- K&E Excavating
- 2026
- 23
- 8
- 34.78%
- $16,751,296
- 13.57%
- 11.68%
- 10.20%
- $150,060,740

Current active backlog of **$6.3M** across six projects provides limited near-term revenue visibility, with an average of 14.68% left on 2026 wins totaling **$16M**. Steady progress billings on long-duration contracts should support positive cash flow, though low remaining value constrains volume.
Medium-term Outlook (6-12 months)
Bidding activity rose to 17 jobs in 2026 with a 41.2% success rate, yet total low-bid volume fell to **$16M** from **$22M** in 2025, signaling potential pipeline pressure. Sustained win rates above 30% will be required to replenish backlog and maintain operations beyond current projects.
Key Risk Period
The 6-12 month window presents elevated risk due to the thin **$6.3M** backlog and declining award values, which could create cash flow gaps if new bids are not converted promptly. Extended 120-month durations further delay full recognition of revenue.
Recommendations
Prioritize aggressive bidding on higher-margin municipal work to rebuild backlog above **$15M** within six months. Monitor monthly burn rates against the **$6.3M** remaining to preserve liquidity.
- US101 39th St Holmes Rd Lincoln City
- ODOT
- 9/24/26
- US20 Harney St Moore Dr Newport
- ODOT
- 7/23/26
- SW 19th Knoll Stormwater Improvements
- Bend
- 5/27/26
- 2nd Street Water Improvements
- Bend
- 4/30/26
- 2026 Neighborhood Street Safety Program Package B
- Bend
- 4/28/26
- 2026 Neighborhood Street Safety Program Package A
- Bend
- 4/28/26
- Neff Pedestrian Bicycle Improvements
- Bend
- 4/21/26
- ITB North Fork Slide Stabilization Slide 2 North Fork Road SE
- Marion County
- 1/28/26
- US101 39th St Holmes Rd Lincoln City
- ODOT
- $729,290
- 9/24/26
- Galveston Ave Pressure Reducing Valve Replacement Pedestrian Crossing
- Bend
- $391,611
- 9/22/26
- US97 Multi Use Trail US Forest Service Boundary Lava
- ODOT
- $5,991,119
- 9/17/26
- Bear Creek Site Preparation
- Bend
- $349,399
- 9/8/26
- Wastewater System Capacity Improvements Rebid - Second Advertisement
- City of St. Helens
- $30,339,329
- 9/1/26
- Henrici Water Pump Station Transmission Improvements WIFIA 3 2
- Oregon City
- $9,787,093
- 8/11/26
- Astoria Cottage Grove Curb Ramps
- ODOT
- $11,997,132
- 7/23/26
- US20 Harney St Moore Dr Newport
- ODOT
- $2,543,970
- 7/23/26
- SW 19th Knoll Stormwater Improvements
- Bend
- $308,940
- 5/27/26
- 15th Ferguson RAB Construction
- Bend
- $3,480,719
- 5/6/26
- 2nd Street Water Improvements
- Bend
- $875,680
- 4/30/26
- 2026 Neighborhood Street Safety Program Package B
- Bend
- $979,609
- 4/28/26
- 2026 Neighborhood Street Safety Program Package A
- Bend
- $1,278,135
- 4/28/26
- Neff Pedestrian Bicycle Improvements
- Bend
- $2,778,605
- 4/21/26
- Bend Bikeways Construction SE 9th Street NE Bear Creek Rd SE 15th Street North
- Bend
- $2,390,040
- 4/7/26
- US97 Earl St Colfax Ln Madras Section
- ODOT
- $22,649,354
- 4/2/26
- 100343 Century Blvd Extension SE Lois Street E Main Street
- Washington County
- $28,954,634
- 3/11/26
- Azalia Windsor Sewer
- Bend
- $2,485,542
- 2/24/26
- Polk County OR22 Perrydale Rd Kings Valley Highway Section Willamina
- ODOT
- $7,180,531
- 2/19/26
- King Hezekiah Fargo Sewer
- Bend
- $2,174,711
- 2/3/26
- Ash Meadows Boeckman Creek Flow Mitigation 7068
- Wilsonville
- $4,899,160
- 1/29/26
- ITB North Fork Slide Stabilization Slide 2 North Fork Road SE
- Marion County
- $7,257,067
- 1/28/26
- Galveston Ave Pressure Reducing Valve Replacement
- Bend
- $239,070
- 1/7/26
- US101 39th St Holmes Rd Lincoln City
- ODOT
- $729,290
- 11/23/26
- 120
- 0%
- -
- $729,290
- Galveston Ave Pressure Reducing Valve Replacement
- ODOT
- $2,543,970
- 09/21/26
- 120
- 19.2%
- $635,993
- $2,056,376
- Galveston Ave Pressure Reducing Valve Replacement
- Bend
- $308,940
- 07/26/26
- 120
- 66.7%
- $77,235
- $102,980
- Galveston Ave Pressure Reducing Valve Replacement
- Bend
- $875,680
- 06/29/26
- 120
- 89.2%
- $218,920
- $94,865
- Galveston Ave Pressure Reducing Valve Replacement
- Bend
- $979,609
- 06/27/26
- 120
- 90.8%
- $244,902
- $89,797
- Galveston Ave Pressure Reducing Valve Replacement
- Bend
- $1,278,135
- 06/27/26
- 120
- 90.8%
- $319,534
- $117,162
- Galveston Ave Pressure Reducing Valve Replacement
- Bend
- $2,778,605
- 06/20/26
- 120
- 96.7%
- $694,651
- $92,620
- $2,191,235
- $3,283,090