- MASCI General Contractor
- 2026
- 45
- 16
- 35.56%
- $101,025,893
- 8.46%
- 76.30%
- 39.03%
- $578,767,585

The contractor holds **$63M** in remaining backlog, with multiple large projects awarded in mid-2026 such as T5891 (**$14.9M**) and CT260715 (**$19.8M**) still fully intact. This supports stable near-term revenue as work progresses on recently bid contracts, though extended durations may slow initial cash inflows. Success rate improvement to **29.7%** indicates stronger pipeline conversion.
Medium-term Outlook (6-12 months)
Continued execution of the **$63M** backlog combined with **$71M** in 2026 awards positions the firm for sustained activity through 2027, supported by an elevated bid volume of 37 jobs. Cash flow should stabilize as partial completions on projects like T5863 and T5874 release retainage.
Key Risk Period
Extended contract durations reaching 590 months create prolonged revenue recognition cycles that could strain working capital, especially given the **10.25%** average left on low bids. The period 9-15 months out represents the highest exposure if new awards slow.
Recommendations
Accelerate mobilization on shorter-duration projects to improve liquidity and target bids with tighter margins under **6%** to boost win rates. Monitor monthly burn rates against the **$63M** backlog to maintain positive cash flow.
- ITB 2026-06 Fillmore Avenue Townhomes Stormwater Construction
- Cape Canaveral
- 11/5/26
- T5914 BREVARD
- FDOT
- 10/28/26
- CDBG DR Lantern Park Stormwater Pond Construction
- Volusia County
- 10/5/26
- T5893 VOLUSIA
- FDOT
- 9/30/26
- T5891 BREVARD
- FDOT
- 7/29/26
- T5889 Brevard SR 46
- FDOT
- 7/29/26
- CT260715 SR 400 I 4 SR 600 US 17 92
- FDOT
- 7/29/26
- Pioneer Trail Williams Road Intersection Improvements
- Volusia County
- 6/25/26
- DeLand Municipal Airport South Central Apron Rehabilitation
- Deland
- 5/21/26
- T5863 SEMINOLE
- FDOT
- 5/20/26
- Asphalt Paving Services
- Palm Coast
- 4/23/26
- T5877 [DISTRICT 05]
- FDOT
- 3/25/26
- Knox McRae Master Pump Station Improvements
- Titusville
- 3/20/26
- North Donnelly Street Emergency Roadway Repair Permanent
- Mount Dora
- 3/16/26
- Fillmore Ave Reconstruction
- Cape Canaveral
- 2/12/26
- T5874 ORANGE
- FDOT
- 1/28/26
- ITB 2026-06 Fillmore Avenue Townhomes Stormwater Construction
- Cape Canaveral
- $457,285
- 11/5/26
- T2A73 ST JOHNS
- FDOT
- $24,465,702
- 10/28/26
- T5914 BREVARD
- FDOT
- $20,411,473
- 10/28/26
- Stirling Avenue Bridge Replacement
- Winter Park
- $5,991,169
- 10/14/26
- CDBG DR Lantern Park Stormwater Pond Construction
- Volusia County
- $2,730,394
- 10/5/26
- T5893 VOLUSIA
- FDOT
- $5,641,959
- 9/30/26
- T5890 ORANGE
- FDOT
- $9,475,265
- 8/26/26
- Collection System Improvements Phase 1
- Ponce Inlet
- $9,517,021
- 8/5/26
- Halifax River Force Main Reclaimed Water Main Crossing
- Ormond Beach
- $19,266,951
- 7/29/26
- T5891 BREVARD
- FDOT
- $14,950,329
- 7/29/26
- CT260715 SR 400 I 4 SR 600 US 17 92
- FDOT
- $19,820,018
- 7/29/26
- T5889 Brevard SR 46
- FDOT
- $2,981,009
- 7/29/26
- Pioneer Trail Williams Road Intersection Improvements
- Volusia County
- $718,852
- 6/25/26
- Midfield Utility Infrastructure Project S Beardall Avenue Moores Station Road
- Orlando Sanford Intl Airport
- $3,820,432
- 6/11/26
- T5885 VOLUSIA
- FDOT
- $44,188,166
- 6/10/26
- T5884 VOLUSIA
- FDOT
- $39,757,749
- 6/10/26
- Division Street Roadway Improvements
- Daytona Beach
- $939,880
- 5/22/26
- DeLand Municipal Airport South Central Apron Rehabilitation
- Deland
- $710,809
- 5/21/26
- T5863 SEMINOLE
- FDOT
- $5,972,774
- 5/20/26
