BidJudge.com - Projects
  • K&E Excavating
  • 2026
  • 23
  • 8
  • 34.78%
  • $16,751,296
  • 13.57%
  • 11.68%
  • 10.20%
  • $150,060,740
3871 Langley St SE
Salem OR
97317
503-399-4833
503-779-1192
Health Breakdown
Avg Left
-20
Success
50
Avg Avg
5
Year Proj
-30
2 Year Prior Proj
Qual Based
0
Cash Flow
-40
 
-35%
0%
Health
Financial Health & Pipeline Brief
Analyzed On:  Aug 13, 2026
K&E Excavating (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
Current active backlog of **$6.3M** across six projects provides limited near-term revenue visibility, with an average of 14.68% left on 2026 wins totaling **$16M**. Steady progress billings on long-duration contracts should support positive cash flow, though low remaining value constrains volume.

Medium-term Outlook (6-12 months)
Bidding activity rose to 17 jobs in 2026 with a 41.2% success rate, yet total low-bid volume fell to **$16M** from **$22M** in 2025, signaling potential pipeline pressure. Sustained win rates above 30% will be required to replenish backlog and maintain operations beyond current projects.

Key Risk Period
The 6-12 month window presents elevated risk due to the thin **$6.3M** backlog and declining award values, which could create cash flow gaps if new bids are not converted promptly. Extended 120-month durations further delay full recognition of revenue.

Recommendations
Prioritize aggressive bidding on higher-margin municipal work to rebuild backlog above **$15M** within six months. Monitor monthly burn rates against the **$6.3M** remaining to preserve liquidity.
 
JOBS LOW
  • US101 39th St Holmes Rd Lincoln City
  • ODOT
  • 9/24/26
  • US20 Harney St Moore Dr Newport
  • ODOT
  • 7/23/26
  • SW 19th Knoll Stormwater Improvements
  • Bend
  • 5/27/26
  • 2nd Street Water Improvements
  • Bend
  • 4/30/26
  • 2026 Neighborhood Street Safety Program Package B
  • Bend
  • 4/28/26
  • 2026 Neighborhood Street Safety Program Package A
  • Bend
  • 4/28/26
  • Neff Pedestrian Bicycle Improvements
  • Bend
  • 4/21/26
  • ITB North Fork Slide Stabilization Slide 2 North Fork Road SE
  • Marion County
  • 1/28/26
Bidjudge
JOBS BID
  • US101 39th St Holmes Rd Lincoln City
  • ODOT
  • $729,290
  • 9/24/26
  • Galveston Ave Pressure Reducing Valve Replacement Pedestrian Crossing
  • Bend
  • $391,611
  • 9/22/26
  • US97 Multi Use Trail US Forest Service Boundary Lava
  • ODOT
  • $5,991,119
  • 9/17/26
  • Bear Creek Site Preparation
  • Bend
  • $349,399
  • 9/8/26
  • Wastewater System Capacity Improvements Rebid - Second Advertisement
  • City of St. Helens
  • $30,339,329
  • 9/1/26
  • Henrici Water Pump Station Transmission Improvements WIFIA 3 2
  • Oregon City
  • $9,787,093
  • 8/11/26
  • Astoria Cottage Grove Curb Ramps
  • ODOT
  • $11,997,132
  • 7/23/26
  • US20 Harney St Moore Dr Newport
  • ODOT
  • $2,543,970
  • 7/23/26
  • SW 19th Knoll Stormwater Improvements
  • Bend
  • $308,940
  • 5/27/26
  • 15th Ferguson RAB Construction
  • Bend
  • $3,480,719
  • 5/6/26
  • 2nd Street Water Improvements
  • Bend
  • $875,680
  • 4/30/26
  • 2026 Neighborhood Street Safety Program Package B
  • Bend
  • $979,609
  • 4/28/26
  • 2026 Neighborhood Street Safety Program Package A
  • Bend
  • $1,278,135
  • 4/28/26
  • Neff Pedestrian Bicycle Improvements
  • Bend
  • $2,778,605
  • 4/21/26
  • Bend Bikeways Construction SE 9th Street NE Bear Creek Rd SE 15th Street North
  • Bend
  • $2,390,040
  • 4/7/26
  • US97 Earl St Colfax Ln Madras Section
  • ODOT
  • $22,649,354
  • 4/2/26
  • 100343 Century Blvd Extension SE Lois Street E Main Street
  • Washington County
  • $28,954,634
  • 3/11/26
  • Azalia Windsor Sewer
  • Bend
  • $2,485,542
  • 2/24/26
  • Polk County OR22 Perrydale Rd Kings Valley Highway Section Willamina
  • ODOT
  • $7,180,531
  • 2/19/26
  • King Hezekiah Fargo Sewer
  • Bend
  • $2,174,711
  • 2/3/26
  • Ash Meadows Boeckman Creek Flow Mitigation 7068
  • Wilsonville
  • $4,899,160
  • 1/29/26
  • ITB North Fork Slide Stabilization Slide 2 North Fork Road SE
  • Marion County
  • $7,257,067
  • 1/28/26
  • Galveston Ave Pressure Reducing Valve Replacement
  • Bend
  • $239,070
  • 1/7/26
Bidjudge
CASH FLOW
  • Galveston Ave Pressure Reducing Valve Replacement
  • ODOT
  • $2,543,970
  • 09/21/26
  • 120
  • 19.2%
  • $635,993
  • $2,056,376
  • Galveston Ave Pressure Reducing Valve Replacement
  • Bend
  • $308,940
  • 07/26/26
  • 120
  • 66.7%
  • $77,235
  • $102,980
  • Galveston Ave Pressure Reducing Valve Replacement
  • Bend
  • $875,680
  • 06/29/26
  • 120
  • 89.2%
  • $218,920
  • $94,865
  • Galveston Ave Pressure Reducing Valve Replacement
  • Bend
  • $979,609
  • 06/27/26
  • 120
  • 90.8%
  • $244,902
  • $89,797
  • Galveston Ave Pressure Reducing Valve Replacement
  • Bend
  • $1,278,135
  • 06/27/26
  • 120
  • 90.8%
  • $319,534
  • $117,162
  • Galveston Ave Pressure Reducing Valve Replacement
  • Bend
  • $2,778,605
  • 06/20/26
  • 120
  • 96.7%
  • $694,651
  • $92,620
  • $2,191,235
  • $3,283,090
Bidjudge