BidJudge.com - Projects
  • K&E Excavating
  • 2026
  • 17
  • 7
  • 41.18%
  • $16,022,006
  • 14.68%
  • 8.89%
  • 10.67%
  • $102,472,899
3871 Langley St SE
Salem OR
97317
503-399-4833
503-779-1192
Health Breakdown
Avg Left
-20
Success
50
Avg Avg
5
Year Proj
-30
2 Year Prior Proj
Qual Based
0
Cash Flow
-40
 
-35%
0%
Health
Financial Health & Pipeline Brief
Analyzed On:  Jun 29, 2026
K&E Excavating (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
Recent 2026 low bids totaling **$13.5M** across six projects, including the **$7.3M** North Fork Slide Stabilization and multiple **$1M+** street safety packages, will drive near-term cash inflows as work ramps up. The improved **40%** success rate supports steady backlog conversion from the current **$35.8M** remaining. Cash flow should remain positive provided mobilization on the April-May 2026 awards proceeds on schedule.

Medium-term Outlook (6-12 months)
Execution of larger 2025 awards such as the **$9.6M** Butler Market Roundabout and **$7.5M** Bear Creek Road project will sustain revenue through mid-2027, leveraging the **$35.8M** backlog. However, the drop in total low-bid volume from **$22.3M** in 2025 to **$13.5M** in 2026 signals potential softening unless bidding activity increases. Extended 120-month durations on most contracts will stretch cash flow timing.

Key Risk Period
The 6-9 month window following completion of the smaller 2026 neighborhood packages presents the highest risk, as the current backlog may deplete without sufficient new wins at the prior **31-40%** success rates. Long contract durations further amplify exposure to delayed payments or cost overruns.

Recommendations
Prioritize aggressive bidding to rebuild backlog above **$50M** while tightening change-order and billing cycles on long-duration projects. Monitor monthly cash conversion from the **$35.8M** backlog to maintain liquidity through the identified risk period.
 
JOBS LOW
  • US20 Harney St Moore Dr Newport
  • ODOT
  • 7/23/26
  • SW 19th Knoll Stormwater Improvements
  • Bend
  • 5/27/26
  • 2nd Street Water Improvements
  • Bend
  • 4/30/26
  • 2026 Neighborhood Street Safety Program Package B
  • Bend
  • 4/28/26
  • 2026 Neighborhood Street Safety Program Package A
  • Bend
  • 4/28/26
  • Neff Pedestrian Bicycle Improvements
  • Bend
  • 4/21/26
  • ITB North Fork Slide Stabilization Slide 2 North Fork Road SE
  • Marion County
  • 1/28/26
Bidjudge
JOBS BID
  • Astoria Cottage Grove Curb Ramps
  • ODOT
  • $11,997,132
  • 7/23/26
  • US20 Harney St Moore Dr Newport
  • ODOT
  • $2,543,970
  • 7/23/26
  • SW 19th Knoll Stormwater Improvements
  • Bend
  • $308,940
  • 5/27/26
  • 15th Ferguson RAB Construction
  • Bend
  • $3,480,719
  • 5/6/26
  • 2nd Street Water Improvements
  • Bend
  • $875,680
  • 4/30/26
  • 2026 Neighborhood Street Safety Program Package B
  • Bend
  • $979,609
  • 4/28/26
  • 2026 Neighborhood Street Safety Program Package A
  • Bend
  • $1,278,135
  • 4/28/26
  • Neff Pedestrian Bicycle Improvements
  • Bend
  • $2,778,605
  • 4/21/26
  • Bend Bikeways Construction SE 9th Street NE Bear Creek Rd SE 15th Street North
  • Bend
  • $2,390,040
  • 4/7/26
  • US97 Earl St Colfax Ln Madras Section
  • ODOT
  • $22,649,354
  • 4/2/26
  • 100343 Century Blvd Extension SE Lois Street E Main Street
  • Washington County
  • $28,954,634
  • 3/11/26
  • Azalia Windsor Sewer
  • Bend
  • $2,485,542
  • 2/24/26
  • Polk County OR22 Perrydale Rd Kings Valley Highway Section Willamina
  • ODOT
  • $7,180,531
  • 2/19/26
  • King Hezekiah Fargo Sewer
  • Bend
  • $2,174,711
  • 2/3/26
  • Ash Meadows Boeckman Creek Flow Mitigation 7068
  • Wilsonville
  • $4,899,160
  • 1/29/26
  • ITB North Fork Slide Stabilization Slide 2 North Fork Road SE
  • Marion County
  • $7,257,067
  • 1/28/26
  • Galveston Ave Pressure Reducing Valve Replacement
  • Bend
  • $239,070
  • 1/7/26
Bidjudge
CASH FLOW
  • Galveston Ave Pressure Reducing Valve Replacement
  • Bend
  • $308,940
  • 07/26/26
  • 120
  • 6.7%
  • $77,235
  • $288,344
  • Galveston Ave Pressure Reducing Valve Replacement
  • Bend
  • $875,680
  • 06/29/26
  • 120
  • 29.2%
  • $218,920
  • $620,273
  • Galveston Ave Pressure Reducing Valve Replacement
  • Bend
  • $979,609
  • 06/27/26
  • 120
  • 30.8%
  • $244,902
  • $677,563
  • Galveston Ave Pressure Reducing Valve Replacement
  • Bend
  • $1,278,135
  • 06/27/26
  • 120
  • 30.8%
  • $319,534
  • $884,043
  • Galveston Ave Pressure Reducing Valve Replacement
  • Bend
  • $2,778,605
  • 06/20/26
  • 120
  • 36.7%
  • $694,651
  • $1,759,783
  • $1,555,242
  • $6,773,976
Bidjudge