- US 17 92 Overpass Pedestrian Improvements
- Seminole County
- $5,495,236
- 5/20/26
- A1A Sewer Force Main Mala Compra Marineland
- Palm Coast
- $7,243,245
- 5/19/26
- 19 Central Place Pipe Replacement
- Palm Coast
- $1,413,963
- 5/14/26
- Rockledge Drive Septic Sewer SOIRL South Central Zone A Roadway Drainage Improvements
- Brevard County
- $10,384,384
- 5/7/26
- Alexander Island Park Phase 1
- DeBary
- $3,591,226
- 5/4/26
- Daytona Beach International Airport Taxiway P3 P4 Improvements
- Volusia County
- $3,509,827
- 4/24/26
- Asphalt Paving Services
- Palm Coast
- $285,765
- 4/23/26
- Taxiway A West Extension
- Orlando Sanford Intl Airport
- $12,753,983
- 4/23/26
- Dirt Pave 2025
- Putnam County
- $7,616,567
- 4/14/26
- First Avenue Sidewalk Roadway Improvements FY26 CDBG
- Titusville
- $832,380
- 4/7/26
- Tomoka Farms Road Landfill Southeast Area Construction Cell I
- Volusia County
- $40,650,653
- 4/2/26
- Lockwood Blvd Force Main Reclaim Water Main Construction (REBID)
- Seminole County
- $2,644,349
- 4/1/26
- T5877 [DISTRICT 05]
- FDOT
- $5,958,391
- 3/25/26
- T5876 BREVARD
- FDOT
- $47,241,228
- 3/25/26
- Knox McRae Master Pump Station Improvements
- Titusville
- $4,498,485
- 3/20/26
- East Service Area John Wycliffe Blvd 20 Inch Reclaimed Water Main Reclaimed Water Storage Repump
- Orange County - FL
- $14,520,025
- 3/19/26
- North Donnelly Street Emergency Roadway Repair Permanent
- Mount Dora
- $1,856,459
- 3/16/26
- Riverside Park Parking Lot Resurfacing
- Oviedo
- $425,521
- 2/26/26
- BID 2026 10 A1A Utility Relocations Phase 2
- Ormond Beach
- $855,557
- 2/25/26
- Fillmore Ave Reconstruction
- Cape Canaveral
- $4,508,645
- 2/12/26
- T5875 FLAGLER
- FDOT
- $14,376,121
- 1/28/26
- T5874 ORANGE
- FDOT
- $9,523,246
- 1/28/26
- E8V59 LAKE
- FDOT
- $139,958,094
- 1/27/26
- BID 2026 08 2026 Roadway Resurfacing
- Ormond Beach
- $659,983
- 1/12/26
- City Lake Mary Milling Paving
- Lake Mary
- $1,942,283
- 1/12/26
- Replacement Seminole Lift Station Demolition Bayview Lift Station
- Titusville
- $4,204,732
- 1/7/26
- ITB 2026-06 Fillmore Avenue Townhomes Stormwater Construction
- Cape Canaveral
- $457,285
- 01/04/27
- 120
- 0%
- -
- $457,285
- T5914 BREVARD
- FDOT
- $20,411,473
- 12/27/26
- 110
- 0%
- -
- $20,411,473
- CDBG DR Lantern Park Stormwater Pond Construction
- Volusia County
- $2,730,394
- 12/04/26
- 120
- 0%
- -
- $2,730,394
- T5893 VOLUSIA
- FDOT
- $5,641,959
- 11/29/26
- 29
- 0%
- -
- $5,641,959
- Replacement Seminole Lift Station Demolition Bayview Lift Station
- FDOT
- $14,950,329
- 09/27/26
- 290
- 17.9%
- $1,546,586
- $12,269,580
- Replacement Seminole Lift Station Demolition Bayview Lift Station
- FDOT
- $19,820,018
- 09/27/26
- 400
- 13.0%
- $1,486,501
- $17,243,416
- Replacement Seminole Lift Station Demolition Bayview Lift Station
- FDOT
- $2,981,009
- 09/27/26
- 210
- 24.8%
- $425,858
- $2,242,854
- Replacement Seminole Lift Station Demolition Bayview Lift Station
- Volusia County
- $718,852
- 08/24/26
- 120
- 71.7%
- $179,713
- $203,675
- Replacement Seminole Lift Station Demolition Bayview Lift Station
- FDOT
- $5,972,774
- 07/19/26
- 590
- 20.7%
- $303,700
- $4,737,726
- Replacement Seminole Lift Station Demolition Bayview Lift Station
- FDOT
- $5,958,391
- 05/24/26
- 190
- 93.7%
- $940,799
- $376,319
- Replacement Seminole Lift Station Demolition Bayview Lift Station
- FDOT
- $9,523,246
- 03/29/26
- 360
- 65.0%
- $793,604
- $3,333,136
- Replacement Seminole Lift Station Demolition Bayview Lift Station
- FDOT
- $12,993,379
- 12/28/25
- 550
- 59.1%
- $708,730
- $5,315,473
- $6,385,491
- $74,963,290

