Financial Health & Pipeline Brief
Analyzed On:  Aug 13, 2026
Strider Construction Co (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
Strider Construction Co maintains a thin active backlog of **$983,979** on the Drayton Harbor project, supporting limited cash flow through mid-2026. With a **12.5%** success rate on **$14.4M** in 2026 bids, near-term revenue remains constrained unless additional low bids convert quickly. The 120-month project duration provides some stability but minimal near-term volume.

Medium-term Outlook (6-12 months)
Backlog depletion accelerates beyond the current **$984k** remaining, requiring conversion of the **$155.7M** 2025 bid pipeline to sustain operations. At a consistent **12%** win rate, the firm risks revenue gaps unless bidding volume increases or margins improve from the current **1.03%** average left on low bids.

Key Risk Period
The primary risk window emerges in late 2026 through early 2027 as the single active project winds down without a replenished pipeline. Low historical success rates and concentrated backlog exposure could trigger cash flow shortfalls during this transition.

Recommendations
Prioritize aggressive bidding on shorter-duration projects to rebuild backlog above **$10M** within six months. Implement targeted win-rate improvements and monitor burn rate on the existing **$2.2M** contract to preserve liquidity.
 
JOBS LOW
  • 2027 123rd Ave NE Culvert Replacements
  • Snohomish County
  • 11/3/26
  • 88th Street NE Corridor Improvement
  • Marysville
  • 9/2/26
  • 26 11 Drayton Harbor Rd Landslide Repair
  • Whatcom County
  • 4/7/26
Bidjudge
JOBS BID
  • 2027 123rd Avenue NE Culvert Replacements
  • Snohomish County
  • $1,993,000
  • 11/3/26
  • 2027 123rd Ave NE Culvert Replacements
  • Snohomish County
  • $4,720,779
  • 11/3/26
  • Post Point Sludge Tank Replacement
  • Bellingham
  • $16,780,764
  • 10/28/26
  • Lift Station 24 Conveyance Improvements
  • Everett
  • $2,047,490
  • 9/29/26
  • Arkema Interim Action Phase 1 2026
  • Tacoma
  • $7,867,212
  • 9/17/26
  • 1400 Reservoir Lake Meridian Water District
  • Kent
  • $17,323,106
  • 9/16/26
  • 88th Street NE Corridor Improvement
  • Marysville
  • $15,041,454
  • 9/2/26
  • Gilman Well Facility Upgrade
  • Issaquah
  • $898,718
  • 8/27/26
  • 2026 Yakima River Gap Restoration
  • Yakima County
  • $5,158,920
  • 8/26/26
  • Samish Way Utility Replacements
  • Bellingham
  • $4,446,144
  • 8/12/26
  • 26 12 Central Shop NPDES Stormwater Improvements Phase 2
  • Whatcom County
  • $1,468,261
  • 5/5/26
  • 26 11 Drayton Harbor Rd Landslide Repair
  • Whatcom County
  • $2,227,877
  • 4/7/26
  • 2026 Doon Way Waterline Replacements
  • Anacortes
  • $1,456,599
  • 3/25/26
  • Little Squalicum Water Quality Retrofits Phase 2 EV 177
  • Bellingham
  • $2,436,562
  • 3/4/26
  • 2026 Terrace Drive Utility Improvements
  • Anacortes
  • $444,835
  • 2/3/26
  • Queensborough Sewer Rehabilitation
  • Alderwood Water and Wastewater District
  • $3,524,347
  • 2/3/26
  • Totem Pole Road Improvements Phase I
  • Chelan County
  • $2,486,734
  • 1/27/26
  • Depot Market Plaza Expansion
  • Anacortes
  • $337,008
  • 1/22/26
Bidjudge
CASH FLOW
  • Depot Market Plaza Expansion
  • Marysville
  • $15,041,454
  • 11/01/26
  • 120
  • 20.0%
  • $3,760,364
  • $12,033,163
  • $3,760,364
  • $16,753,942