $3,321,960
  • 7/8/26
  • Airport Station Area Pedestrian Improvement
  • SeaTac
  • $34,849,206
  • 7/2/26
  • SR 160 Fauntleroy Way SW Ferry Terminal Intersection Improvements
  • WSDOT
  • $1,193,000
  • 6/17/26
  • I 5 I 205 Concrete Panel Rehabilitation
  • WSDOT
  • $3,090,000
  • 6/17/26
  • I 5 N Martin Way E E Mounts Rd SW PCCP Replacement
  • WSDOT
  • $2,023,500
  • 6/10/26
  • ADA Curb Ramp 2026
  • Redmond
  • $2,269,740
  • 5/21/26
  • I 90 Hansen Rd Overpass Emergency Existing Structure Removal
  • WSDOT
  • $2,029,000
  • 5/20/26
  • Holden Natural Drainage System NDS Rebid
  • Seattle
  • $1,284,000
  • 4/22/26
  • Greenwood Ave N Sidewalk Improvements
  • Seattle
  • $4,065,000
  • 4/15/26
  • Urban Core Bike Network Connections Phase 1
  • Bellevue
  • $767,000
  • 3/12/26
  • South Service Center Line Dock Asphalt
  • Seattle
  • $729,000
  • 3/11/26
  • A B Ernst Park Addition
  • Seattle
  • $1,174,000
  • 3/4/26
  • 76th Avenue SE Mid Block Crossing ADA Improvements
  • Mercer Island
  • $633,939
  • 2/19/26
  • XE3690 I 5 NWR South 23 25 Pavement Repair
  • WSDOT
  • $5,863,000
  • 2/19/26
  • Leschi South Moorage Facility Upland Utility Installation
  • Seattle
  • $818,000
  • 1/28/26
Bidjudge
CASH FLOW
  • $0
  • $5,104,000
Bidjudge